• Title/Summary/Keyword: Trial construction

Search Result 266, Processing Time 0.029 seconds

Construction of Environmentally Friendly Roadbed by Reinforecing Type Soil Solidification Agent (보강형 고화제를 이용한 친환경 도로노반조성 방안)

  • Koh, Yong-Kook
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.667-671
    • /
    • 2004
  • The purpose of this paper is to study on the construction of environmentally friendly roadbed by reinforcing type soil solidification agent. The soil amendment agent used in this study is friendly to the environment, and has a function of soil-cement-agent solidification. The soil amendment agent was admixed with reinforced fiber material for enhancement of strength and durability of roadbed. The project of trial field test of roadbed construction with special reinforcing soil treatment agent was performed in Gyunggido on December 2003. A series of field and laboratory experiments including unconfined compressive strength, permeability were carried out to investigate the physical and mechanical characteristics of solidified roadbed treated by this reinforced solidifying agent. The results of this research showed that the roadbed using normal and poor soil could be efficiently constructed by treatment of this reinforcing type solidification agent admixed with fiber material.

  • PDF

A Study on the Development of Roof Integrated PV Module (Focused on the Prefab Building System) (지붕재 일체형 태양전지 모듈의 개발에 따른 내구성 평가 (조립식 건축시스템을 중심으로))

  • Yi, So-Mi;Noh, Ji-Hee;Lee, Eung-Jik
    • KIEAE Journal
    • /
    • v.6 no.4
    • /
    • pp.17-24
    • /
    • 2006
  • The application of photovoltaics into building as integrated building components has been paid more attention worldwide. Photovoltaics or solar electric modules are solid state devices, directly converting solar radiation into electricity; the process does not require fuel and any moving parts, and produce no pollutants. And the prefab building method is very effective because the pre- manufactured building components is simply assembled to making up buildings in the construction fields especially the sandwich panel. Architecture considerations for the integration of PV module to building envelope such as building structure, construction type, safety, regulation, maintenance etc. have been carefully refelected from the early stage of BIPV module design. Trial product of BIPV module are manufactured and sample construction details for demonstration building are purposed. Therefore, this paper intends to advanced its practical use by proposing how to get integrated PV system which can be applied to prefab building material, and how to apply it.

THE STUDY OF MULI-LEVEL PERFORMANCE MEASUREMENT APPROACH FOR VALUE MANAGEMENT OF CIVIL INFRASTRUCTURE PROJECTS

  • Jong-Kwon Lim;Min-Jae Lee;Dong-Youl Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1294-1299
    • /
    • 2009
  • Best value in value engineering has relation to cost and performance. But a severe problem in VE study of a project is to reduce value due to loss of performance, caused by focusing on cost reduction. Also a lack of understanding performance concept, no trial VE workshop as well as cost saving-based policy have not satisfied customer needs. A efficient and practical methodology for accomplishing best value in construction projects is proposed. This study developed a more objective approach for performance measurement approach of mega projects and suggested a systematic process of performance quantitative analysis verifying value improvement. The proposed performance measurement method would be very useful for better communication and consensus between stakeholders and VE team especially through value engineering.

  • PDF

Empirical Study on the Validity of Construction Bond-related Litigations (건설보증(建設保證) 분쟁해결(紛爭解決)의 소송(訴訟) 유효성(有效性)에 관(關)한 실증적(實證的) 연구(硏究))

  • Kim, Jong-Seo;Choi, Jong-Soo;Lee, Jae-Seob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.6
    • /
    • pp.99-111
    • /
    • 2006
  • Of the numerious dispute resolution methods, Alternative Dispute Resolution(ADR) is the most highly recommended approach for the guarantee bond-related dispute. In reality, however, claims were not resolved satisfactorily through ADR because of the lack of reference materials for negotiation, thus those were frequently had to be resolved through litigation. The above fact implies that, it is required to seek an efficient way to resolve the bond-related claims prior to they progress to litigation. This research paper intensively investigated judicial precedents of 232 cases with regard to construction bond-related disputes that observed during the analysis period(2000-2004). According to the summary statistics, it turned out that litigation were time consuming and potential economic loss was tremendous; on average, it takes 1067 days(the longest case was 1965 days) for dispute resolution. It suggests that litigations should be discouraged considering the magnitude of potential loss of stake holders. Research results revealed that there are some significant differences between categories in some variables affecting to the rate of winning; i) the number of lawsuit deputies of a plaintiff (in the 1st trial), ii) dispute locations (in the 1st and 3rd trials), iii) contract price (in the 1st trial), iv) contractors' operating capability (in the 1st and 2nd trials). For the rest of variables, significance level between categories was too low for preparing efficient improvement plan. Despite the important implications drawn from the analysis, this research has limitation due to the several reasons such as data structure, the depth of Information, etc. Therefore, more systematic research should be followed in the future.

