• Title/Summary/Keyword: Tunnel blasting design

Search Result 105, Processing Time 0.027 seconds

Estimation of critical vibration level on structural damage of brick house induced by blasting (발파진동으로 인한 조적조 가옥 피해의 임계수준 평가)

  • 양형식;김남수;전양수;정지문;문승백;조상호
    • Tunnel and Underground Space
    • /
    • v.9 no.1
    • /
    • pp.72-77
    • /
    • 1999
  • New criteria to evaluate blasting damage to structure is proposed considering environmental caused daily deformation of cracks in structures. Results from 3 brick houses in fishing village shows that more than 10 times higher vibration level than design criteria of 0.5 kine is required to cause structural damage.

  • PDF

Optimization of Tunnel Blasting Design by Finite Element Method (유한요소해석을 이용한 터널 발파설계의 최적화)

  • 이인모;최종원;김상균;김동현;이두화;김영욱
    • Journal of the Korean Geotechnical Society
    • /
    • v.16 no.5
    • /
    • pp.63-74
    • /
    • 2000
  • 지하구조물 걸설시 발파에 의한 암반의 굴착공법이 일반적으로 사용된다. 그러나 발파에 의한 암반의 굴착은 잔존암반의 손상과 진동을 유발하는 문제점을 가지고 있다. 현재까지는 이러한 암반의 손상과 진동문제를 해결하기 위해 현장계측을 기초로한 경험적인 방법이 이용되어 왔으나 여러 가지 한계점을 지니고 있는 것이 현실이다. 따라서 수치해석에 의한 터널 발파의 모델링을 이용하면 이러한 한계점을 보완할수 있을 것이다. 본 논문에서는 발파에 의한 발파공 주위 암반의 거동을 유한요소해석을 이용하여 규명하고, 토로터널의 표준발파패턴을 기초로 하여 외과공 발파와 외곽공에 인접한 주변공 발파에 의한 암방의 손상의 손상을 비교하여 발파패턴의 적절성을 평가하고자 하였으며, 이를 근거응 발파에 의한 암반의 손상을 최소하기 위한 발파패턴의 최적화를 도모하였다.

  • PDF

Application of risk analysis and assessment considering tunnel stability and environmental effects in tunnel design (터널 안정성 및 환경성을 고려한 위험도 평가기법의 적용)

  • Kim, Young-Geun;Kim, Do-Hyung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.10 no.1
    • /
    • pp.1-15
    • /
    • 2008
  • Recently, because of the various factors by uncertainty of underground, the risks in tunnelling have been occurred increasingly. Therefore, it is very important to estimate and control the risks considering geotechnical conditions for tunnel stability and environmental problems by tunnel construction. In this study, the risk analysis for tunnel stability was carried out by classifying the risk factors such as ground support capacity, ground settlement, the inflow of groundwater into the tunnel and the damage by the earthquake. Also, the risk assessment for the environmental problems was performed by calculating the vibration and noise by blasting and the drawdown of the groundwater level caused by tunnel construction. Each risk factor was evaluated quantitatively based on the probabilistic and statistic technique, then it was analyzed the distribution characteristic along overall tunnel site. Finally, it was evaluated that how much each risk factor influences on the construction cost with a period for tunnel construction, so it is possible to perform reasonable tunnel design which was capable of minimizing the risks in the tunnel construction.

  • PDF

Numerical Analysis of Concrete Lining and Rockbolt Behavior of the Tunnel Associated with Blast-induced Vibration (발파진동으로 인한 터널 콘크리트 라이닝과 록볼트 거동의 수치해석적 분석)

  • Jeon, Sang-Soo;Jang, Yang-Won
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.9 no.5
    • /
    • pp.69-78
    • /
    • 2009
  • Since the blast vibration induced by explosives of the powder possibly provide damage of the nearby structures adjacent to the tunnel, the stability of the nearby structures should be estimated. In this study, the stability of the tunnel based on the allowable peak particle velocity of the structures as well as allowable stress of the structures presented in the concrete structural design standard was estimated with respect to the stress of the concrete lining and axial force of the rockbolt during the blasting operation at the ground surface of the pre-existing tunnel. The analyses were carried out by using $FLAC^{2D}$ which is one of the programs developed based on the finite difference method. The bending compressive stress and shear stress of the concrete lining and axial force of the rockbolt were rapidly increased when the blasting operation was conducted near the tunnel.

A Evaluation of Standard Support Pattern for Two-Arch Road Tunnel (2-Arch 도로터널에 적용된 표준지보패턴의 적정성 검토)

  • Chun, Byungsik;Choi, Kwangbo;Kim, Hyeyang;Yoo, Junhee
    • Journal of the Korean GEO-environmental Society
    • /
    • v.9 no.7
    • /
    • pp.25-35
    • /
    • 2008
  • In domestic cases, the standard support pattern of 2-lanes road tunnels is presented because construction experience and high degree various data was abundant. But, it is not desirable to apply standard for 2-Arch tunnels that the precedent and measuring data is insufficient existing support pattern blasting plan and interpretation of separate way concerning specific terrain and rock quality. In this study, behavior according to load distribution ratio and Unsymmetrical Pressure about standard support pattern which is applied in design and construction of 2-arch tunnels was analysed and the examination of blasting vibration has influence on the center wall is conducted as a consequence reasonableness of support whether or not with presumed support pressure and ground reaction curve method. In result appropriateness of standard support pattern, support quantity is proper but considers specific terrain and rock quality condition when design and construction of further step 2-arch tunnel standard support pattern must be decided by considering terrains, soil properties and construction condition of the objective tunnel.

