Application of Software Quality Model and Metric for Software Product Assurance for KASS Control Station (KASS 통합운영국 소프트웨어 품질 보증을 위한 소프트웨어 품질 모델 및 메트릭 적용방안)

  • Kim, Youn-sil;Lee, Eun-sung
    • Journal of Advanced Navigation Technology
    • /
    • v.24 no.1
    • /
    • pp.28-36
    • /
    • 2020
  • Korea augmentation satellite system (KASS) is the Korean satellite based augmentation system (SBAS) developed by ministry of land, infrastructure, and transport (MOLIT) since 2014. Since KASS is the safety critical system that can affect to the safety of airplane, the software of KASS is developed according to the DO178B software level induced from safety analysis. In case of KASS control station (KCS), most of the software of KCS get assigned software level E in DO178B. In that case, ECSS-Q-ST-80C category D is assigned as a software product assurance standard. In this paper, the software related standard ECSS-E-ST-40C, ECSS-Q-HB-80-04A are analyzed to satisfy ECSS-Q-ST-80C and as a result the software product assurance activities regarding software life cycle and the software quality model, metric is proposed for the product assurance of the KCS software.

Analysis of Unit-works for Design for Safety in Construction Work : Focus on Construction Projects of OO Corporation (설계의 안전성 검토를 위한 건설공사의단위작업 분석: OO공사의 발주공사를 중심으로)

  • Kim, Jin-Won;Cho, Gun-Hee;Song, Sang-Hoon;Bang, Jong-Dae;Sohn, Jeong-Rak
    • Land and Housing Review
    • /
    • v.7 no.4
    • /
    • pp.315-322
    • /
    • 2016
  • Recently, Ministry of Land, Infrastructure and Transport has amended the law to Design for Safety in working design stage of construction work. There should be informed the disaster likelihood and severity of unit-works to decide risk of unit-works in Design for Safety. Therefore, the construction disaster data of ${\bigcirc}{\bigcirc}$ corporation were classified as 24 unit-works and the disaster likelihood and severity of unit works were analyzed in this study. The safety management level of unit-works which based on analysis data was suggested 3 groups; special management and emphasis management, regular management. The results of this study can be used as basic information to perform Design for Safety in construction. And this information will be able to reduce the disaster.

Comparison of Meteorological Drought and Hydrological Drought Index (기상학적 가뭄지수와 수문학적 가뭄지수의 비교)

  • Lee, Bo-Ram;Sung, Jang Hyun;Chung, Eun-Sung
    • Journal of Korea Water Resources Association
    • /
    • v.48 no.1
    • /
    • pp.69-78
    • /
    • 2015
  • In this study, meteorological drought indices were examined to simulate hydrological drought. SPI (Standardized Precipitation Index) and SPEI (Standardized Precipitation Evapotranspiration Index) was applied to represent meteorological drought. Further, in order to evaluate the hydrological drought, monthly total inflow and SDI (Streamflow Drought Index) was computed. Finally, the correlation between meteorological and hydrological drought indices were analyzed. As a results, in monthly correlation comparison, the correlation between meteorological drought index and monthly total inflow was highest with 0.67 in duration of 270-day. In addition, a meteorological drought index were correlated 0.72 to 0.87 with SDI. In compared to the annual extremes, the relationship between meteorological drought index and minimum monthly inflow was hardly confirmed. But SDI and SPEI showed a slightly higher correlation. There are limitation that analyze extreme hydrological drought using meteorological drought index. For the evaluation of the hydrological drought, drought index which included inflow directly is required.

A Study on the Analysis of Japan's Basic Ocean Law and Policy of Korea -The Case of Korea, Japan and China on the Administrative System for Ocean- (일본의 해양기본법 제정과 우리의 대응방안 연구 -한중일 해양행정체계 비교를 중심으로-)

  • Park, Seong-Wook;Yang, Hee-Cheol
    • Ocean and Polar Research
    • /
    • v.30 no.1
    • /
    • pp.119-128
    • /
    • 2008
  • Japan's new Basic Ocean Law took effect in 20 July 2007. This law contains that 1) calls for the consolidation of eight government offices that previously worked separately on maritime issues; 2) establishes a basic plan for maritime matters, and; 3) creates a comprehensive maritime policy headquarters, run by the Prime Minister. The result is a structure for the integrated promotion of maritime policy. The Minister of Land, Infrastructure and Transport has been appointed to the newly established position of maritime minister. Japan has been in conflict with Korea and China over EEZ and territory, which has caused the country to turn to ocean. If Japan puts more emphasis on sea, it will be on a collision course with neighboring countries such as Korea, China, Russia, and Taiwan. Japan has been at odds with these countries; with Korea over Dokdo islets, with China over the Senkaku Islands and the East China Sea, where gas fields lie, with Taiwan over fishery rights in the East China Sea, with Russia over the Kuril Islands. Korea's position about the establishment of Japan's new Basic Ocean Law is followed: 1) expression of Korea's position in maritime resourcces of east china sea, 2) understand of strategy for maritime resources development and maritime delimitation in China and Japan, 3) a caution for extention of EEZ and maritime activities, 4)effective and comprehensive policy establishment, and strength in R&D, 5) construction of active and responsive system for maritime issues in neighbor country.