SEVERAL METHODS OF FABRICATIONS OF INNER CROWN AND OUTER CROWN IN CONSTRUCTION OF KONUS DENTURE (다양한 Konus denture의 내관 및 외관의 제작방법)

  • Chung Jun-Yong
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.40 no.4
    • /
    • pp.406-413
    • /
    • 2002
  • The purpose of this article is the consolidation of several methods in fabrication of Konus denture. It is different Konus denture from traditional Clasped removable partial denture in the procedures of construction. There are multiple procedures of fabrications of inner and outer crowns in the construction of Konus denture. It is important to fabricate the inner crown, the outer crown and the denture framework in construction of Konus denture. Each procedure should be performed exactly. However, there are many procedures in fabrications of them, and thus, the operator and technician bear trial and error. This article consolidate the multiple methods of fabrications of components of Konus denture. The first method is completion of inner crown, outer crown and denture after one impression taking. The second method is the procedures of cementation of inner crown, impression taking of edentulous area, and completion of outer crown and denture. The third method is the procedures or pick up impression taking of inner crown and completion of outer crown and denture on the inner crown of working cast. Each method is acceptable, but operater and technician should be accustomed with their own systemic procedures and minimize the errors in the construction of denture.

A Landscape Design Proposal for Eunpyeong New Town, Seoul (서울 은평 뉴타운 1지구 조경설계)

  • Kim Soon-Boon;Chin Yang-Gyo
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.33 no.2 s.109
    • /
    • pp.111-121
    • /
    • 2005
  • The Seoul Housing Corporation pronounced an alternative design competition and a bidding for Eunpyeong New Town in December of 2004. At first many construction companies were interested in the first New Town Project. But at last a few companies had proposed the alternative design and construction cost. This project needed a conjunction of design ideas and technology know-hows. And the client wanted the brand power of construction company. Ultimately the Corporation hoped that the first New Town Project will end up with high quality successfully. This competition had started with the original construction drawings. Then it needed some alternative ideas and the lowest cost. There were two drawings of non changeable part and changeable part. Non changeable parts are structure like housing unit plan, underground parking lots. Changeable parts are outdoor layout, interior design and building facade. So we tried all ideas of landscape technology and design principles within limited guidelines. The author applied new technology like tilted rooftop greening and sustained container greening on high-rise apartment house. This green technology will be the first trial in Seoul and in the world as well. Daewoo Corporation have accumulated greening technology through the researches by national funding since 2002. Through this New Town Project the green technology will go forward step by step.

A Study of Abstracting Dispute Factor to Prevent Dispute in Early Stage for Construction Project - Focusing on Turn-Key Project - (프로젝트 초기 단계에서의 분쟁방지를 위한 분쟁요인 추출에 관한 연구 - 턴키공사 사례 중심으로 -)

  • Yoon Jun-Seon;Kwon Gi-Beom;Seo Choon-Taek;Paek Joon-Hong
    • Journal of Arbitration Studies
    • /
    • v.14 no.1
    • /
    • pp.315-344
    • /
    • 2004
  • Although we try to increase the order of turn key construction for the international competitiveness strengthening, the construction quality advancement and the productivity enhancement of the public sectors, the problems of the domestic turn key systems are causing the hardships of all the participants and many possible disputes. The home turn key constructions have been activated since 1997. A lot of trial and error had been experienced in these days, and the turn key systems have been changed little by little. But the bases are continuously kept because of their reflecting all the participants' opinions. In the inner turn key constructions the problems of uniform types are repeatedly occurred, and, especially, many problems happen up to the stage of early stage owing to the specialties of the turn key construction. So the dispute factors of the Korean turn key constructions were abstracted through the literature searches, the site document examinations, the case studies and the interviews with the experts. When the technicians meeting the interior turn key construction for the first time and working here now are well acquainted with only these factors, many disputes will be prevented.

