• Title/Summary/Keyword: Trenchless

Search Result 34, Processing Time 0.022 seconds

Study of structural properties and development of high strength Cured-In-Place Pipe (CIPP) liner for sewer pipes using glass fiber (유리섬유를 이용한 하수관의 고강도 현장경화 비굴착 보수 공법 재료의 개발 및 물성 특성 연구)

  • Ji, Hyon Wook;Koo, Dan Daehyun;Yoo, Sung Soo;Kang, Jeong-Hee
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.34 no.2
    • /
    • pp.149-159
    • /
    • 2020
  • Cured-in-place-pipe(CIPP) is the most adopted trenchless application for sewer rehabilitation to extend the life of the existing sewer without compromising both direct construction and indirect social costs especially applied in the congested urban area. This technology is globally and domestically known to be the most suitable for partial and full deteriorated pipe structure rehabilitation in a sewer system. The typical design of CIPP requires a significant thickness of lining to support loading causing sewage flow interruption and increasing material cost. This paper presents development of a high strength glass fiber composite lining material for the CIPP application and structural test results. The test results exhibit that the new glass fiber composite lining material has 12 times of flexural strength, 6.2 times of flexural modulus, and 0.5 Creep Retention Factor. These test results can reduce lining design thickness 35% at minimum. Even though taking into consideration extra materials such as outer and inner films for actual field applications, the structural capacity of the composite material significantly increases and it reduces 20 percent or more line thickness as compared to the conventional CIPP. We expect that the newly developed CIPP lining material lowers material costs and minimizes flow capacity reduction, and fully replaceable to the conventional CIPP lining materials.

Development of pressurizing support tunneling method and case study of its field application (가압지보 터널공법 개발 및 현장적용 사례 분석)

  • Kim, Dea-Young;Lee, Hong-Sung;Lee, Se-Jin;Lee, Hee-Kwang;Sim, Bo-Kyoung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.14 no.4
    • /
    • pp.397-419
    • /
    • 2012
  • The pressurizing support tunneling method has been developed that overcomes shortcomings of conventional trenchless methods and applied to the field. The main concept of the new method is the pressurization system which, by means of pressurization bag between outer flange of steel ribs and excavated perimeter, applies higher pressure than the pressure relaxed by excavation to the ground to prevent ground displacement. The stability of the support members and effect of displacement control of the new method were verified through 3D numerical analyses. The new method was applied to the construction of a 10.7 m wide, 7.9 m high and 85 m long ramp tunnel that passes under ${\bigcirc}{\bigcirc}$ Expressway. By applying the new method, the tunnel construction was successfully completed in 13.5 months which decreases construction time to 35% compared to conventional methods, and ground displacement was almost negligible.

Comparison of earth pressure around pipe-roof between UPRS and front-jacking method (UPRS 공법과 프론트잭킹 공법의 파이프루프 주변 현장토압 계측결과 비교)

  • Sim, Youngjong;Jin, Kyu-Nam;Song, Ki-Il
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.5
    • /
    • pp.513-522
    • /
    • 2015
  • This study is to confirm the effect of pre-installed pipe-roof by measuring earth pressure acting on the underpass. In recently developed trenchless methods pre-inserted steel pipes before ground excavation to form pipe-roof are connected each other with re-bars and filled with mortar. In this study, focusing on the Upgraded Pipe Roof Structure method (UPRS) and Front-Jacking, earth pressure around pipe-roof is measured after insertion of steel pipe to ensure the effect of earth pressure reduction. In case of the UPRS earth pressure is considerably reduced because of the reinforced effect of pipe-roof. In case of the Front-Jacking in which the whole underpass structure is pushed into the ground, earth pressure is not reduced as expected, because the pre-installed pipes are not needed to be reinforced.

Experimental evaluation of electrical conductivity of carbon fiber reinforced fly-ash based geopolymer

  • Vaidya, Saiprasad;Allouche, Erez N.
    • Smart Structures and Systems
    • /
    • v.7 no.1
    • /
    • pp.27-40
    • /
    • 2011
  • Geopolymer concrete is finding a growing number of niche applications in the field of civil engineering due to its high compressive strength and strength gain rate, retainage of structural properties in elevated temperature environments, chemical stability in highly acidic conditions and environmental benefits. Combining the above mentioned characteristics with induced electrical conductivity, could enable geopolymer cement to serve as a smart and sustainable cementitious material suitable for health monitoring of civil structures. Carbon fibers were added to fresh geopolymer and OPC (ordinary Portland cement) mixes to enhance their electrical conductivities. AC-impedance spectroscopy analysis was performed on the specimens with fiber fraction ranging from 0.008 to 0.8 with respect to the weight of cementitious binder, to measure their electrical resistivity values and to determine the maximum beneficial fiber content required to attain electrical percolation. Experimental observations suggest that CFR-geopolymer cement exhibits superior performance to CFR-OPC in terms of conducting electrical current.

