• 제목/요약/키워드: Train performance evaluation

검색결과 264건 처리시간 0.041초

한국형 고속전철 개발열차 열차성능해석 및 평가 (Train Performance Simulation and Evaluation for Korea High Speed Train)

  • 이태형;박춘수;신중린
    • 한국철도학회논문집
    • /
    • 제7권2호
    • /
    • pp.120-124
    • /
    • 2004
  • Computer aided simulation is an essential part in planning, design, and operation of railway systems. To determine the adequate performance and specification of railway system, it is necessary to calculate train performances such as distance, speed, power during train's running. This paper presents result of train performance simulation using the program that developed for Korea high speed train. To verify result of simulation, we have compared that with experiment data.

철도차량용 열차정밀측위장치 성능평가 방안 연구 (Study on the method for performance evaluation of Train-born Positioning System)

  • 신경호;신덕호;송용수;이재호
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.671-679
    • /
    • 2011
  • Now, for the continuous location detection of train, The method which the moving distance and speed of vehicles are detected using an odometer mounted within railway vehicle, is used in railway domain generally. There are some problems that the train's positioning errors are accumulated as the moving distances increase. To solve this problems, The Train-borne Positioning System is being developed at Korea Railroad Research Institute. It is required to evaluate exactly a positioning performance of The Train-borne Positioning System for improvement of performance. Therefore, in this paper, we review the CDGPS methods to acquire reference position for performance evaluation of Train-borne Positioning System and verify the accuracy of the reference position through the static test and the vehicle test.

  • PDF

차세대고속열차 본선 시운전 성능평가 방안에 대한 연구 (A Study on Performance Evaluation Plan of Next-Generation High-Speed Prototype Train during Test Run)

  • 김상수;최성훈;박춘수;김석원;김기환
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.1814-1820
    • /
    • 2010
  • Korean Train Express (KTX) has been commercially operating and achieving elevation on transport capacity since 2004. And the first hish-speed prototype test train, HSR-350x, was developed and succeeded in testing of running over 350km/h. Now KTX-II based on HSR-350x was started in service run. The new high-speed train development project, HEMU-400x project, has started since 2007. The protype train is being designed and manufactured. After the train are developed completely, it will run on the commercial line and will be test to verify the estimated performance. The authors devised the performance evaluation method and process of the HEMU-400x prototype system. And we introduce the definite performance test items and the method to vitrificate them in this paper.

  • PDF

통신기반 열차제어시스템 성능평가용 계측시스템 구현 및 적용 (Implementation & Application of Instrumentation System on Performance Evaluation for Korea-Radio Train Control System)

  • 이재호;이강미;박평식
    • 전기학회논문지
    • /
    • 제62권12호
    • /
    • pp.1777-1783
    • /
    • 2013
  • This study aims to implement an instrumentation system measuring and analysing real-time data of information flow between respective subunits composing train control system as the performance evaluation method for wireless communication based urban railway train control system under development for a Korean model. It analyses system functional requirements regarding subsystems composing wireless communication based train control system and test items for functions presented in each specification and examines data and measurement point for measuring according to test items in order to implement an instrumentation system. And, it clearly defines requirements of an instrumentation system to avoid malfunction or error in operation of train control system. It reviews data processing method and display method for effective analysis of data flow between respective subunits with measured data, designs and makes an instrumentation system. Ultimately, it applies to a performance test of train control system and makes sure an instrumentation system in normal working order.

전동차 차량 네트웍 성능평가기술 연구 (The Study of Performance Evaluation of Train Communication Network for EMU)

  • 이수길;한성호;구동회;송용수
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2003년도 추계학술대회 논문집(III)
    • /
    • pp.659-665
    • /
    • 2003
  • This paper presents a Train Communication Network simulator (TCNS) that can be used to evaluate the performance of TCN. TCN was accepted as the standard of the protocol for the communication network in trains. We carry out some simulation tests using the TCNS to show practical uses of the simulator. Results of some simulation tests are also reported. This paper presents a Train Communication Network simulator(TCNS) that can be used to evaluate the performance of TCN. TCN was accepted as the standard of the protocol for the communication network in trains. TCN of fieldbus was adopted as international standardization IEC 61375 in 1999. It has been operating on G7 train in korea. This paper developed TCNS(Train Communication Network simulator) as a simulator for performance evaluation. We can verify TCNS for preventing many kinds of occurring problems between the devices in data-communication. This study was developed TCNS as a simulator for the performance evaluation. We analyzed correlation between token, transmission data per paket and transmission speed of bus, through the TCNS, also analyzed result according to error rate of TCN. We carry out some simulation tests using the TCNS to show practical uses of the simulator. Results of some simulation tests are also reported.

