• 제목/요약/키워드: Track structure

검색결과 565건 처리시간 0.036초

궤도고무부품의 열해석에 관한 연구 (A study of Heat Analysis on Track Rubber Parts)

  • 김영수
    • 한국정밀공학회지
    • /
    • 제16권9호
    • /
    • pp.117-122
    • /
    • 1999
  • Track rubber parts has heat built-up as long as dynamic loading is applied from running tracked vehicles. Durability is required for rubber part to sustain the heat accumulation and heat exchange between rubber-metal assembly and environmental air and ground. For this research, the track assembly was divided into four parts i.e., bottom track shoe, upper track pad, pin busing and metal structure. Three rubber parts and metal structure were modelled and analyzed with MARC package program to obtain time-temperature data which was induced form mechanical work of tracked vehicles. heat accumulation data was obtained from special experiments under the room temperature of 25$^{\circ}C\;and\;35^{\circ}C$ to simulate the actual environmental conditions. From this research, it is cleared that the environmental temperature does not affect to the heat accumulation speed in rubber parts. Also, the heat built-up mechanism was clarified from the thermo-mechanical work based on numerical analysis and experiments.

  • PDF

궤도구조 성능검증체계 및 선정프로세스 구축 (Development of Verification System and Selection Process for Track Structure)

  • 이호룡;장승엽;김연국;윤성순
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.292-298
    • /
    • 2010
  • Recently, with the beginning of the commercial operation of high-speed railway, there have been a number of changes in track structure fields. Also, it is expected that the development and introduction of new technology will be increased afterwards. However, it accompanies a lot of risk to install new track structures of which performance and safety are not verified on permanent ways with high traffic density. Therefore, to minimize the risk and enhance the adoption of new technology, it is required to develop a systemic verification system for track structure. To do this, in this paper, main contents of a draft of guidelines for track structure verification, and main issues in debate such as criteria and method for verification, test conditions and test periods are discussed. Also, a process to choose a most appropriate one for a specific project out of proven track structures by the above verification system, the selection process by the technical investigation committee and the VE process to analyze the economical and maintenance aspects based on LCC concept in Korea Rail Network Authority is introduced.

  • PDF

도시철도 본선 토공구간에서의 포장궤도 시험부설 (Test Construction of the Paved Track at Subway Main Line)

  • 이일화;강윤석;공선용;김상진;이순구;정연식
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.1689-1694
    • /
    • 2008
  • Recently, the development of the paved track is required as a low-maintenance of conventional line. The main reason is that the line capacity and bearing of track are increased progressively. The important factors of paved track are stability and applicability. To be based on this subject, cement mortar pouring type paved track is developed. The paved track is a kind of concrete track using the prepacked concrete technique. The most important thing to design the paved track is to optimize the track structure and materials considering various conditions. Until now, the paved track is verified a various material and structure test. In this paper, it is introduce to the test construction at the urban subway main line. The test construction is completed at Dec. 2007. A major object and substance is a guarantee of construction progress on main line, track performance, construction technique for curved section, transition zone and winter season, recycling the used ballast and application of specific sleeper for sharp curved section.

  • PDF

등가 전단 스프링 모델을 이용한 플로팅 슬래브궤도 연결부에서의 하중전달 특성 분석 (Investigation of Load Transfer Characteristics at Slab Joints In The Floating Slab Track by Equivalent Shear Spring Model)

  • 장승엽;안미경;최원일;박만호
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.2838-2843
    • /
    • 2011
  • Recently, the floating slab track that can effectively mitigate the vibration and structure-borne noise is being discussed to be adopted. The floating slab track which is a track system isolated from the sub-structure by vibration isolators. Unsimilarly to conventional track and the slab deflection is large. Therefore, the running safety and ride comfort should be investigated. Especially at slab joint since the load cannot be transferred, the possibility that the dynamic behavior of track and train became unstable is high. Thus, in general dowel bar are often installed at slab joints. To determine the appropriate dowel ratio the load transfer characteristics should be investigated. In this study, dowel bar joint is modeled by equivalent shear spring and this model is verified by comparison with experimental results. Using the proven model, the load transfer efficiency and deflection at slab joint according to dowel ratio, and stiffness and spacing of vibration isolator were examined.

  • PDF

이득의 자유도와 주파수 적응성을 가진 외란 관측기를 사용한 새로운 트랙 추종 제어 기법 (A New Track-following Control Method Using Disturbance Observer with the Freedom of Gain and Frequency Adaptation)

  • 정우민;김은태
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년 학술대회 논문집 정보 및 제어부문
    • /
    • pp.360-362
    • /
    • 2006
  • This paper proposes a new track-following control method using disturbance observer with the freedom of gain and frequency adaptation in optical disk drive system. Recent ODDs use smaller track pits, higher rotation speed and broader rotational speed variations to increase the data capacity and data transfer rate. This cause the degradation of track-following performance by increasing the disturbance of the rotary system. In this paper, we discussed on a DOB structure that efficiently attenuate the disturbance without effecting the overall feedback loop characteristics on CLV type ODD which uses a higher and broader range of rotational speed. DOB structure uses two band pass filter. We analyzed the track-following performance sensitivity on rotational frequency variance and gain changes. This analysis is done on a computer simulation environment and actual ODD product.