Effects of Alkali-Activated Soil Stabilizer Binder Based on Recycling BP By-Products on Soil Improvement (BP부산물을 재활용한 알칼리활성화 지반개량재의 지반개량효과에 관한 연구)

  • Lee, Yeong-Won;Kang, Suk-Pyo;Kim, Jae-Hwan
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.2 no.2
    • /
    • pp.158-165
    • /
    • 2014
  • The enormous quantity of 'Bayer-Process by-products' (BP by-products) discharged by industries producing alumina from bauxite represents an environmental and economical problem. As it is mainly composed of $Fe_2O_3$, $Al_2O_3$, $SiO_2$, CaO and $Na_2O$, it is thought that using BP by-products as a construction material is an effective way to consume such a large quantity of alkaline waste. In this study, This study evaluates the effect of alkali-activated binder based on recycling BP by-products on soil improvement through the evaluation of slope stability and seepage flow numerical analysis. The results of analysis of ground slope safety at dry season and wet season meet standard (Ministry of Land, Infrastructure and Transport, 2006) Especially, when wet season, the ground used soil improving material meet standard, while the ground used soil-nailing method doesn't. Also, permeability coefficient of improved soil is smaller than that of natural soil and saturation depth of reinforced ground surface with improve soil is lower than that of natural soil.

A Factor Analysis of Urban Railway Casualty Accidents and Establishment of Preventive Response Systems (도시철도 철도안전사상사고 원인분석 및 예방대응체계구축)

  • Kim, Si Gon;Park, Il Ha;Oh, Jae Kyung;Kim, Yeon Kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.3
    • /
    • pp.1017-1022
    • /
    • 2014
  • Since the opening of Seoul Subway Line #1 in 1974, the number of passengers has been increasing. The possibility for passenger's accidents in railway stations has also increased. In order to decrease these kind of accidents, railway operation systems have been automated. Nevertheless, the possibility of a casualty accident in railway stations remains. This study analyzed the type of casualty accidents, casualty accidents by age, sex, pedestrian facility, and passenger type based on the internal data of Seoul Metro. The causes of casualty accidents are also found out. Finally, the establishment of railway safety education program and railway safety experience center are suggested in order to prevent the urban railway casualty accident in advance at railway stations.

Influence of Delay Time and Priming Location on the Blast-Induced Ground Vibration (발파공 사이의 지연시차와 기폭위치가 지반진동에 미치는 영향)

  • Kang, Choo Won;Ryu, Bok Hyun;Choi, Tae Hong
    • Tunnel and Underground Space
    • /
    • v.24 no.1
    • /
    • pp.97-109
    • /
    • 2014
  • In order to identify the characteristics of the propagation depending on delay time (20, 25 ms) and priming location (top priming, middle priming, bottom priming), test blasts were carried out a total of 4 times using different spacing, burden, drilling length, charge per delay and was derived the formula to predict blast vibration. This study investigated the characteristics of vibration by analysis of the nomogram and prediction of Peak Particle Velocity (PPV) from delay time and priming location by the formula to predict ground vibration. And it analyzed the trends of vibration increase by standards charge 0.5, 1.6, 5, 15 kg. Standards charge is "Blasting design and construction guidelines to road construction" by the Ministry of Land, Infrastructure and Transport. Depending on the charge in favor of vibration control method is proposed. Thus, when the design was to be used as a variable.

Suggestion of the Post-Environmental Evaluation of Road-side Cut Slope after Revegetation Works (도로비탈면 녹화공사의 사후환경평가 항목 제언)

