A study on Actual Quantity of Shotcrete Sprayed in a NATM tunnel

NATM 산악터널의 숏크리트 투입율에 관한 연구

  • Published : 2009.08.31

Abstract

This study has analysed actual overbreak, shotcrete rebound and the ratio between the actual quantity of shotcrete to designed shotcrete measured during a NATM tunnel construction. The measured shotcrete rebound was about 7.2% in average which was about half the allowable rebound (15%), showing shotcrete spraying was performed well. Based on the measurement of excavated tunnel shape, average overbreak was about 28.5cm after tunnel excavation by drill and blasting method. This was about 260% of allowable overbreak. In addition, due to the rebound and overbreak actual amount of shotcrete used in the tunnelling work was about 116.5 % of the designed value. According to the field measurement the ratio of actual shotcrete to designed value showed some relation with standard support pattern, but the size of overbreak did not show the correlation with standard support pattern. Hence current design specifications stating the size of overbreak based entirely on standard support pattern should perhaps be reestablished. The insight into the design guideline regarding overbreak and shotcrete.

Keywords