  • PDF

공용중인 철도교량의 안전성 평가를 위한 궤도-교량 해석모델 개발 (Development of an Analytical Track-Bridge Model for Safety Assessment of Railway Bridge on Service Line)

  • 엄맥;강덕만;최정열;김만철;박용걸
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.1077-1092
    • /
    • 2007
  • The structural analysis model for estimate of load carrying capacity of railway bridge on service line is important to determine safety of bridges in service, we need to take response of bridge exactly, applying analysis model similar to the real railway bridge most. Track structure which is to distribute loads and decrease vibrations occurred from running train is constructed on the railway bridges. And it is important factor which should be considered to understand exact dynamic and static responses of bridge. But track structure is currently classified as a none structural members in the structural analysis model for estimating load carrying capacity of railway bridge and not considered in analysis model. That's the reason it is difficult to understand exact behavior of bridges. Therefore, the major objective of this study is to develop an analytical track-bridge model which is similar to real railway bridges considering track structure for safety assessment of railway bridge on service line to be effectively done.

  • PDF

도시철도 시험선 구간에서의 포장궤도 시험부설 및 성능평가 (Construction and Evaluation of the Paved Track on Test Line)

  • 이일화;심재규;이춘호;박균서;류경식
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.1115-1120
    • /
    • 2007
  • Recently, the development of the paved track is required as a low-maintenance of conventional line. The main reason is that the line capacity and bearing of track are increased progressively. The important factors of paved track are stability and applicability. To be based on this subject, Cement Mortar Pouring(CMP) paved track is developed. CMP paved track is a kind of ballast reinforced track using the prepacked concrete technique. The most important thing to design the paved track is to optimize the track structure considering various conditions. In this study, the CMP track is constructed(30m) on a test line and the track performance tested by running train to evaluation the capability and workability. The track performance are tested to confirm the vibration acceleration of the car body, wheel and track, accumulated settlement, track irregularity and crack of surface.

  • PDF

철도궤도 시스템의 신해석 모델연구 (A Study of New Analytical Models for Railway Track System)

  • 김성득;김미룡
    • 대한교통학회지
    • /
    • 제9권2호
    • /
    • pp.75-86
    • /
    • 1991
  • A conventional track structure system of rails ties ballast subballast and subgrade. An adequate engineering analysis require consideration of all major components of track system. This paper briefly reviews existing methods of track analysis and presents a new model based of the examination of the Tallbot Model. The new model has been validated by comparision with settlements from other model.

  • PDF

철도교 콘크리트 슬래브궤도의 사용성에 관한 매개변수 영향 연구 (A Parametric Study on the Serviceability of Concrete Slab Track on Railway Bridges)

  • 박홍기;장승엽;양신추;박용걸
    • 한국철도학회논문집
    • /
    • 제12권1호
    • /
    • pp.95-103
    • /
    • 2009
  • 교대나 교각 위 교량 슬래브 단부의 변형은 궤도 틀림이나 유지보수의 주요 원인이 되고 있으며, 특히 콘크리트 슬래브궤도가 설치되는 경우에는 궤도구조의 강성과 교량 슬래브와의 일체 성으로 레일 및 지지구조의 사용성에 심각한 영향을 미치는 변형과 추가하중이 발생하게 된다. 이번 연구에서는 교량 슬래브 단부 변형으로 인해 발생하는 궤도구조의 사용성에 영향을 미치는 인자를 파악하고 매개변수 해석을 통해 변수 별 영향 정도를 파악하였다. 연구 결과 단경간교 보다 연속교가 레일 지지점 하중 감소에 유리하고, 마지막 레일 지지점과 교량받침 사이 간격, 교량받침 강성, 체결구 강성이 사용성에 큰 영향을 미치는 것으로 분석되었다.

B2S궤도시스템의 초기 시설 투입비용 분석 (Initial Investment Cost Analysis of Facilities of B2S Track System)

  • 김효산;민준호;유재광;이달재
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.733-739
    • /
    • 2011
  • B2S(Ballasted track To Slab track) that is track system has been first developed in 2004 with foundation of rich experience and know-how of subway track upkeep and mending of facilities in 36 years to improve an existence pebble track at a concrete track. 'B2S' is admitted technology through patent registration in the domestic and Europe and it's made by a factory and put together at field, so it's able to construct precisely and to reduce a construction period. In addition, safety, the ecological balance and durability are excellent, and walking, cleaning, etc. has the advantage of easy maintenance. 'B2S' is currently laying 27.7km at Seoulmetro as of end of 2010 standard, but it'll be expected to be applied to a domestic Metro more from now on. It is possible to classify the total cost resolution structure of B2S system by R&D cost, test production and experiment cost, the initial facility cost, maintenance cost, disposal cost. In this research, it seems useful for selection evaluation which considered the life cycle cost or economics of the concrete track structure by analyzing an initial cost of facilities.

  • PDF