• Title/Summary/Keyword: Transmission costs

Search Result 235, Processing Time 0.025 seconds

Transmission-Line Wiring Midair Protection Net & Installation Methods (송전선로 가선용 공중설치형 방호네트 및 설치공법)

  • Hwang, Chi-Young;Back, Byoung-Chul;Seo, Min-Geun;Kim, Young-Hwa;Won, Jea-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.8
    • /
    • pp.1479-1484
    • /
    • 2011
  • The existing leg-rest for transmission line construction was established on the ground as a structure. As a result of that, it caused some problems such as, a tremendous forest damage, excessive construction costs and the long time of construction period. In order to solve these problems, we suggest the protective net for an air installation. It is a new method of construction which has a dielectric strength with a light-weight and high-strength. And it's not influenced by a geographical feature. This excellent method doesn't affect a forest and can reduce tremendously the construction cost and period.

Development of the 3D parametric modeling system for transmission gears of tractor (트랙터 변속장치 기어의 3차원 파라매트릭 설계 및 분석)

  • 유우식;김성균
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.23 no.57
    • /
    • pp.87-92
    • /
    • 2000
  • This paper describes a three dimensional parametric modeling system for transmission gears of tractor. In conventional design and manufacturing, information about three dimensional shapes has been described in engineering drawings. However drawing based design presents several problems; 1) communication errors between the designer and the modeller or manufacturer. 2) time taken and costs incurred in the design process. To solve these problems the system of parametric design based modeling has been proposed. Developed system in this paper consists of four steps; 1) parametric design of transmission gears with a solid modeler. 2) evaluation of gear geometry and strength. 3) dynamic simulation for gear interference check. 4) gear stress analysis with a CAE software. The proposed system has been tested in the fields and found to be a useful system.

  • PDF

Transmission Network Expansion Planning Using Reliability and Economic Assessment

  • Kim, Wook-Won;Son, Hyun-Il;Kim, Jin-O
    • Journal of Electrical Engineering and Technology
    • /
    • v.10 no.3
    • /
    • pp.895-904
    • /
    • 2015
  • This paper presents a probabilistic approach of reliability evaluation and economic assessment for solving transmission network expansion planning problems. Three methods are proposed for TNEP, which are reorganizing the existing power system focused on the buses of interest, selecting candidates using modified system operating state method with healthy, marginal and at-risk states, and finally choosing the optimal alternative using cost-optimization method. TNEP candidates can be selected based on the state reliability such as sufficient and insufficient indices, as proposed in this paper. The process of economic assessment involves the costs of construction, maintenance and operation, congestion, and outage. The case studies are carried out with modified IEEE-24 bus system and Jeju island power system expansion plan in Korea, to verify the proposed methodology.

Congestion and Loss Cost for the Market Participants (시장참여자별 혼잡 및 손실 비용 산정)

  • Son, Hyun-Il;Bae, In-Su;Kim, Jin-O
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.11
    • /
    • pp.2021-2027
    • /
    • 2011
  • Recently the power system consists of the more complicated structure, due to increase of power demands. In this circumstance, the congestion and loss capacity in transmission line is also increased. Accordingly, the investment planning of transmission system is required to reduce the congestion and loss of the transmission line. This paper proposes a method to compute the congestion and loss costs which are the key elements in economic assessment of the power system planning. And the benefit of market participants in CBP (Cost Based Pool) is computed. To demonstrate the efficient of the suggested methods, these methods are applied to peak load system of 2016 in the 4th Basic plan of Long-Them Electricity Supply and Demand.

Optimal Siting of UPFC for Reducing Congestion Cost by using Shadow Prices

  • Lee, Kwang-Ho;Moon, Jun-Mo
    • KIEE International Transactions on Power Engineering
    • /
    • v.11A no.4
    • /
    • pp.21-26
    • /
    • 2001
  • As competition is introduced in the electricity supply industry, congestion becomes a more important issue. Congestion in a transmission network occurs due to an operating condition that causes limit violations on the transmission capacities. Congestion leads to inefficient use of the system, or causes additional costs (Congestion cost). One way to reduce this inefficiency or congestion cost is to control the transmission flow through the installation of UPFC (Unified Power Flow Controller). This paper also deals with an optimal siting of the UPFC for reducing congestion cost by using shadow prices. A performance index for an optimal siting is defined as a combination of line flow sensitivities and shadow prices. The proposed algorithm is applied to the sample system with a condition, which is concerning the quadratic cost functions. Test results show that the siting of the UPFC is optimal to minimize the congestion cost by the proposed algorithm.

  • PDF

Design and Implementation the USB Multi-signal Transmission System (USB 다중 신호 전송 시스템 설계 및 구현)

  • Chae, Jung-Sik;Kim, Jong-Moon;Kim, Chang-Su;Jung, Hoe-Kyung
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2013.05a
    • /
    • pp.623-625
    • /
    • 2013
  • This signal can be distributed using a single USB cable, computer, video, audio, USB, LAN, one USB multi-signal transmission system was designed and implemented. USB multi-signal transmission was implemented in order to convert a single DVI, audio, and multiple USB, LAN, USB signal converter modules. This USB DVI port supports up to 1920 * 1090 resolution. USB multi-signal transmission system by sending multiple signals into a single cable installation costs of the various cable and using the replication feature of the screen, will provide schools and institutes, etc., providing the convenience of the river, and the scalability of computer peripheral ports.

