• Title/Summary/Keyword: Tunnel blasting design

Search Result 105, Processing Time 0.026 seconds

A study on Tunnel Design Application of Borehole Blasting Data (시추공 발파 자료의 터널설계 적응성에 관한 연구)

  • 임성식;양형식
    • Explosives and Blasting
    • /
    • v.21 no.2
    • /
    • pp.15-19
    • /
    • 2003
  • 터널 및 지하공동 설계에 이용된 16개 지역 23개 구간의 578개의 시추공 진동 data와 일반터널 4개 지역으로부터 221개 data를 이용하여 시추공발파의 진동전달 특성을 분석하였다. 시추공발파와 일반발파의 진동속도 감쇠 경향을 비교분석한 결과 시추공발파의 입지상수들이 크게 나타났다. 환산거리 증가에 따른 두 진동식의 최대 허용장약량은 시추공발파가 적었다. 이러한 결과로부터 시추공발파 자료를 터널발파 설계에 사용할 수는 있으나 조심스러운 통계적 처리가 불가피할 것으로 판단된다.

Control of Blast Vibration, Air Blast, and Fly Rock in Rock Excavation (암반굴착에 의한 발파진동, 소음 및 비석의 조절)

  • Ryu, Chang-Ha
    • Tunnel and Underground Space
    • /
    • v.2 no.1
    • /
    • pp.102-115
    • /
    • 1992
  • Blasting operations associated with rock excavation work may have an environmental impact in nearby structures or human beings. With the increase of construction work in urban areas, vibration problems and complaints have also increased. In order to determine the optimum design parameters for safe blast, it is essential to understand blast mechanism, design variables involved in blast-induced damage, and their effects on the blasting results. This paper deals with the characteristics of ground vibrations, air blast and fly rock caused by blast, including the general method of establishing the vibration predictors, and damage criteria suggested by various investigators. The results of field measurements from open pit mine and tunnel construction work are discussed. Basic concepts of how to design blast parameters to control the generation of ground vibrations, air blast and fly rock are presented.

  • PDF

A Case Study On The Design of Tunnel Type Spillway (터널형 비상여수로의 설계 사례)

  • Baek, Seung-Kyu;Choo, Seok-Yeon;Baek, Un-Il;Park, Hyung-Seop
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.10a
    • /
    • pp.153-160
    • /
    • 2006
  • Tunnel type spillway is rarely constructed in worldwide, and designed secondary in Korea. In this paper we pronounce a case study of tunnel type spillway design. We firstly considered lining concrete abrasiveness and cavitations for tunnel safety. This paper describes the design of tunnel type spillway section, excavation method, blasting, support and concrete lining.

  • PDF

Assessment of Rock Mass Properties Ahead of Tunnel Face Using Drill Performance Parameters (천공데이터를 활용한 터널 막장 전방 암반특성 평가)

  • Kim, Kwang-Yeom;Kim, Chang-Yong;Chang, Soo-Ho;Seo, Kyeong-Won;Lee, Seung-Do
    • Explosives and Blasting
    • /
    • v.25 no.1
    • /
    • pp.67-77
    • /
    • 2007
  • The drill monitoring data are useful for the detection of abrupt and unexpected changes in ground renditions. This paper introduces a new approach to how drill performance parameters can be used for the prediction of quantitative rock mass properties ahead of tunnel face and the blasting design. The drill monitoring parameters available for the predictions include the instantaneous advance speed, thrust force, torque, tool pressure and penetration rate. The assessment of the drill monitoring parameters will be able to build a database provided that in-situ drill monitoring informations are accumulated and enable us to make a reasonable blast design based on quantitative assessment of rock mass.

A Study on the Effect of Artificial Cutting Slot on the Fragmentation and Vibration Propagation in the Full-scaled Concrete Block Blasting (콘크리트 블록 발파 실험을 통한 인공 슬롯 자유면이 진동전파 및 파쇄효과에 미치는 영향에 관한 연구)

  • Oh, Se-Wook;Min, Gyeong-Jo;Park, Se-Woong;Park, Hoon;Noh, You-Song;Suk, Chul-Gi;Cho, Sang-Ho
    • Tunnel and Underground Space
    • /
    • v.28 no.6
    • /
    • pp.692-705
    • /
    • 2018
  • Ground vibration is one of the remarkable issues in tunnel blasting. In recent studies, to improve the fragmentation with reduction of ground vibration in tunnel blasting, a vibration-controlled blasting method with artificial cutting slot near the center-cut holes has been suggested. This study examines the effect of the different arrangement of artificial cut-slot on the vibration reduction and fragmentation by performing the full-scaled concrete block blast experiments and the numerical simulations with 3D-DFPA. The results show that the existence of artificial slot contributes to the improvement of vibration reduction, blast fragmentation and the efficiency of the cutting slot blast. It can be explained that the artificial slot play a free surface role and should decrease the burden between the cut holes. Crater volumes of the blasted concrete blocks were measured by 3-dimensional digital image analysis and compared with the ideal standard crater volume which can be calculated by theoretical standard blast design method. As a result, the ratio of burden and hole diameter which should achieve the standard crater in the cut-hole blasting were suggested.

