• Title/Summary/Keyword: Train interval control

Search Result 28, Processing Time 0.032 seconds

A Study on Coupling Coefficient Between Rail and Reinforcing Bars in Concrete Slab Track (콘크리트 슬래브궤도에서 레일과 철근 사이의 결합계수에 대한 연구)

  • Kim, Min-Seok;Lee, Sang-Hyeok;Kwon, Jae-Wook;Lee, Jong-Woo
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1169-1177
    • /
    • 2008
  • The system of the railway signaling using the track transmits the approved speed to the location of a train and it. Referring to the way of transmitting train control information, there are the one transmitting it to the on-board system of a train using the direct track, the another transmitting it establishing an instrument, and the other transmitting an instrument by a railway track. The one is the method using the direct track as a conductor for composing the part of the track and attaining the information controlling a train by transmitting a signal to the track. It is used for the high-speed railway and the subway. The method using the track attains information by transmitting it to returned information, and the on-board system of a train attains it by magnetic coupling. Because many reinforcing bars on the concrete slab track are used, interaction between a rail and a reinforcing bar that is not produced on ballast track is made. Due to the interaction, the electric characteristic of rail is changed. In the current paper, we numerically computed the coupling coefficient between the rail and the reinforcing bar based on the concrete slab track throughout the model related to the rail and the reinforcing bar using the concrete slab track that is used in the second interval of the Gyeongbu high-speed railway, and we defined the coupling coefficient not changed in the electric characteristic of rail in the condition that there is no interaction between the rail and the reinforcing bar.

  • PDF

Study on a Propulsion Control of the Roller Coasters Train based on Air Cored Linear Synchronous Motor (공심형 선형동기전동기 기반의 궤도열차 추진제어에 관한 연구)

  • Jo, Jeong-Min;Han, Young-Jae;Lee, Jin-Ho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.12
    • /
    • pp.8187-8194
    • /
    • 2015
  • To accelerate a heavy roller coaster train with over 1G force, a lot of thrust is required and linear synchronous motor(LSM) as propulsion method is suitable for this kind of system. To increase the propulsion efficiency of LSM, precise and real-time position information of vehicle is required for accurate phase control. However, the discontinuous position information with relatively long time interval is usually transmitted from the hall-sensors on the track every magnet length. In this paper, the basic motor model based on traditional dq-axis equations is described and the motor dynamic model is produced by considering the cogging force and friction loss. To improve the position accuracy, the position estimator is also proposed for LSM control system. Simulations were performed to check the characteristics of the torque control system which includes the position estimator based on the motor model. Simulation results based on the linearized model show that this control system has an enough bandwidth and phase margin and the executed algorithm achieves an ideal effect to follow the real-time position signal. Therefore, the feasibility of position estimator is also confirmed.

A Study on Coupling Coefficient Between Rail and Reinforcing Bars in Concrete Slab Track (콘크리트 슬래브궤도에서 레일과 철근 사이의 결합계수에 대한 연구)

  • Kim, Min-Seok;Lee, Sang-Hyeok;Lee, Jong-Woo
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.3
    • /
    • pp.405-411
    • /
    • 2009
  • Railway signaling system in a rapid transit using the ATC system the approved a speed limit to a train and a part of signaling system in a metro approved a distance which is possible to move. Referring to the way of transmitting train control information, there are the one transmitting it to the on-board system of a train using the direct track, the another transmitting it establishing an instrument, and the other transmitting an instrument by a railway track. The one is the method using the direct track as a conductor for composing the part of the track and attaining the information controlling a train by transmitting a signal to the track. It is used for the high-speed railway and the subway. The method using the track attains information by transmitting it to returned information, and the on-board system of a train attains it by magnetic coupling. Because many reinforcing bars on the concrete slab track are used, interaction between a rail and a reinforcing bar that is not produced on ballast track is made. Due to the interaction, the electric characteristic of rail is changed. In the current paper, we numerically computed the coupling coefficient between the rail and the reinforcing bar based on the concrete slab track throughout the model related to the rail and the reinforcing bar using the concrete slab track that is used in the second interval of the Gyeongbu high-speed railway, and we defined the coupling coefficient not changed in the electric characteristic of rail in the condition that there is no interaction between the rail and the reinforcing bar.

Modeling of the Optimal Operation Pattern for Energy Saving of The Trains (전동열차의 운행에너지 절감을 위한 최적 운행 패턴 모델링)

  • Kim, Jung-Hyun;Lee, Se-Hoon;Jun, Sang-Pyo
    • Journal of the Korea Society of Computer and Information
    • /
    • v.19 no.12
    • /
    • pp.187-196
    • /
    • 2014
  • In this paper, Minimize driving energy for operation within a defined distance yeokgan fixed time-resolved and determine the nature of the train is traveling, and to model mathematically. Urban rail car cruise in general by the PID controller is used instead of automatically tracking a target value while traveling in energy consumption to be minimized by using optimal control model railroad charyangreul was designed under real operating conditions the same. The actual track conditions apply to the minimum value or a separate listing of cars around the track facility without a driving energy of the automatic operation and to reduce the driving energy. Therefore, actual route chosen straight line 8 / gradient segment / curve for the measured data analysis, such as sections within the city-minute drive each section and presented how the trains to save energy, depending on the pattern of the train station in the region.