  • PDF

Strength evaluation of concrete with fly ash and GGBFS as cement replacing materials

  • Chore, H.S.;Joshi, M.P.
    • Advances in concrete construction
    • /
    • v.3 no.3
    • /
    • pp.223-236
    • /
    • 2015
  • Concrete is the most widely used material of construction. Concrete gained the popularity as a construction material due to the easy availability of its component materials, the easy formability, strength and rigidity upon setting and curing.In construction industry, strength is the primary criterion in selecting a concrete for a particular application. Now a days, the substantial amount of waste materials, containing the properties of the Pozzolana, is being generated from the major industries; and disposal of such industrial wastes generated in abundance is also a serious problem from the environmental and pollution point of view. On this backdrop, efforts are made by the researchers for exploring the possible utilization of such waste materials in making the sustainable construction material. The present paper reports the experimental investigations to study the strength characterization of concrete made from the pozzolanic waste materials. For this purpose, the Pozzolanic materials such as fly ash and ground granulated blast furnace slag were used as a cement replacing materials in conjunction with ordinary Portland cement. Equal amount of these materials were used in eight trial mixes with varying amount of cement. The water cement ratio was also varied. The chemical admixture was also added to improve the workability of concrete. The compressive strengths for 7, 28, 40 and 90 days' were evaluated whereas the flexural and tensile strengths corresponding to 7, 28 and 40 days were evaluated. The study corroborates that the pozzolanic materials used in the present investigation along with the cement can render the sustainable concrete.

WHAT IS THE VALUE AND IMPACT OF EARLY DISPUTE EVALUATION IN THE UK AND INTERNATIONALLY?

  • Francine Baker
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.350-356
    • /
    • 2011
  • Early neutral evaluation (ENE) is a fairly recent form of alternative dispute resolution procedure used in the construction industry. In the UK, ENE is usually carried out on an entirely without prejudice basis, however the parties may agree that any or part of it may be referred to at trial or any subsequent hearing. The early neutral evaluation consists of a preliminary assessment of the issues in dispute for use as a basis for negotiations which may result in a settlement of the dispute. An independent person is appointed by the parties who reviews the case and provides an opinion, in written form and in some detail, with reasons on the merits of the matters in dispute. The opinion is non-binding but provides the parties with what in the opinion of the independent person a formal tribunal may decide whether a court or an arbitrator, if the dispute is not resolved. However, ENE has yet to take off in the construction industry in the UK. This paper will explain this procedure and explore the use of it in the UK and internationally, considering the benefits and drawbacks of its use. It will consider whether or not it is more effective than other early resolution forms such as mediation and adjudication. It will argue and conclude that it is a very useful cost effective procedure, particularly in the resolution of complex disputes, whether local or international.

  • PDF

Commissioning Model for CM Services Considering Project and owner Properties (프로젝트 및 발주자 특성을 고려한 CM업무 위탁모델)

  • Kang, Hyun-Koo;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.632-636
    • /
    • 2007
  • These days, Construction industries are getting bigger, more specialized and complicated. Accordingly, the items of management is increased, also owner's organization is reduced. For this reason, various a method of construction management is introduced in the domestic construction industry. But introduction of construction management have caused increase cost because role duplication of managers. This role duplication is caused by confusion of trial and error, irrationality of system. And every construction project have peculiar properties, also owner's organization of project have various properties. This various properties is not reflected in the construction management , and the regimental method of construction management applied. In order to solving these problems, this study suggested the commissioning model for CM service reflected the properties of project and owner. This study have to selection of the critical service, service item of construction management and definition of owner's role through analysis of the properties of project, owner's capacity and requirement.

  • PDF