  • PDF

A study on Actual Quantity of Shotcrete Sprayed in a NATM tunnel (NATM 산악터널의 숏크리트 투입율에 관한 연구)

  • Lee, Cheol-Ju;Kim, Sung-Yun;Kim, Dong-Gun;Yoo, Nam-Jae
    • Journal of Industrial Technology
    • /
    • v.29 no.B
    • /
    • pp.57-64
    • /
    • 2009
  • This study has analysed actual overbreak, shotcrete rebound and the ratio between the actual quantity of shotcrete to designed shotcrete measured during a NATM tunnel construction. The measured shotcrete rebound was about 7.2% in average which was about half the allowable rebound (15%), showing shotcrete spraying was performed well. Based on the measurement of excavated tunnel shape, average overbreak was about 28.5cm after tunnel excavation by drill and blasting method. This was about 260% of allowable overbreak. In addition, due to the rebound and overbreak actual amount of shotcrete used in the tunnelling work was about 116.5 % of the designed value. According to the field measurement the ratio of actual shotcrete to designed value showed some relation with standard support pattern, but the size of overbreak did not show the correlation with standard support pattern. Hence current design specifications stating the size of overbreak based entirely on standard support pattern should perhaps be reestablished. The insight into the design guideline regarding overbreak and shotcrete.

  • PDF

Numerical Analysis of Surface Displacement Due to Explosion in Tunnel (터널 내 폭발에 의한 지표 변위에 관한 수치해석적 연구)

  • Park, Hoon
    • Explosives and Blasting
    • /
    • v.38 no.4
    • /
    • pp.26-36
    • /
    • 2020
  • With the increase of expansion and use of the underground space, the possibility of an underground explosion by terrorists is increasing. In this study, after modeling a circular tunnel excavated at a depth of 50m, an explosion load was applied to the inside of the tunnel. As for the explosion load, the explosion load of the maximum explosive amount for six types of vehicle booms proposed by ATF (Bureau of Alcohol, Tobacco, and Firearms) was calculated. For the rock mass around the circular tunnel, three types of rock grades were selected according to the support pattern suggested in the domestic tunnel design. Nonlinear dynamic analysis was performed to evaluate the influence of the ground structure by examining the surface displacement using the explosion load and rock mass characteristics as parameters. As a result of the analysis, for grade 1 rock, the influence on the uplift of the surface should be considered, and for grade 2 and 3 rocks, the influence on a differential settlement should be considered. In particular, for grade 3 rocks, detailed analysis is required for ground-structure interaction within 40m. Also, it is considered that the influence of Young's modulus is the main factor for the surface displacement.

Prediction and Determination of Correction Coefficients for Blast Vibration Based on AI (AI 기반의 발파진동 계수 예측 및 보정계수 산정에 관한 연구)

  • Kwang-Ho You;Myung-Kyu Song;Hyun-Koo Lee;Nam-Jung Kim
    • Explosives and Blasting
    • /
    • v.41 no.3
    • /
    • pp.26-37
    • /
    • 2023
  • In order to determine the amount of explosives that can minimize the vibration generated during tunnel construction using the blasting method, it is necessary to derive the blasting vibration coefficients, K and n, by analyzing the vibration records of trial blasting in the field or under similar conditions. In this study, we aimed to develop a technique that can derive reasonable K and n when trial blasting cannot be performed. To this end, we collected full-scale trial blast data and studied how to predict the blast vibration coefficient (K, n) according to the type of explosive, center cut blasting method, rock origin and type, and rock grade using deep learning (DL). In addition, the correction value between full-scale and borehole trial blasting results was calculated to compensate for the limitations of the borehole trial blasting results and to carry out a design that aligns more closely with reality. In this study, when comparing the available explosive amount according to the borehole trial blasting result equation, the predictions from deep learning (DL) exceed 50%, and the result with the correction value is similar to other blast vibration estimation equations or about 20% more, enabling more economical design.

A Case Study on Blasting Vibration 3D Modelling with Electronic-Delay System Detonator (전자발파시스템을 이용한 발파진동 3D 모델링 연구 사례)

  • Kim, Gab-Su;Yang, Ruilin;Kim, Yong-Gyun;Kang, Dae-Woo
    • Tunnel and Underground Space
    • /
    • v.24 no.2
    • /
    • pp.131-142
    • /
    • 2014
  • This study is using electronic-delay system detonator which can input an accurate detonating delay, compare predicted blasting vibration level derived from vibration 3D modelling with real measured blasting vibrations, and then considered modelling results are able to apply blast design. It confirmed there are certain relations between modelling and real vibration data, so modelling prediction method also can be apply design various blast conditions and prediction equation of blast vibration.

Analysis of Response Spectrum of Ground Motions from Mine Blasting (발파에 의한 지반진동의 응답스펙트럼 분석)

  • Kim, Jun-Kyoung
    • Tunnel and Underground Space
    • /
    • v.15 no.5 s.58
    • /
    • pp.338-343
    • /
    • 2005
  • This study analysed response spectrum using the observed ground motion from the mine blasting and, then compared the results to the seismic design response spectra applied domestic nuclear power plants. The results showed that the resultant response spectra above 20 Hz revealed higher values than the design response spectra and those below 20 Hz revealed much lower values. These facts suggest that the analysis of response spectrum should be applied to the analysis of impacts to frequency dependent structures in addition to the analysis of peak values of ground motions.