Choi, Jong-Un;Yoon, Young-Chul;Sung, Gyu-Je;Kim, Young
Journal of Advanced Navigation Technology
/
v.23
no.4
/
pp.309-315
/
2019
This paper proposes an implementation of unequal power divider with 1:3 and 1:4 splitting ratio in multi-section structure using CPW and offset coupled transmission line. The power divider consists of a multi-section transmission line and a circuit with parallel capacitors and resistors. A multi-section transmission line was implemented by decomposing a ${\lambda}/4$ single transmission line terminated by an arbitrary impedance and converging it with a multi-section transmission line shorter than $90^{\circ}$ electrical length, and RC parallel circuits were connected between transmission lines to obtain reflection coefficient of output port and isolation characteristics between the output port. In this way, it was confirmed that the transmission lines at the unequal power divider designed at 2 GHz were shorter than ${\lambda}/4$ and implemented at least 27% less than the conventional ones, and that the broadband characteristics could be obtained.
Railway takes an important role of transporting massive passenger and freight. Accidents which occur related to trains have a risk of serious loss of lives, so those accidents need to be controlled urgently Therefore moving picture transmission system is required which transmits exact information of moving picture of accident status to CTC and also communication line is also required with it. By using WTB line as a wayside transmission line, railway telephones, fax and train service information are provided to local offices. As transmission line improving project, optical cabling work is being processed by phases. Therefore optical fiber line is more effective way for a communicating way between stations than coaxial transmission line. This Paper considers connecting method when optical fibers is used for moving picture data transmission of train accidents and its problems.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.25
no.7
/
pp.72-77
/
2011
Dynamic Line Rating (DLR) techniques have been greatly worthy of notice for efficiently increasing transmission capacity as well as controlling load-flow in overhead transmission lines, in comparison with the existing power system operating with Static Line Rating (SLR). This paper describes an utilization method to implement DLR control system for old transmission lines built in the first stage using the ground clearance design standard with lower dips. The suggested DLR system is focused on designing as temperature control system rather than current/load control system. Based on several performance for conductor temperatures, it is shown that DLR system with efficiency can be implemented.
The Journal of Korean Institute of Communications and Information Sciences
/
v.28
no.4A
/
pp.232-237
/
2003
We present the derivation of the loci of the reflection coefficient of a loaded transmission line on the Smith chart as the length of the transmission line is varied. The results show that the loci constitute a circle when the characteristic impedance of the transmission line differs from the normalizing one, whose center and radius are determined by the impedances of the load and the transmission line. The results can be used in the matching circuit design using microstriplines when line width and length should be compromised.
The parameters of transmission lines have an influence on the electromagnetic environment surrounding the line. This paper proposes a method based on phasor measurement unit (PMU) and supervisory control and data acquisition (SCADA) to achieve online estimation of transmission line full parameters, such as resistance, reactance and susceptance. The proposed full parameter estimation method is compared with the traditional method of estimating resistance independently based on SCADA system. Then, the electromagnetic environment is analyzed based on the different parameter estimation methods. The example results illustrate that online estimation of transmission line full parameters is more accurate in the analysis of electromagnetic environment, which further confirms its necessity and significance in engineering application.
Live line work is well known for mending and maintenance of electrical power equipment. Nowadays needs of electric power supply quality require live line work In Korea, live line work is needed since 765kV transmission operation and restructure of electric power industry has changed. In other words, in case of suspension of power supply on the transmission is getting hard to keep up with efficiency of transmission operation, customer's confidence and generation-limited cost. Therefore live line work is very meaningful. As the condition of 765kV Transmission both bare hand and Helicopter live line technique must be used in moderation because of economic, geographical, environmental circumstances around steel tower.
Ja-hyun, Baek;Hyeonjin, Kim;Soonho, Choi;Sangho, Park
KEPCO Journal on Electric Power and Energy
/
v.8
no.2
/
pp.55-59
/
2022
This paper introduce Renewable Energy forecasting technology, which is a part of renewable management system. Then, calculation method of dedicated transmission line's meteorological data to forecast renewable energy is suggested. As the case of dedicated transmission line, there is only power output data combined the number of renewable plants' output that acquired from circuit breakers. So it is need to calculate meteorological data for dedicated transmission line that matched combined power output data. this paper suggests two calculation method. First method is select the plant has the largest capacity, and use it's meteorological data as line meteorological data. Second method is average with weight that given according to plants' capacity. In case study, suggested methods are applied to real data. Then use calculated data to Renewable forecasting and analyze the forecasting results.
This paper deals with the implementation of forced reclosing the transmission line. Because the ground circuit breaker method decrease the secondary arc current sufficiently, the reclosing time can be reduced. As the secondary arc current is large and its residual time is long in UHV transmission line, this method is more effective in that system. The resistance of ground circuit breaker which minimize the secondary arc current is determined according to the system voltage and the length of transmission line.
The Transactions of the Korean Institute of Electrical Engineers
/
v.45
no.4
/
pp.612-615
/
1996
Audible noise from corona discharge had been identified as one of the most important factors in the design of conductor configurations for high-voltage transmission lines. 500kV and above. Therefore this paper describes audible noise characteristics of 6 X 480mm conductor bundle in KEPRI 765kV Test Line and Corona Cage. Prediction formula for audible(corona) noise on a 765kV transmission Line was developed using this results.
The Transactions of The Korean Institute of Electrical Engineers
/
v.67
no.4
/
pp.554-560
/
2018
Since Korea has a small land area, it is expected to construct the conductor return type with neutral wire in the case of ${\pm}500kV$ HVDC double bipole transmission line. Therefore, in order to apply ${\pm}500kV$ HVDC double bipole transmission line with neutral wire in Korea, it is necessary to develop technology for insulation and environmental designs. In this study, radio interference, audible noise, electric field and ion current density according to the polarity arrangement were compared and assessed in the ${\pm}500kV$ HVDC double bipole transmission line with the conductor return method. And the optimum configuration of HVDC double bipole transmission line was determined from the viewpoint of electrical environment.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.