  • PDF

A Study on the Importer Security Filing and Additional Carrier Requirements(10+2 rule) in U.S. (미국 관세청의 선적전 추가 보안관련 정보 제출법안(10+2 Rule)에 관한 연구)

  • Song, Seon-Uk
    • International Commerce and Information Review
    • /
    • v.10 no.4
    • /
    • pp.395-416
    • /
    • 2008
  • The advance information for oceangoing cargoes destined to th United States enable CBP to evaluate the potential risk of smuggling WMD and to facilitate the prompt release of legitimate cargo following its arrival in the Unites States. On January 1, 2008, CBP promulgate regulations, also known as 10+2 rule, to require the electronic transmission of additional data elements for improved high-risk targeting, including appropriate security elements of entry data for cargo destined to the United States by vessel prior to loading of such cargo on vessels at foreign seaports. The potential impact to an importer's international supply chain will be as follows ; Firstly, importers will take incremental supply chain costs and filing costs. Secondly, anticipate delay in shipment of containerized cargo. Thirdly, importers could be charged fines if they fail to file and file inaccurate or missing data. Companies exporting to the United States should be interested in 10+2 rule, analyze their current processes and procedures to ensure that they are prepared to handle the additional filing requirements of 10+2 rule. And they should focus on how 10+2 impacts their supply chain in terms of costs and sourcing. They will be necessary to revise service legal agreements with their forwarders, customs brokers or carriers in order to meet filing requirements of 10+2 rule.

  • PDF

Adaptive Application Component Mapping for Parallel Computation Offloading in Variable Environments

  • Fan, Wenhao;Liu, Yuan'an;Tang, Bihua
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.9 no.11
    • /
    • pp.4347-4366
    • /
    • 2015
  • Distinguished with traditional strategies which offload an application's computation to a single server, parallel computation offloading can promote the performance by simultaneously delivering the computation to multiple computing resources around the mobile terminal. However, due to the variability of communication and computation environments, static application component multi-partitioning algorithms are difficult to maintain the optimality of their solutions in time-varying scenarios, whereas, over-frequent algorithm executions triggered by changes of environments may bring excessive algorithm costs. To this end, an adaptive application component mapping algorithm for parallel computation offloading in variable environments is proposed in this paper, which aims at minimizing computation costs and inter-resource communication costs. It can provide the terminal a suitable solution for the current environment with a low incremental algorithm cost. We represent the application component multi-partitioning problem as a graph mapping model, then convert it into a pathfinding problem. A genetic algorithm enhanced by an elite-based immigrants mechanism is designed to obtain the solution adaptively, which can dynamically adjust the precision of the solution and boost the searching speed as transmission and processing speeds change. Simulation results demonstrate that our algorithm can promote the performance efficiently, and it is superior to the traditional approaches under variable environments to a large extent.

A Study on the Assessment and Application of Outage Cost for Power System Expansion Planning (계통계획 수위용 공급지장비의 추정방법 및 이의 응용에 관한 연구)

  • 최재석;강성록;트룬틴트란;김호용;김슬기
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.53 no.5
    • /
    • pp.285-295
    • /
    • 2004
  • The outage cost assessment has an important position for determination of the optimal level or optimal range of reliability for power system expansion planning. Establishing the worth of service reliability is a very difficult and subjective task. While the utility cost(reliability cost) will generally increase as consumers are provided with higher reliability, the consumer costs(reliability worth) associated with supply interruptions will decrease as the reliability increases. The total costs to society are the sum of these two individual costs and the optimum or target level of reliability is achieved at minimum point of the total cost curve. This paper addresses the role, need and assessment algorithms and methodologies of the outage cost in power system expansion planning. In a case study, the outage cost has been assessed using macro approach for our country 15years(1986-200l) in the case study. Additionally, determination processing of optimum reliability level is presented in another case study with the five buses MRBTS.

Development of a Micro-Bubble System for Ozone Off-Gas Recycling in the Ozone Treatment Process (오존처리공정의 배오존 재활용 마이크로버블시스템 개발)

  • Young-Man, Cho;Jae-Ouk, Jung;Kwang-Heon, Lee;Yong-Jun, Jung
    • Journal of Environmental Science International
    • /
    • v.31 no.12
    • /
    • pp.1061-1068
    • /
    • 2022
  • The purpose of this study was to develop a recycling system for ozone off-gas. Although the ozone transmission rate of the injector method differs slightly depending on the ozone injection rate, it reaches approximately 99%, which is very high. During the increase in water inflow to the ozone recycling system from 2 L/min to 10 L/min, the average ozone recycling rate was 99.4% at a 1 ppm ozone injection rate, 98.6% at a 2 ppm ozone injection rate, 98.1% at a 3 ppm ozone injection rate. Ozone treatment facility operating costs can be divided into the costs of pure oxygen production, ozone production, and maintenance. The annual operating costs of ozone treatment facilities in Korea are estimated to be approximately 38.9 billion won. The annual savings are estimated to be approximately 5.8 billion won when the ozone transfer rate of the diffuser method, which is mostly employed in domestic water treatment plants, is 85% and 15% of the ozone is recycled.