• 제목/요약/키워드: Transition of railway and bridge

검색결과 30건 처리시간 0.034초

교량, 토공 접속구간 궤도동적계측 및 해석에 관한 연구 (Experimental and Analysis Study on Transition Area Between Bridge and Earthwork)

  • 강윤석;나성훈;신정렬;양신추
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2002년도 춘계학술대회 논문집
    • /
    • pp.250-255
    • /
    • 2002
  • The transition between bridge and earthwork often causes the problems of maintenance. The damages of the track on the transition area influence running safety of train and serviceability, increase the maintenance cost. Therefore it is very important to evaluate the dynamic responses of transition and take a efficient measure. In order to evaluate the dynamic behavior of track, the field estimations are performed at the transition area of a conventional line between bridge and earthwork. And the track system on the transition area numerically analyzed to evaluate the dynamic behavior of damaged track with void sleeper. The measured values and Analysis results such as wheel contact force, rail stress, displacement acceleration and track irregularity in the transition area show the dynamic forces are severe. So it is recommended that the transition area should be improved the rigidity by reinforcing the rail.

  • PDF

열차하중 재하시 교량상slab궤도의 상향력 민감도분석 (Parametric Analysis for Up-lifting force on Slab track of Bridge under Train Load)

  • 최성기;박대근;한상윤;강영종
    • 한국방재학회:학술대회논문집
    • /
    • 한국방재학회 2008년도 정기총회 및 학술발표대회
    • /
    • pp.279-282
    • /
    • 2008
  • The vertical forces in rail fasteners at areas of bridge transitions near the embankment and on the pier will occur due to different deformations of adjoining bridges caused by the trainloads. The up-lifting forces is not large problem in the blast track because the elasticity of blast and rail pad buffs up-lifting effect. But, it is likely to be difficult to ensure the serviceability of the railway and the safety of the fastener in the end in that concrete slab track consist of rail, fastener, and track in a single body, delivering directly the up-lifting force to the fastener if the deck is bended because of the end rotation of the overhang due to the vertical load. When the up-lifting force exceeds the clamp force of the fastener clip, the rail pad is out of fastener, which makes decrease the serviceability of the railway, such as noise and vibration. Furthermore, it is possible to reduce the safety of the track as the longitudinal resistance. This study is focused on guideline suggestion to decrease up-lifting force in the fastener adjacent to the civil joint of slab track of bridge throughout the parametric analysis between the vertical spring stiffness of the fastener as the material approach, the space of fastener adjacent to bridge transition, the rigidity of the girder as the geometrical approach and up-lifting force under the train load.

  • PDF

토목섬유와 시멘트처리채움재로 보강한 교량/토공 접속구조의 장기공용성 평가를 위한 실물가속시험 (Real-scale Accelerated Testing to Evaluate Long-term Performance for Bridge/Earthwork Transition Structure Reinforced by Geosynthetics and Cement Treated Materials)

  • 이일화;최원일;조국환;이강명;민경찬
    • 한국철도학회논문집
    • /
    • 제17권4호
    • /
    • pp.251-259
    • /
    • 2014
  • 교량/토공 접속부는 교량에서 토공으로 또는 그 반대방향으로 옮겨가는 구간으로 궤도 하부구조의 지지강성이 급격히 변화하기 때문에 차량 주행안정성에 매우 큰 영향을 미친다. 과거 유도상궤도를 사용할 때에는 접속부에 대한 성능요구조건이 높지 않았으나, 운행속도가 고속화되고 콘크리트궤도가 도입되면서 유지보수와 열차주행안정성에 상당한 영향을 미침에 따라 높은 성능수준을 요구하고 있다. 이에 본 논문에서는 기존의 교량/토공 접속구조의 단점을 보완하고 성능을 개선하기 위한 방안으로 토목섬유와 시멘트처리채움재로 보강된 접속구조를 제안하고 실물가속시험을 통한 성능평가를 수행하였다. 제안된 접속구조는 토목섬유를 이용하여 어프로치블럭을 보강하는 방안으로써 보강토 교대와 유사한 구조를 가지며, 사용재료는 시멘트처리된 흙자갈을 적용함으로써 유용토의 활용을 증대시키고 우수의 침입을 저감시켰다. 실물가속시험항목은 구조별 탄성변위, 누적 침하, 함수비, 교대에 작용하는 수평 및 수직 토압이며, 비교검토를 통해서 장기공용성능의 개선정도를 파악하고자 기존 접속구조와 제안 접속구조에 대한 시험을 동일조건하에서 수행하였다. 실물가속시험 결과, 제안구조가 침하 및 토압경감 측면에서 우수한 성능을 나타내었고 함수비 변동에 대해서도 저항성이 높은 것으로 나타났다.

교량/토공 접속구간 보강레일의 최적설계 (Optimal Design of Reinforced Rail over Connection Section of Bridge and Embankment)

  • 양신추;강윤석;김은
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2002년도 춘계학술대회 논문집
    • /
    • pp.256-263
    • /
    • 2002
  • This paper deal with optimal design of reinforced track as a track reinforcing method for transition area of track support stiffness in transition area between bridge and earthwork. When vehicle passes through transition area, dynamic properties between vehicle and track are studied by the analysis of vehicle-train interaction for the each case when reinforced tracks are used or not. furthermore, optimum decision of type and length of track are made based on the performance adapting variable parameters : support stiffness of track for bridge and earthwork, heading direction of vehicle and type and length of track.