An Experimental Study on the Trenchless Construction Method For Small Diameter Cable Conduits (소구경 비개착 관로건설 기술연구)

  • Seo, Dong-Seob
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 2005.08a
    • /
    • pp.217-221
    • /
    • 2005
  • 도시의 기능이 날로 커져가고 땅속 지하매설물은 포화상태에 이르렀다. 또한 시민들의 의식 수준이 높아가면서 도시에서의 굴착시공은 민원유발과 교통소통장애 문제로 날로 어려워지고 있는 것이 현실이다. KT에서는 무인 및 유인 통신구를 건설할 수 있는 장비를 이미 개발한바 있으며, 본 연구를 통해 도심지에서 보다 효율적으로 통신관로 ${\Phi}50mm,\;{\Phi}150mm,\;{\Phi}300mm$를 시공할 수 있는 장비를 개발하게 되었다. 도시는 복잡하기 때문에 비개착 시공에 있어서 시공 점용면적이 상대적으로 많을 경우 어려움을 겪게된다. 소구경 비개착 장비인 XS-300은 길이 1.45m 폭 0.8m 높이 0.97m 이며 중량은 700kg인 소형장비인 것이 특징이다. XS-300은 도심지에서 통신맨홀 터파기 부분을 압입구로 활용할 수 있으며 경제적인 비용으로 개착식 시공이 불가한 구간에 대한 인입관로 구성과 지하장애물 하월시공, 도로횡단 시공 시에 적합한 장비이다. 특히 타 시설물을 관통한 불량통신시설과 재해에 취약한 통신시설에 대해 안전하고 경제적인 비용으로 이설시공을 할 수 있으며 통신인프라 기초시설 안정화 및 품질고도화에 기여할 수 있을 것이다.

  • PDF

Inspecting Stablity of DSM method with Grouting on Tunnel Face using Chamber Test and Numericlal Analysis (토조실험과 수치해석을 이용한 막장면 그라우팅 DSM공법의 안정성 검토)

  • Kim, Young-Uk;Park, Young-Bok;Kim, Li-Sak;Kim, Nak-Kyeong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.3
    • /
    • pp.677-683
    • /
    • 2016
  • In urban areas, underground tunnel construction sites have spread widely to accommodate rapidly increasing traffic volume along with a high-degree economic growth. Earth tunneling might be adapted frequently for the underground space securing, and various tunneling methods have been developed to stabilize the tunnel face and crown. Among them, the DSM (divided shield method) is gaining popularity for its enhanced stability and construction efficiency. This method has its foundation from the Messer Shield method, which is one of the trenchless special tunneling methods. This study examined the effects of face reinforcement on construction the sequence through a large scale soil chamber test and numerical analyses. The chamber has a size of a 1/2 scale of the real tunnel. Surface settlements were measured according the tunneling process. Commercially available software, MIDAS GTS, was used for numerical analysis and its result was compared with the values obtained from the chamber test. The results of the study show that both settlements of the embanked soils and the stress of the tunnel girder are located within the safe criteria. Overall, this study provides basic data and the potential of using a reinforced tunnel face to enhance DSM applications.

An experimental study on the ground movement around a square pipe by its penetration for trenchless construction in sandy ground (사각형 강관을 이용한 비개착 시공에 따른 지반거동의 분석: 모래지반에 대한 모형 토조실험)

  • Choi, Soon-Wook;Park, Young-Taek;Chang, Soo-Ho;Bae, Gyu-Jin;Lee, Ki Taek;Baek, Yong Ki
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.14 no.5
    • /
    • pp.485-501
    • /
    • 2012
  • This study aims to experimentally investigate ground settlement and ground movement around the square pipe by its penetration in sandy ground. A series of laboratory model tests were carried out with a small-scale auger equipment for penetration of a square pipe as well as a newly designed test box with a sand raining equipment. From the experiments, it is shown that a square pipe induces ground movement evenly around it in a low overburden condition. However, as the overburden becomes higher, ground movement by a square pipe is concentrated mainly above it. Especially, horizontal strain above the square pipe was mainly dominated by its penetration. In addition, sand surface movement is the smallest in case of the dimensionless penetration rate equal to 0.2. When its penetration rate of the square pipe is fixed, the rotation speed of auger controls surface movement whether it is settlement or heaving. Therefore, the selection of an optimal dimensionless rate for the square pipe is a key design factor to minimize ground settlement in a trenchless construction.

