• Title/Summary/Keyword: Track roadbed

Search Result 117, Processing Time 0.026 seconds

Study of the Long-Term Behavior Characteristics of Roadbed on Concrete Track of High-speed Railway (고속철도 콘크리트 궤도상 토공노반의 장기거동 특성 연구)

  • Choi, Chan-Yong;Jung, Jae-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.4
    • /
    • pp.8-16
    • /
    • 2018
  • This study examined the long-term behavior of a roadbed using high-speed railway concrete track and roadbed measurement data and evaluated the long-term performance of the track and roadbed. Recently, high-speed railway track type has been adopted as a concrete slab. On the other hand, the concrete track is vulnerable to roadbed settlement. In the case of gravel tracks, it is easy to restore the original state by maintenance even if the roadbed settles. On the other hand, in the case of the concrete track, if excessive settlement of the roadbed occurs, cracks are generated continuously on the slabs and sleepers, resulting in greatly reduced usability. For this reason, it is difficult to restore the original state only by partial maintenance. In this paper, a long-term performance evaluation was carried out on a concrete track during operation by monitoring the measurement data of sensors buried from the beginning of construction for approximately 3 years after the high-speed railway opened. Performance evaluation methods include a performance evaluation of track/roadbed when the train passes, long-term track and roadbed performance evaluation, analysis of the track/roadbed effect on long-term settlement and analysis of the factors influencing long-term settlement. The trail response of KTX-Sancheon was greatest in the track/roadbed performance evaluation by train. The results of the long-term track and roadbed performance evaluation were measured within the standard values. The track and roadbed performance impact assessment with long-term settlement was strongly related to TCL settlement. The influences of the water content and groundwater level were verified by analyzing the external factors of long-term settlement. Through such a method, the stability of a track/roadbed can be secured.

Analysis of Settlement and Stress Characteristics about Influence of Track Parameters on Railroad Roadbed by using GEOTRACK (GEOTRACK을 이용한 궤도변수에 따른 침하 및 응력 특성 분석)

  • Shin, Eun-Chul;Lee, Han-Jin;Kang, Jeong-Gu;Yang, Hee-Saeng
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.395-403
    • /
    • 2007
  • Railroad track consists of relatively simple structures such as rail, sleeper, ballast. Roadbed shares vertical pressure by train load which passed through rail to ballast as base that supports the track. For evaluating stress and displacement of roadbed due to the railroad load is an important role on the track as a basic data for estimation of the durability and design of the roadbed thickness. GEOTRACK program applied multi-layered theory was developed for analyzing railroad track structure. GEOTRACK program is a sort of numerical analysis program which has advantage that can analysis component of track by simple method. In this study, this program was used to preform the numerical analysis by changing track conditions and roadbed conditions such as tie, reinforced roadbed, dynamic wheel load, Resilient modulus and so on. Further detail will be presented on the paper.

  • PDF

A Method for the Analysis of Train/Slab-Track Interaction on Settled Roadbed (슬래브궤도 노반침하구간 차량/궤도 상호작용 해석기법 개발)

  • Yang, Sin-Chu;Hong, Chul-Kee
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.3 s.40
    • /
    • pp.296-305
    • /
    • 2007
  • A numerical method for the analysis of train/slab-track interaction on the settled roadbed is developed based on the already developed analysis method of train/ballast-track interaction. The concrete slabs composed of the upper track concrete layer and the lower hydraulic bonded layer are modelled by a equivalent beam. The supporting stiffness of roadbed is evaluated with the modified boussinesq method suggested by Eisenmann. The track irregularity and the gap between slab and roadbed induced by settlement of roadbed are calculated by the effective method newly presented in this study. The validation of the developed method is investigated by a numerical example. The effects of train speed on train and slab track on the settled roadbed with sinusoidal shape of wave length 20m and amplitude 20mm are reviewed.

