Browse > Article
http://dx.doi.org/10.5762/KAIS.2016.17.3.677

Inspecting Stablity of DSM method with Grouting on Tunnel Face using Chamber Test and Numericlal Analysis  

Kim, Young-Uk (Department of Civil and Environmental Engineering, Myongji University)
Park, Young-Bok (Department of Civil and Environmental Engineering, Myongji University)
Kim, Li-Sak (Department of Civil and Environmental Engineering, Myongji University)
Kim, Nak-Kyeong (Division of Architecture and Civil Engineering, Sungkyunkwan University)
Publication Information
Journal of the Korea Academia-Industrial cooperation Society / v.17, no.3, 2016 , pp. 677-683 More about this Journal
Abstract
In urban areas, underground tunnel construction sites have spread widely to accommodate rapidly increasing traffic volume along with a high-degree economic growth. Earth tunneling might be adapted frequently for the underground space securing, and various tunneling methods have been developed to stabilize the tunnel face and crown. Among them, the DSM (divided shield method) is gaining popularity for its enhanced stability and construction efficiency. This method has its foundation from the Messer Shield method, which is one of the trenchless special tunneling methods. This study examined the effects of face reinforcement on construction the sequence through a large scale soil chamber test and numerical analyses. The chamber has a size of a 1/2 scale of the real tunnel. Surface settlements were measured according the tunneling process. Commercially available software, MIDAS GTS, was used for numerical analysis and its result was compared with the values obtained from the chamber test. The results of the study show that both settlements of the embanked soils and the stress of the tunnel girder are located within the safe criteria. Overall, this study provides basic data and the potential of using a reinforced tunnel face to enhance DSM applications.
Keywords
Chamber test; DSM; MIDAS GTS; Numerical analysis; Trenchless tunneling;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 Shin, H. J., Shin, K. C. "A Case Study of the Underground Passage Ways Construction in Downtown," Architectural Institute of Korea Fall Conference, Daegu, Korea, Vol. 31, No2, pp. 261-262, 2011
2 Kim, M. I., Lee, S. W. "A Study on a Method of Improvement from Domestic NATM Case," Journal of KIIS Vol. 9, No. 4, pp. 92-102, 1994
3 Kim, J. W., "A Study on the Field Application of DSM(Divided Shield Method) and Numerical Analysis" Master's thesis in Civil and Environmental Engineering Graduate School of Hanyang University, 2005
4 Kim, H. N., "A study on the Analysis for Major Factors in Selection Process of Non-Open Cut Construction Method" Master's thesis in Civil Engineering Graduate School Gyeongsang National University, 2013
5 Yoo, C. (2002): Finite-element analysis of tunnel face reinforced by longitudinal pipes, Computers and Geotechnics 29, Vol. 29, No. 1, pp. 73-94, 2002   DOI
6 Hong, Y. H., Yu, J. D., Byun, Y. H., You, B. C., Lee, J. S., "Integrity evaluation of grouting in umbrella arch methods by using guided ultrasonic waves" Journal of Korean Tunnelling and Underground Space Association, Vol. 15 No. 3, pp. 187-199, 2013 DOI: http://dx.doi.org/10.9711/KTAJ.2013.15.3.187   DOI
7 Choi, K. H., "Ground movement due to messer shield excavation in urban tunnel" Master's thesis in Civil Engineering Graduate School Korea University, 2013
8 Park, D. K., "Study in the Method of MESSER SHIELD" Master's thesis in Civil Engineering Graduate School Donga University, 2000