• Title/Summary/Keyword: Trial construction

Search Result 266, Processing Time 0.028 seconds

The Development of Structure of Construction-Information Converged Technology Criteria on U -City by analyzing Domestic Construction Criteria (국내 건설공사기준 분석을 통한 U-City의 건설-IT융합 기술기준 구성 체계 개발)

  • Kim, Chang-Han;Han, Jae-Goo;Kim, Kyoon-Tai
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.137-141
    • /
    • 2009
  • Recently IT industry has its eyes on IT Converged Technology as its future growth engine. Now, local governments are busy with planning U-City Constructions to improve their competitiveness. While this shows the ripple effect of U-City Constructions, the related standards or laws don't still seem to be established. The existing Construction Criteria which comprehends only construction could not apply to U-City development. Therefore Construction-Information Converged Technology Criteria should be needed. And fundamental research of Criteria should be preceded. The objective of this research is to develop Structure of Construction-Information Converged Technology Criteria on U-City. The new comprehensive Criteria for Construction-Information Converged Technology would be fundamentally basic standard for U-city development. Thereafter local governments, the main body of the projects, could use Construction-Information Converged Technology Criteria so that there must be lest trial and error to Construction U-City Project.

  • PDF

Construction 3D printing SoP Design and Verification Using Material Extrusion Additive Manufacturing Technology (압출식 적층제조 기술을 적용한 건축 3D 프린팅 운영절차의 설계 및 검증)

  • Park, Jinsu;Kim, kyung taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.1
    • /
    • pp.106-112
    • /
    • 2022
  • Additive manufacturing (AM, also known as 3D printing) technology gets attention for various effects in the construction industry. It reveals abilities of process automation, high traceability of resource management, construction period precision improvement, and worker safety. However, unlike the existing construction technology, the development of AM construction process causes trial errors and unpredictable accidents. In the present study, the construction AM process is designed for on-site construction, and it performs with empirical tests. Also, we analyzed the causes of qualitative experimental results.

Application of Grouting of the Sea-Crossing Bridge Foundation in Busan-Geoje Fixed Link (부산~거제간 연결도로 해상교량기초 그라우팅 시공사례 연구)

  • Park, Chung-Whan;Jeong, Sang-Kyoon;Jeong, Gyeong-Hwan;Shin, Min-Sik;Park, Chan-Woo;Kwon, Jin-Wook
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2007.09a
    • /
    • pp.665-678
    • /
    • 2007
  • It was applied the grouting method to fill densely the space between the bottom of the caisson and the ground with the grout mixture mixed with anti-washout admixture after locating accurately the precast caisson on three concrete landing pads but it is far different from a costly conventional method, which place concrete to build the foundation of reinforcement concrete on the spot after excavating inside of the temporary coffering wall for the bridge foundation in the sea. To verify the grouting method in advance, the full-scale trial test was performed twice on the land. After confirming the fluidity of material for the injection and some possible problems during construction and then enhancing the original design, the main process is ongoing and it has been finished 12 spots until now. The purpose of this study is to introduces for the first time in Korea the grouting method including the automatic and the manual monitoring process applied to, based on the main process of the caisson foundation finished already in the site. In a similar construction it is sincerely expected to be referred to in the future.

  • PDF

Parametric Instability of Cylinderical Panels (주기적(週基的)인 압축하중을 받는 원통(円筒) Panel의 동적(動的) 불안정(不安定) 특성(特性)에 관한 연구)

  • Park, Sung Jin;Mikami, Takashi
    • Journal of Korean Society of Steel Construction
    • /
    • v.12 no.6
    • /
    • pp.737-748
    • /
    • 2000
  • This paper presents a numerical analysis procedure and a characteristics for dynamic of cylindrical panels. The panels with simply-simply or simply-clamped edge supports are subjectes to circumferential compressive or flexural stresses. The differential equations governing vibration and dynamic for these panels are derived by using the fundamental differential equation of the Love-Timoshenko and are solved numerically by the Galerkin method. The panel with simply-clamped edge supports is used a trigonometric function or an eigen function of a beam as a trial function and the effects of trial functions on numerical solutions are displayed. Numerical results are presented to demonstrate the effects of the flexural parameters in natural frequencies and coefficients of critical buckling, and some typical mode shapes of vibration and buckling are also presented.

  • PDF

An Estimation of Behavior for Wedge type Removable Soil Nailing System by Field Trial Construction (현장시험시공을 통한 쐐기형 제거식 쏘일네일링 공법의 거동 평가)

  • Han, Yeon-Jin;Park, Si-Sam;Kwon, Hyuk-Jun;Kim, Hong-Taek;Park, Ju-Seok
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.1360-1364
    • /
    • 2009
  • Necessity of removable soil nailing has been arisen in the soil nailing system because of problem such as civil petition for geotechnical environment and invasion of the ground boundary line and payments for use besides geotechnical engineering. Removable soil nailing system is improved soil nailing system that fixed socket arranged in boring hole for increasement of skin friction. In this study, field pull-out tests are carried out more 4 times considering installed distance of fixed socket and analyze skin friction behavior characteristics in fixed socket through analysis of measurements of strain gauge attached to fixed socket. Also, to evaluate application for wedge type removable soil nailing system analyzing displacement aspects through field pull-out tests by trial construction.

  • PDF

A Retrospection on Foundation Design of Taipei 101

  • Chin, Chung-Tien;Chao, Hsiao-Chou;Chang, Der-Wen
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.145-156
    • /
    • 2009
  • Large diameter bored pile was selected as the foundation type for Taipei 101. The pile construction method and specific construction procedures were determined based on the results of trial installation and pile load tests. The baseline for foundation design was established using the friction versus depth characteristics of each ground layer obtained from the pile load tests. As the ground profile and depth to the top of rock formation varied significantly on this site, the pile length, bearing capacity and settlement for single pile were analyzed using the information interpreted from adjacent boreholes. The post grouting at pile tip was mandatory for pile construction. Nevertheless, it was treated as a measure reducing the influence of construction uncertainties and providing extra safety for the foundation system.

  • PDF

An Analysis of Influences on Partial Work Rates under the Whole Work Rates on the Landscape Constructions in the Ulsan Grand Park (울산대공원 조경공사의 각 세부공정이 전체공정율에 미치는 영향분석)

  • 성백진;이재근;최종희
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.31 no.6
    • /
    • pp.64-72
    • /
    • 2004
  • This study analyses influences on partial work rates under whole work rates on landscape constructions in Ulsan Grand Park. The schedule management is one of the factors that are very important to the process management of landscape construction. The time process of the whole construction is supposed to be affected by several kinds of work that organize the whole construction. First, this study divides the construction of Ulsan Grand Park into 10 kinds of works: earth work, rain and sanitary sewage water work, water-supplying work, planting work, paving work, water proofing work, fountain work, instituting work and temporary work. Then the time-process curves of all kinds of work are statistically compared to that of the whole construction. The trial methods of statistics are lineal regression, non-lineal regression, and principal analysis. In the result of the non-lineal regression, the rain and sanitary sewage water work, the water-supplying work and the earth work strongly affected the whole construction. The principal analysis results show that the whole construction is affected strongly by the water-supplying work, the rain and sanitary sewage water work and the earth work. However the lineal regression is shown to be senseless because of its high collinearity.