Application of Geotextile to ensure the Motor Pouring Ability for Paved Track (포장궤도 모르터 충진성능 확보를 위한 토목섬유의 적용)

  • Lee Ho-Ryong;Park Jong-Kyan;Hwang Seon-Keun;Lee Il-Wha
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.836-841
    • /
    • 2005
  • As gravel roadbed is gradually turn down by repetitive loading of train, lasting work for maintenance and management of track is necessary to reduce the settlement of roadbed and the deterioration of track. Despite of above weak point, gravel roadbed has become a basic structure of roadbed at the present time. But request for new structure of roadbed is recently presented to settle an increased transportation capacity of track, and to solve a shortage of the labor to handle maintenance work of track. Therefore, we begin to research about maintenance-free roadbed like paved track from two years ago. In this study, a series of tests were performed to clarify the characteristics of strength and permeability of concrete specimen, which is the upper part of paved track injected by cement mortar, by type of geotextile and finally to give a basic data for application of geotextile to the lower part of paved track.

  • PDF

A Study on the Criteria of Settlement in Concrete Slabtrack (토노반상 콘크리트궤도의 노반허용침하기준설정에 관한 연구)

  • Hong, Chul-Kee;Yang, Shin-Chu;Kim, Yun-Tae
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.3 s.40
    • /
    • pp.355-364
    • /
    • 2007
  • Recently a concrete slab tracks are being constructed on roadbed in the Gyoeng-bu 2nd phase high speed railways. In respdnding to this trend, new design standards and track materials maintenance systems, based on the slab track material safety and usage perspective, are needed. This research provides a roadbed design criteria and the maintenance system. The proposed roadbed design criteria and the maintenance system are based on the developed analysis meathod of train/slab-track interaction. where the roadbed settlement and train speed are utilized as mediating variables. In the analysis, the dynamic response of train/slab-track interaction apply to various speeds and settlements. the roadbed settlement is shown in a sinusoidal shape of wave, the scope of the settlement occurrence presented in its wavelengths, include 6meters, 10meters, 15merwes, 20meters, 30meters. The train speeds involved are 50, 100, 150, 200, 250, 300, 350, 400kilometers per hour.

Behavior Characteristics of Ballasted Track on Asphalt Roadbed Using Real Scale Test (실대형 실험을 통한 아스팔트 노반상 자갈궤도의 거동 특성)

  • Lee, Seonghyeok;Lee, Jinwook;Lee, Hyunmin
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.3
    • /
    • pp.252-260
    • /
    • 2015
  • Ballasted track on an asphalt roadbed can be beneficial for its various effects such as (i) decreasing of roadbed thickness by dispersing train load; (ii) prevention of both strength reduction and weakening in roadbed system by preventing rainwater penetration; and (iii) reducing maintenance cost by preventing roadbed mud-pumping and frostbite. With these beneficial effects, ballasted track on asphalt roadbed has been widely used in Europe and Japan, and relevant research for applying such ballasted track on asphalt roadbed systems in Korea is ongoing. In this study, full-scale static and dynamic train load tests were performed to compare the performance of ballasted track on asphalt roadbed and ballasted track. The optimum thickness levels of asphalt and reinforced roadbeds, corresponding to the design criteria for reinforced roadbed of high-speed railway, was estimated using the FEM program ABAQUS. Test results show that the earth pressure on reinforced roadbed of ballasted track on the asphalt roadbed was relatively low compared with that of simple ballasted track. The elastic and plastic displacements of simple ballasted track on the asphalt roadbed were also lower than those of ballasted track. These test results may indicate that the use of ballasted track on asphalt roadbed is an advantageous system in view of long-term maintenance.