  • PDF

교량 토공 접속부에서 궤도강성변화에 대한 실험적 연구 (Experimental Study on the Variation of Track Stiffness between Earthwork and Bridge)

  • 나성훈;서사범;손기준;김정환
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2001년도 춘계학술대회 논문집
    • /
    • pp.281-288
    • /
    • 2001
  • In order to evaluate the effect of impact load at support stiffness transition area, the field estimations are performed at the transition zone between earthwork and bridge on test operation of KTX. Due to differential settlement caused by the variations of track support stiffness, large impact forces are investigated. However, the measured values such as wheel load, rail stress, displacement and acceleration in the transition area shows that the stiffness changes in the transition area are not abrupt, and the stiffness in the infra track structure varies continuously. In this experimental study, the parameters influencing safety of transition area are not governed by partial or local stiffness because cumulative passing loads are not sufficient on test operation of KTX.

  • PDF

선로 이송 가설공법을 적용한 철도판형교 유도상화 (An experimental construction of railway steel plate girder strengthen adding ballast system by transport equipment)

  • 민지홍;서종원;장형식;박준원
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.707-716
    • /
    • 2011
  • It has been applied using cranes or insertion methods to install heavy structures to strengthen existing railway bridges. These methods are uneconomical because of two reasons. The first one is it is required to construct approach roads for heavy equipment and/or working yard. The second one is the electric lines shall be cutoff during construction. Both require additional construction cost and duration. In this study, new transport equipment was developed which can be applied to heavy structures up to 100 ton. Using this method, the heavy structure can be loaded into the new transport equipment at working yard and transported to the working site. This method can be applied, but not limited to railway bridge or roadbed rehabilitation. It was found that the precious construction can be achieved to install heavy structure using this method. The experimental construction to make non-ballast girder bridge composite with new pc deck slab using this method was carried out for Jewon bridge. The example bridge is in extreme condition because it locates above national road #38 within extreme transition curve and has 10 ‰ slope and skew. The experimental construction results were satisfactory both for safety and construction precision.

  • PDF

궤도강성변화구간의 레일압력 분포에 관한 연구 (Rail Pressure on the Changing Point of Track Modulus)

  • 이기승;천진녕;김성칠;권순섭
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2002년도 춘계학술대회 논문집
    • /
    • pp.228-233
    • /
    • 2002
  • The transition between bridge or tunnel and plain track has different rail pressure and distributed stress on formation. This paper shows distribution of rail pressure on transition at which spring stiffness are changed. By this study, it is revealed that the changing into relatively high stiffness causes increased rail pressure visibly and draw up dynamic track force. A medium stiffness structure and reinforced rail could be effective for reducing track force on the transition.

  • PDF

궤도-교량 상호작용을 고려한 콘크리트 슬래브궤도 부설 교량의 단부 사용성 검토 (Investigation of serviceability of bridge deck ends on concrete slab track-installed bridges considering track-bridge interaction)

  • 장승엽;양신추;김종태
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.1875-1881
    • /
    • 2007
  • Deformations of bridge deck ends on abutments or on transition between bridge decks can cause extreme deformations on track. Especially, since slab track is fixed onto the bridge deck slab on concrete slab track-installed bridges, deformations of bridge deck ends directly affect the track behavior, and thus these interactions can bring about the premature failure of rail fastenings or other deteriorations to lower the serviceability. In this study, a foreign standard to evaluate forces on track components caused by the track-bridge interactions and the serviceability of bridge deck ends is investigated, and for the real bridges, the serviceability of bridge deck ends according to several parameters of bridge and track is analyzed. It is found that arrangements and spring coefficients of bridge bearings, as well as distance between bridge bearing and last rail support, support spacings, rail support spring coefficient, are very important parameters.

  • PDF

Project level에서의 철도 PC Beam교량의 경년열화모델구성 및 유지관리비용 추정 (Time-Dependent Degradation Model and Maintenance Cost of Rail line PC Beam Bridge in Project Level)

  • 권세곤;박미연;도정윤;김두기
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.17-22
    • /
    • 2008
  • Construction project have extremely high risk in the process of construction owing to unexpected event, like as design amendment. As a result, owner have to endure enormous extra-cost to control the risk and continue to the project having more higher uncertainty. Also, if the structure is completed, it is needed that the structure is protected and maintained continuously during life cycle time to satisfying original aim of structure itself. LCC analysis to calculate cost of structure alternatives divides into two stage, one is design_LCC and the other is maintenace_LCC. But two stages all is needed in the transition deterioration model to calculate more reasonable LCC analysis. This paper developed the model using analysis of FMS contents and survey from professional about Prestressed concrete beam girder bridge(PC Beam bridge)in railway. The model is focused in project level of PC beam because any condition state information for element level analysis can not get up. This paper is intended to use the developed model in LCC analysis of PC Beam bridge in railway and constitute the foundation to perform more deep study in the near future.

  • PDF

장경간 청담대교에서 궤도의 변위와 구조불간의 상호작용에 관한 연구 (A study on interaction of track displacement and structure on long span Cheongdam Bridge)

  • 김순철;박석순;이종득;강정옥;한광섭
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2003년도 추계학술대회 논문집(II)
    • /
    • pp.117-122
    • /
    • 2003
  • Cheongdam Bridge in Seoul Metropolitan Subway Line No.7 recently constructed has 180 meters (2@90m) of expansion length of structure (distance between fixed points). Track type is all ballasted track and rail expansion joint is installed at every movable point. However, there is no expansion joint at the transition area between ballasted track ,end deck. By this reason, the rail buckling has been occurred every year and there is actually an abnormal behavior in expansion. In this study, based on the modeling of the Cheongdam Bridge, the element of interacting relationship between track and structure which is influential to track displacement in long-span bridge was analyzed and, finally, the methodology to ensure the continuous-welded rail in Cheongdam Bridge was suggested.

  • PDF