A Case Study of Tunnel Electronic Blasting to Control Vibration in the Proximity of the Safety Facilities (근접 보안물건의 진동제어를 위한 터널 전자발파 시공사례)

  • Seo, Yun-Sik;Woo, Sang-Don;Kwon, Yeong-Bok;Kim, Jong-Su;Choi, Hyeong-Bin;Kim, Seon-Hong;Kim, Gab-Soo;Kim, Jae-Hoon;Kim, Hee-Do;Lee, Jun-Won
    • Explosives and Blasting
    • /
    • v.30 no.1
    • /
    • pp.37-51
    • /
    • 2012
  • In this case of "Seongnam~Yeoju double-lanes railroad construction", there were safety facilities which were concerned about damages from vibration and noise. In the project design stage, the rock-splitter method was designed to prevent them. The electronic blasting was considered to improve construction speed and economic value as an alternative tunnelling method, complying with the site's vibration criteria(cowhouse : 0.09cm/sec, residence : 0.2cm/sec). In the environment evaluation report of the eDev, tunnel electronic blasting systems, the blasting pollutions can be managed by the electronic blasting method. The results were successfully conducted with high speed construction without any damages to adjacent facilities.

Cost-effectiveness of Tunnel Blasting Pattern by Applying Large Blasting Holes (대구경의 발파공을 적용한 터널 발파 패턴의 비용 효과)

  • Choi, Won-Gyu
    • Journal of Convergence for Information Technology
    • /
    • v.10 no.7
    • /
    • pp.147-152
    • /
    • 2020
  • The research is carried out to analyze the cost-effectiveness of blasting patterns with regard to the diameters and design of blasting holes. Blasting patterns for single diameter array, and mixed diameter array were comparatively analyzed with regard to drilling and charging time, and materials required. The number of blasting holes required for single array pattern and mixed array pattern were 138 and 93 holes, respectively. From the drilling time analysis, reduction in time and its efficiency of mixed pattern were 139 minutes and 25%, respectively, in comparison with single pattern. Charging time reduction and its efficiency of mixed blasting pattern were evaluated as 22.5 minutes per worker and 33%, respectively, compare to single blasting pattern. The explosive quantities of G1 and G2 required for single array patterns were 270 and 30, while those were 222 and 20 for mixed array patterns for tunnelling 4m. And single pattern required 45 more detonators than the mixed pattern. The evaluation of material required can also be positive parameter for cost reduction of tunnel construction.

Validity of the Attenuation Equation of MOCT Guide Line for Surface Rock Blasting (암발파 잠정지침 발파진동 추정식의 타당성)

  • Choi Mi-Jin;Yang Hyung-Sik
    • Tunnel and Underground Space
    • /
    • v.16 no.2 s.61
    • /
    • pp.189-193
    • /
    • 2006
  • Guide line for rock blasting design of the MOCT(Ministry of Construction and Transportation) adopts attenuation equation of du Pont company for blasting vibration. In this paper the validity of the equation is studied by comparing with several equations of Dowding, Devine and author's induced from the domestic vibration data. The equation is inadequately used and predicted values are proved to be underestimated and causes vibration problems.

A Case Study on the Design of Railway Tunnel through section for under OO temple (OO 사찰 하부 터널통과 설계 사례)

  • Kim, Shin;Lee, Sung-Ki;Seo, Hyoung-Chul;Kwag, Jung-Yeol;Cho, Bong-Sik
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.208-218
    • /
    • 2006
  • It is very important to evaluate predictable problems diversely such as stability of a tunnel and structures when tunnel is inevitably constructed in the area where is adjacent to a structure and low overburden. Double electrified railway design on the third section of Donghae-Nambu line studied in this paper has some problems mentioned above. So more careful works are required before construction. In this study, ground surrounding is composed of faults, fault zone and set back about 13m from a Buddhist temple located on the upper part of the tunnel. From these conditions, this case study presents proper methods considering ground condition, effects of blasting and civil petitions. It is tried to make the tunnel and Buddhist temple stable by analytical technique and analysis of existing cases. And design considering stability of tunnel and adjacent structure during operation is carried out as well. Especially, environmentally friendly railway tunnel which is appropriate to the local condition and surroundings is designed by minimizing noise and vibration that is able to occur during construction and train service. From now on, this study is helpful to better design in the case of tunnel design which has to consider civil petition.

  • PDF

Basic Study for Theoretical Design of Rock Blots at Seong Ju Tunnel (성주 터널에 사용될 Rock Bolt의 이론적인 설계 기준에 관하여)

  • 강선덕
    • Explosives and Blasting
    • /
    • v.16 no.2
    • /
    • pp.23-33
    • /
    • 1998
  • This study has been carried out to design the standards of rock bolts which are recommended to be used for supporting material in Seong Ju tunnel, Under recently planned to construct. Due to the weak bedding rocks along the Tunnel, NATM supporting method is assumed to be applied and the design and calculation for rock bolts which are important material for this supporting method. Though the study, the results obtained are as follows. 1) The rocks defined s coarse sandstone, fine sandstone, medium sandstone, sandy shale and silty shale are normal rocks in strength, and black shale, greywacke and conglomerate are weak rocks in strength. 2) When the length of 3∼4meters of rock bolts are used, the distances of bolts are supposed to be 1.3∼1.8m in sandstone and 1.3∼2.0m in shale and for greywacke the distance should be 1.5m.

  • PDF