A Study on the Brake Regulation Point to Obey Velocity Limits for Entering Speed Restriction Regions in the Distance to Go System (Distance to Go System에서 속도제한 구간 진입 시 속도준수를 위한 제동제어 시점에 관한연구)

  • Kim, Tae-Kyu;Lee, Jong-Woo
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.5
    • /
    • pp.426-438
    • /
    • 2015
  • Train speed controlling systems are now changing from wayside systems to onboard signaling systems. Locomotive engineers refer to wayside markers to decide on a braking point when the train speed appears to be lower than the current speed. However, in the onboard signaling systems that have been installed recently, the braking point is not determined by the wayside signal but by an onboard value. In this paper, we studied braking points and methods for deciding on such points by engineers using the onboard systems. An optimized braking point is proposed via simulation of decelerating velocity to control the velocity in the signaling system through a predefined point; Gaussian distributions are used to simulate the actual situation. We estimated and demonstrated how to obtain braking parameters in order to satisfy the interval of permitted error.

Design of an Optimal Controller with Neural Networks for Nonminimum Phase Systems (신경 회로망을 이용한 비최소 위상 시스템의 최적 제어기 설계)

  • 박상봉;박철훈
    • Journal of the Korean Institute of Telematics and Electronics C
    • /
    • v.35C no.6
    • /
    • pp.56-66
    • /
    • 1998
  • This paper investigates a neuro-controller combined in parallel with a conventional linear controller of PID type in order to control nonminimum phase systems more efficiently. The objective is to minimize overall position errors as well as to maintain small undershooting. A costfunction is proposed with two conflict objectives. The neuro-controller is trained off-line with evolutionary programming(EP) in such a way that it becomes optimal by minimizing the given cost function through global evaluation based on desired control performance during the whole training time interval. However, it is not easy to find an optimal solution which satisfies individual objective simultaneously. With the concept of Pareto optimality and EP, we train the proposed controller more effectively and obtain a valuable set of optimal solutions. Simulation results show the efficacy of the proposed controller in a viewpoint of improvement of performance of a step response like fast settling time and small undershoot or overshoot compared with that of a conventional linear controller.

  • PDF

Study on the Maintenance Interval Decisions for Life expectancy in Railway Turnout clearance Detector (철도 분기기 밀착검지기 Life expectancy의 유지보수 주기 결정에 관한 연구)

  • Jang, ByeongMok;Lee, Jongwoo
    • Journal of the Korean Society for Railway
    • /
    • v.20 no.4
    • /
    • pp.491-499
    • /
    • 2017
  • Railway turnout systems are one of the most important systems in a railway and abnormal turnout systems can cause serious accidents. To detect an abnormal state of a turnout, turnout clearance detectors are widely used. These devices consider a failure of a turnout clearance detectors to be a failure of the turnout system, that could hinder train operations. Analysis of turnout clearance detector failures is very important to ensure normal train operation. We categorized failures of detectors into four groups to identify failure characteristics of the 140 detectors, which are composed of main line detectors (A), side tracks (B), detectors that are in operation more than 80 times a day (C) and detectors that are in operation fewer than 10 times per day. Failures of detectors have mainly been caused in the control part, in the cables and sensors; failures are classified into four groups (A, B, C and D). We have tried to find failure density distributions for each type of failures, inferring the parameter distributions a priori. Finally, using the Bayesian inference we proposed a maintenance time for control parts through the mean time of the detector, life and the life expectancy.

AdaBoost-based Gesture Recognition Using Time Interval Window Applied Global and Local Feature Vectors with Mono Camera (모노 카메라 영상기반 시간 간격 윈도우를 이용한 광역 및 지역 특징 벡터 적용 AdaBoost기반 제스처 인식)

  • Hwang, Seung-Jun;Ko, Ha-Yoon;Baek, Joong-Hwan
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.22 no.3
    • /
    • pp.471-479
    • /
    • 2018
  • Recently, the spread of smart TV based Android iOS Set Top box has become common. This paper propose a new approach to control the TV using gestures away from the era of controlling the TV using remote control. In this paper, the AdaBoost algorithm is applied to gesture recognition by using a mono camera. First, we use Camshift-based Body tracking and estimation algorithm based on Gaussian background removal for body coordinate extraction. Using global and local feature vectors, we recognized gestures with speed change. By tracking the time interval trajectories of hand and wrist, the AdaBoost algorithm with CART algorithm is used to train and classify gestures. The principal component feature vector with high classification success rate is searched using CART algorithm. As a result, 24 optimal feature vectors were found, which showed lower error rate (3.73%) and higher accuracy rate (95.17%) than the existing algorithm.