  • Kim, Tae-Kook;Kim, Nam-Choon;Kim, Eun-Bum;Koo, Min-Kyu
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.21 no.4
    • /
    • pp.75-86
    • /
    • 2018
  • This research was thereby made to study and analysis ecological, landscape, and stability qualities of roadside cut Slopes in expressways and national highways that went through revegetation works. Also, evaluation items and framework for integrated assessment of plant structure and restored state for the maintenance were suggested. Following is the summary of the result. firstly, for stabilization of introduced native plant species on roadside cut slops, assessment on the post-project environmental management through long-term monitoring and maintenance works must be made. It signifies a form of authentic recovery and restoration by the native plants. second, current evaluation framework on the test beds is well managed with clear evaluation standards and table while its method of assessing the post management with only test bed results lacks conformity with this study site. Newly developed evaluation framework on the post construction sites is estimated to be used as assessment standards on any roadside construction sites. Third, after site investigation distinction was observed among different revegetating construction types in the long-term perspective. Due to the different duration time of vegetation state between seed-spray measures(degraded in time) and layer-spray measure(maintained), the use of coarse straw-mat mulching work or Coir net was suggested in long term maintenance of cut slopes. forth, segmentation of post environmental assessment is organized into three large categories of "ecological", "stabile", and "landscape" qualities regarding post restoration quality and stability of slope through native plants with which categories marks 50, 30, 20 points of rates. fifth, components of the post environmental assessment were segmented in twelve categories driving results from former experimental construction and newly focused items on site. In the future, it is possible to propose a customized assessment method considering the location and location of construction work if the research on the application of post-environment assessment methods for road construction surface recording is conducted systematically.

Wireless Mesh Network based on Routing Algorithm for guaranteing QoS between End-to-End in VANET (차량 통신 네트워크에서 End-to-End간의 QoS 보장을 위한 무선 메쉬 네트워크 기반의 라우팅 알고리즘)

  • Ryu, Min-Woo;Yoon, Jae-Seok;Lee, Sang-Shin;Won, Kwang-Ho;Cho, Kuk-Hyun
    • Proceedings of the KAIS Fall Conference
    • /
    • 2011.05a
    • /
    • pp.428-432
    • /
    • 2011
  • 차량 통신 네트워크(VANET, Vehicle Ad hoc NETwork)는 ITS(Intelligent Transport System)의 발전과 함께 운전자의 안전 및 교통 정보, 긴급 메시지 등과 같은 서비스를 실시간으로 가능하게 할 수 있는 차세대 네트워크 기술이다. 이러한 차량 통신 네트워크는 현재 IEEE P1609에서 정의하고 있으며, WAVE(Wireless Access Vehicular Environment)로 알려져 있다. WAVE는 차량에 설치된 OBU(Onboard Unit)와 주변시설에 설치된 RSU(Road Side Unit)을 통하여 통신하며, 차량 간 통신을 지원하는 V2V(Vehicle to Vehicle)와 차량과 주변시설과의 통신을 지원하는 V2I(Vehicle to Infrastructure)로 나뉘어져 있다. 하지만 WAVE에서 정의하고 있는 네트워크 서비스(IEEE P1609.4)는 OBU와 RSU 간의 네트워크 서비스에 초점을 맞추고 있기 때문에 전체 네트워크의 QoS를 보장하기에는 미흡한 상태이다. 따라서 본 논문에서는 차량 통신 네트워크에서 End-to-End 간의 QoS 보장을 위한 무선 메쉬 네트워크 기반의 라우팅 알고리즘을 제안한다. 제안하는 알고리즘은 무선 메쉬 네트워크 노드의 호스트 라우터 기능을 통하여 차량 노드와 이기종 간의 네트워크 서비스를 가능하게 하며, 무선 메쉬 네트워크의 다중 채널을 이용하여 데이터의 중요도에 따른 차등 서비스를 지원한다. ns-2를 이용한 시뮬레이션 결과 제안하는 알고리즘이 QoS를 보장함으로써 차량 통신 네트워크의 성능을 향상시킬 수 있음을 입증하였다.

  • PDF

Research on the Application of GIS-based Measures in the Advancement of the Construction Project Information System (건설사업정보시스템의 고도화를 위한 공간정보(GIS) 적용방안에 관한 연구)

  • Ok, Hyun;Kim, Seong-Jin
    • Smart Media Journal
    • /
    • v.4 no.4
    • /
    • pp.70-79
    • /
    • 2015
  • The Construction Project Information System(CPIS), an information system constructed as part of the Construction Continuous Acquisition & Life-cycle Support(CALS) of the Ministry of Land, Infrastructure, and Transport(MOLIT), is designed to digitize construction projects across all stages, and enable sharing of information so as to enhance the productivity and efficiency of construction projects and secure their transparent administration. One of MOLIT's internal work systems, CPIS focuses on work-handling and data management. However, now over 10 years old after its construction, it focuses on text and document-based construction project information, but it cannot be interfaced with the visualization-based GIS, which limits the sharing and dissemination of information and the determination of the overall construction project status. To resolve the existing CPIS limitations and problems and to upgrade the system, this study examined domestic and overseas GIS technology trends and relevant information systems, and analyzed the CPIS status and problems. It thus proposed total GIS application measures to upgrade CPIS. Also, it identified detailed CPIS utilization measures and GIS application measures by unit system, and analyzed considerations for GIS application.