  • PDF

고속전철 시스템 성능해석을 위한 열차 주행시뮬레이션 S/W 개발(2) (Development of a Train Performance Simulation S/W for The Performance Analysis of High Speed Railway System(2))

  • 이태형;현승호;정흥채;황희수
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2000년도 하계학술대회 논문집 B
    • /
    • pp.1381-1383
    • /
    • 2000
  • A multi-train operation simulation software is under development, in this G7 Project for a High Speed Train System, to simulate the running performance, power consumption, signalling and operation. In the first stage, a Train Performance Simulation (TPS) software is introduced in this paper. This is a core module of whole system and gives some parameters of a train, e.g., its position, speed traction and braking power and electric power system state, etc. In this paper, calculation technique was used for voltage drop at the train's positions and major posts along the catenary line. The final program will be used as an evaluation tool for system performance in constructing a new line or introducing a new train system.

  • PDF

차세대고속열차 성능시험을 위한 종합계측시스템 개발 연구 (A Study on Overall Measurement System Development of HEMU-400X Performance Test)

  • 이영엽;류상현;김봉래;김경택
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.1118-1123
    • /
    • 2011
  • The introduction of high speed railway(KTX) in Korea after the Korean high speed train through the KTX-II of the development is being run is made. Thus the demand for the railway technology advances and high performance, Korean government promoted the development of the next-generation high speed train system(HEMU-400X). In addition to the production of train system essential element of the train through an on-line test is to evaluate the performance. Through the on-line test of the train in order to evaluate the performance test items should be selected first and need to the test procedures are required. In addition, an Overall Measuring System(OMS) to measure the performance of the train system should be established. In this study for the on-line test of the HEMU-400X test items was selected for detailed measurements and performance evaluation of a comprehensive and efficient trains to test an OMS for the development are discussed.

  • PDF

HEMU-400X 종합계측시스템 개발에 관한 연구 (A Study on Overall Measurement System Development of HEMU-400X)

  • 류상현;홍준희
    • 한국철도학회논문집
    • /
    • 제14권6호
    • /
    • pp.484-488
    • /
    • 2011
  • 해외 철도 선진국들은 고속열차의 독자적인 설계능력, 시험평가체계와 평가기술을 보유하고 있다. 국내에서도 열차의 성능을 평가하기 위한 선진화된 계측기술 및 시스템 개발이 필요하다. 본 연구는 400km/h급 동력분산식 차세대고속열차 개발의 중요한 요소인 차량시스템 및 부품의 성능과 안전성 및 신뢰성 검증을 종합적이고 효율적으로 평가하기 위한 종합계측시스템 개발에 대한 연구이다. 종합계측시스템은 차량계측장치, 팬터계측장치 및 영상장치 등으로 구성되며, 계측시험에 대한 총괄 모니터링을 위해 종합계측실을 구성하였다. 본 연구는 향후 열차의 성능평가기술 향상에 이바지 할 것으로 판단된다.

전동차용 통신 네트워크 프로토콜 구현 및 성능평가에 관한 연구 (A Study on the Implementation and the Performance Evaluation of the Train Communication Network)

  • 이상철;박재현;장래혁
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제48권12호
    • /
    • pp.1580-1588
    • /
    • 1999
  • This paper evaluates the real-time performance of the Train Communication Network (TCN) that consists of WTB and MVB. A run-time scheduling algorithm for the hard-real time communication was proposed and its performance was evaluated. Also, a new addressing method and the adaptive tree algorithm were suggested to enhance performance. The overall performance was evaluated by computer simulation using Arena.

  • PDF

한국형 고속전철 집전장치의 성능 계측 및 평가 (Test and Evaluation of the Pantograph for Korean High Speed Train)

  • 서승일;박춘수;조용현;최강윤;목진용
    • 한국철도학회논문집
    • /
    • 제6권2호
    • /
    • pp.94-99
    • /
    • 2003
  • The pantograph for Korean High Speed Train was developed by home-grown technology. In this study, test and evaluation of the current collection performance of the pantograph is conducted. For this purpose, a measuring system is developed and installed on the prototype high speed train. Measurement is conducted while the train runs on the test track. The measuring system is composed of video monitoring system and telemetry & data processing system. It monitors the hazard behavior of the pantograph and measures acceleration and vertical force of the pan head. By applying the measuring system, accurate evaluation of the performance of the pantograph and safety assessment of the interface system of pantograph and catenary is facilitated.