A combined sewer design method using tractive force considering wastewater flow on non-rainy days and its application for improvement methods of sewer (청천시 오수량을 고려한 합류식 하수도 소류력 설계법과 이를 활용한 하수관거 개보수방안)

  • Ji, Hyon Wook;Yoo, Sung Soo;Song, Homyeon;Kang, Jeong-Hee
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.34 no.3
    • /
    • pp.211-220
    • /
    • 2020
  • When domestic sewage and rainwater runoff are discharged into a single sewer pipe, it is called a "combined sewer system." The sewage design standards in Korea specify the flow velocity based only on the volume of rainfall; therefore, sedimentation occurs on non-rainy days owing to the reduced flow rate and velocity. This sedimentation reduces the discharge capacity, causes unpleasant odors, and exacerbates the problem of combined sewer overflow concentration. To address this problem, the amount of sewage on non-rainy days, not just the volume of rainfall, should also be considered. There are various theories on sedimentation in sewer movement. This study introduces a self-cleansing velocity based on tractive force theory. By applying a self-cleansing velocity equivalent to the critical shear stress of a sand particle, sedimentation can be reduced on non-rainy days. The amount of sewage changes according to the water use pattern of citizens. The design hourly maximum wastewater flow was considered as a representative value, and the velocity of this flow should be more than the self-cleansing velocity. This design method requires a steeper gradient than existing design criteria. Therefore, the existing sewer pipelines need to be improved and repaired accordingly. In this study, five types of improvement and repair methods that can maximize the use of existing pipelines and minimize the depth of excavation are proposed. The key technologies utilized are trenchless sewer rehabilitation and complex cross-section pipes. Trenchless sewer rehabilitation is a popular sewage repair method. However, it is complex because the cross-section pipes do not have a universal design and require continuous research and development. In an old metropolis with a combined sewer system, it is difficult to carry out excavation work; hence, the methods presented in this study may be useful in the future.

Analysis on the characteristics of the earth pressure distribution induced by the integrated steel pipe-roof construction (일체형 강관 파이프루프 시공에 따른 주변 지반의 토압 분포 특성 분석)

  • Sim, Youngjong;Jin, Kyu-Nam;Song, Ki-Il
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.5
    • /
    • pp.455-468
    • /
    • 2013
  • In recent, various types of steel pipe-roof methods, which is reinforced by mortar after propulsion of steel pipe into the ground, have been used for the construction of trenchless underpass. Integrated steel pipe-roof has flexural stiffness and can resist against overburden load and reduce the stress acting on the concrete underpass structures. Due to arching effect, vertical and horizontal stress distribution around the steel pipe-roof is changing. In this study, therefore, the characteristic of stress distribution around the underpass induced by the construction of integrated steel pipe-roof is investigated by using numerical method. To examine the soil-structure interaction, interface element is introduced. Results show that vertical stress acting on the concrete structure placing inside the steel pipe-roof is significantly reduced due to arching effect and flexural stiffness of integrated steel pipe-roof. Design load can be reduced and effective design of underpass will be available if the earth pressure reduction due to arching effect is considered in the design stage.

Numerical Approach to Investigate the Effect of Mud Pressure on the Borehole Stability during Horizontal Directional Drilling (수평굴착 시 점토압력이 굴착공의 안정에 미치는 영향에 관한 수치해석적 연구)

  • Kang, Jae Mo;Lee, Janggeun;Bae, Kyu-Jin;Moon, Changyeul;Ban, Hoki
    • Journal of the Korean Geotechnical Society
    • /
    • v.31 no.12
    • /
    • pp.71-76
    • /
    • 2015
  • Recently, people are increasingly interested in horizontal directional drilling (HDD) to construct oil and gas pipeline and utility pipeline in the urban area as one of trenchless methods. One of major issues during the HDD is the collapse of borehole, which may be the potential causes of ground collapse. This study investigated the effect of mud pressure on the borehole stability, using finite element analysis. Since the borehole is being drilled with a certain angle, three dimensional analysis should be performed. The borehole stability was examined by applying two different types of mud pressures, i.e., uniform and non-uniform, to the exterior surface of borehole. The results show that the high mud pressure at the beginning of drilling, i.e., at shallow depth, causes the borehole collapse, whereas the borehole was stable even at high mud pressure as the drilling depth increases. It can be said that the determination of maximum mud pressure is strongly related to the drilling depth.