Characteristics of Roadbed Behaviors of Concrete Track for High-Speed Railway (고속철도 콘크리트궤도용 흙노반의 거동 특성)

  • Lee Il-Wha;Lee Su-Hyung;Kang Yun-Suk
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.3 s.34
    • /
    • pp.298-304
    • /
    • 2006
  • An active application of concrete track is being expected for the future constructions of Korean railroad. For the successful concrete track construction and design in earthwork areas, the roadbed behavior should be reasonably estimated using the proper analysis method. In this paper, behaviors of concrete track on the reinforced roadbed constructed with the standard stiffness and depth were estimated thorough numerical analyses and field measurements. A three dimensional finite difference method was employed to model the concrete tracks and subground. The settlement and vertical pressures caused by train load were estimated by the numerical method and compared with the field measurement results. The bearing characteristics of roadbed were presented and the proper method for the analysis of concrete track was proposed.

Effect of Settlement Restoration Grouting between concrete track/Roadbed on the train service stability (콘크리트궤도 침하복원을 위한 궤도/노반 인터페이스부 그라우팅이 주행안정성에 미치는 영향)

  • Lee, Il-Wha;Lee, Sung-Jin;Lee, Tae-Guen;Kang, Tae-Ho
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.796-804
    • /
    • 2008
  • Various design factors should be considered in order to apply the concrete slab track system on the soil/rock roadbed. One of the important factors is the settlement of roadbed. This settlement of concrete track should be supervised under the allowable settlement limit. If the settlement of roadbed under the concrete track exceed the allowable limit, the train serviceability will considerably come down and furthermore the fatal disaster may happen. Therefore, in this paper we introduced a digitalized grouting method as a settlement restoration method that can be suitably adopted to the concrete slab track. And we also evaluated the train service stability through the analysis of the track behavior according to the difference of the stiffness between the grouted part and the original roadbed.

  • PDF

The Dynamic Interactive Analysis of track and train system with Roadbed Displacement in Subgrade Concrete Slabtrack

  • Hong, Chul-Kee;Yang, Shin-Chu;Kim, Youn-Tae
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.379-386
    • /
    • 2007
  • Recently the concrete slab tracks are being constructed on roadbed in the Kyong-bu 2nd stage high speed railways. In responding to this trend, new design standards and track materials maintenance systems, based on the slab track material safety and usage perspective, are needed. This research provides the design standards and the maintenance system. The proposed standards and the maintenance system are based on the track theory and the track-train interaction program developed, where the roadbed displacement and train speed are utilized as mediating variables. In the analysis, the dynamic response of track-train interaction apply to various speeds and displacements. the roadbed displacement is shown in a sine curve, the scope of the displacement occurrence, presented in its wavelenths, include 6meters, 10meters, 15meters, 20meters, 30meters. the train speeds involved are 50,100, 150,200,250,300,350,400 kilometers per hour.

  • PDF

Sensitivity Analysis of the Factors Influencing for Decision of Reinforced Roadbed Thickness (강화노반 두께 결정을 위한 영향인자 민감도 분석)

  • Choi, Chan-Yong;Lee, Jin-Wook;Bae, Jae-Hoon;Shin, Eun-Chul
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1827-1832
    • /
    • 2007
  • The purpose of a railway track is to provide a smooth surface for safe and economical train transportation. The performance of the track results from a complex interaction of the track and subgrade components in response to train loading and environmental actions. In the past, the role of subgrade as the track foundation were not recognized adequately. There are insufficient information and inadequate methods for subgrade design, assessment and improvement. This situation has survived for a long time largely because a subgrade defect can often be adjusted by adding more ballast under the ties or applying more frequent track maintenance. Therefore, the application of reinforced roadbed technology will be expected to increase in the future. The reinforced roadbed thickness is set depending on subgrade reaction modulus$(K_{30})$ in the condition of upper subgrade through PBT in both conventional railroad and KTX railroads. As train velocity (V), train passing tonnage (N), and train axial load (P) are not considered in design, the roadbed thickness could be overestimated (or underestimated). Therefore, In this study, the computer model, GEOTRACK, was analyzed the influence of reinforced roadbed thickness factors on track modulus and the characteristics of stress pulses in track and subgrade generated by repeated axle loading.

  • PDF