One of the most important targets of transportation is to transport human and commodities to the destination safely. Railway has low risk, compared with land, ocean and flight route and it assures high security as well as high speed driving, since it runs on regular track. However, train accident may result in tragic accident due to small carelessness, so special event recorder is preferably used in order for clarity of responsibility in case of accident, maintenance of signal device and defect analysis. JRU(Juridical Recorder Unit) for ATC/ATS/ATP can be more advanced event recorder. Event recorder of KTX-I which is running now is installed one by one on each leading car and last car, and operation plan of event recorder in case of single trainset is suggested. But regarding train operation of multi-coupled trainset operation such as KTX-II, more detailed study is required for event recorder revitalization and record data process method. Therefore, this research aims at operation plan used in existing event recorder, and suggests effective operation and management plan of event recorder in multi-coupled trainset such as new High Speed Train.
A railway is a complex system integrated with a lot of technical elements such as trains, track facilities, human factors, operation & control and maintenance. As a mass transportation system, a railway could contain potential risks that may result in a high death rate and property losses. Accordingly, Railroad Safety Technology R&D Corps. is adopting the plan of the construction of Railway Safety Test Facilities as a part of the Railway Total Safety Project to enhance the railway safety, and carrying out researches on effective project management methods with Systems Engineering techniques. Recently, various systems engineering tools such as CORE or Cradle are applied to manage the system requirements and the project management process in the part of the aerospace engineering and automobile engineering so on. The railway industry also makes an effort to develop an efficient management skills using systems engineering tools as the railway system is multi-disciplinary. Therefore, we propose the more effectual management method of constructing the Railway Safety Test Facilities applying the systems engineering tool to the research.
According to introduce KTX in Korea, rail-road bridge section of KTX was increased approximately 50% of the total length. Bridge is required periodic inspection and check to prevent accident and hazard because various damage which have effects on traffic and replacement of damaged parts is difficult. Specifically, the train as large-scale transportation because accidents led to great damage, preventing these accidents are critical. Well-organized management and maintenance systems are required to prevent the accidents. In the case of roadway bridge, bridge inspection vehicle is used to deploy inspectors in roadway bridge. However, this method requires a lot of time and efforts, and inspectors are exposed to potential hazard. Also, surrounding environment like poor lighting system or electric wire could harm the inspector while repairing. Due to this reason, automatic repairing and inspecting system have been introduced to replace the old methods. Management system of the railroad bridge track for trains uses various advanced equipments, but whereas roadway bridge management system is lacking these efforts. As a result of that, this study looks over the existing management method. and review the method to apply the Bridge Inspection Robot in railroad bridge. Moreover, this study suggests future management technology using inspection robot.
Personnel maintaining or repairing the railway tracks or signaling device around tracks may experience the sensory disorder when they do routine works for many hours and they may not recognize the leading to train accidents. In order to prevent such train accidents that may occur because railway track workers are unable to recognize the approaching train, a safety-equipment is developed to make the approaching train send signals. We developed the new alarm equipment for protection of trackside maintenance workers using radio signals.
The rail temperature is important to preserve the joint gap for standard length of rail and to determine the installation temperature which has direct influence on the rail buckling and failure in welded part for continuous welded rail(CWR), Therefore, we have measured and investigated various characteristics of rail temperature for each kind of rail. As the results of this, the correlation between the atmosphere temperature and the rail temperature which is commonly used by Korean Railway should be reconsidered. Also, the daily highest '||'&'||' lowest rail temperature was occurred when each temperature is higher and when it's lower. For the light rail, the rail temperature by the sun-light increases quickly and decreases late. But the time where the highest temperature is attained is same. There are some differences between the shade and sunny place about 3.0∼4.0$\^{C}$. The temperature of rail web is almost close to the conversion rail temperature for rail expansion. The wind of 1 m/s has an influence on the rail temperature around 5$\^{C}$.
Nelson, Pamela F.;Martin-Del-Campo, Cecilia;Hallbert, Bruce;Mosleh, Ali
Nuclear Engineering and Technology
/
v.48
no.1
/
pp.114-128
/
2016
The development of operational performance indicators is of utmost importance for nuclear power plants, since they measure, track, and trend plant operation. Leading indicators are ideal for reducing the likelihood of consequential events. This paper describes the operational data analysis of the information contained in the Corrective Action Program. The methodology considers human error and organizational factors because of their large contribution to consequential events. The results include a tool developed from the data to be used for the identification, prediction, and reduction of the likelihood of significant consequential events. This tool is based on the resilience curve that was built from the plant's operational data. The stress is described by the number of unresolved condition reports. The strain is represented by the number of preventive maintenance tasks and other periodic work activities (i.e., baseline activities), as well as, closing open corrective actions assigned to different departments to resolve the condition reports (i.e., corrective action workload). Beyond the identified resilience threshold, the stress exceeds the station's ability to operate successfully and there is an increased likelihood that a consequential event will occur. A performance indicator is proposed to reduce the likelihood of consequential events at nuclear power plants.
Wireless communication networks are recently taking an important role in railroad systems as railways now require high speed and high density operation with the aid of advanced information technology to improve maintenance efficiency and to handle passenger service growth. Train control systems are consequently changing from track circuitbased systems to communication-based systems. This paper analyses the role of wireless communication networks in recent railroad systems, reviews foreign cases, and then suggests a communication network constructing policy for increased transport capacity increase, securement of safety, and efficient train control.
Park, Ki-Shik;Park, Juyoung;Koh, Seok-Joo;Jo, In-June
The Journal of Korean Institute of Communications and Information Sciences
/
v.28
no.10B
/
pp.876-890
/
2003
This paper proposes a protocol for the reliableand QoS-aware multicast transport, which is called the Enhanced Communications Transport Protocol (ECTP). The ECTP has so far been developed and standardized in ITU-T SG17 and ISO/IEC JTC 1/SC 6. Differently from the conventional reliable multicast, as shownin the IETF RMT WG, the ECTP additionally provides several distinct features such as tight control of multicast session, tree-based error control, and QoS management. For the tight control of multicast connections, the sender is at the heart of one-to-many group communications, and it is responsible for overall connection management such as connection creation/termination, pause/resumption, and the join and leave operations. for tree-based reliability control, ECTP configures a hierarchical tree during connection creation. Error control is performed within each local group defined by a control tree, which was partly designed like the IETF TRACK approach. Each parent retransmits lost data in response to retransmission requests from its children. For QoS management, ECTP supports QoS negotiation for resource reservation, and it also provides QoS monitoring and maintenance operations. ECTP has been implemented and tested on Linux machine, along with Application Programming Interfaces based on Berkeley sockets. For basic testing of the ECTP functionality, we give some preliminary experimental results for performance comparison of ECTP and TCP unicast transports. In conclusion, we describe the status of ECTP experimentations over APAN/KOREN testbed networks
Journal of the Korean Society for Nondestructive Testing
/
v.30
no.2
/
pp.98-103
/
2010
In this paper, imaging processing study obtained from CCD image and thermography image was performed in order to treat easily thermographic data without any risks of personnels who conduct the condition monitoring for the abnormal or failure status occurrable in industrial power plants. This imaging processing is also applicable to the predictive maintenance. For confirming the broad monitoring, a methodology producting single image from the panorama technique was developed no matter how many cameras are employed, including fusion method for discrete configuration for the target. As results, image fusion from quick realtime processing was obtained and it was possible to save time to track the location monitoring in matching the images between CCTV and thermography.
Road or Railway construction over soft ground is needed to be considered on secondary consolidation which will be caused differential settlement, lack of transport serviceability, higher maintenance cost. Especially for the railway construction in the second phase of Gyung-Bu or Ho-Nam high speed railway, concrete slab track has been adapted as a safe and cost effective geotechnical solution. In this case controlling the total settlement under the tolerance is essential. And pile supported geogrid reinforced construction method is suggested as a solution for the problem of the traditional method on soft soil treatments. Pile supported geogrid reinforced construction method consists of piles that are designed to transfer the load of the embankment through the compressible soil layer to a firm foundation. The load from the embankment must be effectively transferred to the piles to prevent punching of the piles through the embankment fill creating differential settlement at the surface of the embankment. The arrangement of the piles can create soil arching to carry the load of embankment to the piles. In order to minimize the number of piles geogrid reinforced pile supported construction method is being used on a regular basis. This method consists of one or more layers of geogrid reinforcement placed between the top of the piles and the bottom of the embankment. This paper presents several methods of pile supported geogrid reinforced construction and calculation results from the several methods and comparison of them.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.