• Title/Summary/Keyword: Track Maintenance

Search Result 439, Processing Time 0.025 seconds

A Study on the Criteria of Settlement in Concrete Slabtrack (토노반상 콘크리트궤도의 노반허용침하기준설정에 관한 연구)

  • Hong, Chul-Kee;Yang, Shin-Chu;Kim, Yun-Tae
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.3 s.40
    • /
    • pp.355-364
    • /
    • 2007
  • Recently a concrete slab tracks are being constructed on roadbed in the Gyoeng-bu 2nd phase high speed railways. In respdnding to this trend, new design standards and track materials maintenance systems, based on the slab track material safety and usage perspective, are needed. This research provides a roadbed design criteria and the maintenance system. The proposed roadbed design criteria and the maintenance system are based on the developed analysis meathod of train/slab-track interaction. where the roadbed settlement and train speed are utilized as mediating variables. In the analysis, the dynamic response of train/slab-track interaction apply to various speeds and settlements. the roadbed settlement is shown in a sinusoidal shape of wave, the scope of the settlement occurrence presented in its wavelengths, include 6meters, 10meters, 15merwes, 20meters, 30meters. The train speeds involved are 50, 100, 150, 200, 250, 300, 350, 400kilometers per hour.

Optimal Design of Cement Mortar Pouring type Paved Track (시멘트모르터 충진형 포장제도의 최적 설계)

  • Lee, Il-Wha
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.2 s.33
    • /
    • pp.222-229
    • /
    • 2006
  • Recently, the development of the paved track is required as a low-maintenance of conventional line. The main reason is that the line capacity and bearing of track are increased progressively. The important factors of paved track are stability and applicability. To be based on this subject, Cement Mortar Pouring(CMP) paved track is developed. CMP paved track is a kind of ballast reinforced track using the prepacked concrete technique. The most important thing to design the paved track is to optimize the track structure considering various conditions. Because construction environment is very limited, cost is expensive and it has very complicated behavior. On this paper, structural characteristics of the paved track are investigated using the 3D finite element analysis to verify the optimized structure of the CMP track.

Evaluation of Applicability of Apparent Track Stiffness Measured by Light-Weight Deflectometer as a Ballasted Track Condition Index (소형동평판재하시험기로 측정한 궤도 겉보기 강성의 자갈궤도 상태평가 지표로서의 적용성 고찰)

  • Choi, Yeong-Tae;Hwang, Sung Ho;Jang, Seung Yup;Park, Bongsik;Shim, Gwang Seop
    • Journal of the Korean GEO-environmental Society
    • /
    • v.19 no.2
    • /
    • pp.37-44
    • /
    • 2018
  • Ballasted track has been widely used due to its flexibility. However, the plastic deformation of ballasted track causes the evolution of track geometrical errors, and hence it requires continuous maintenance; increase in number of trains, weight, and speed expedites maintenance frequency and cost as well. Ballast stiffness is well-known as an indicator of design and maintenance. In this regard, this paper aims to suggest the method to measure ballast track stiffness using light-weight deflectometer (LWD) and thus verify its applicability as a maintenance measure. Preliminary field tests determined simple field testing protocol to measure track stiffness. The apparent ballast stiffness by LWD shows good corelation with TQI (Track Quality Index) and maintenance length. That is, as average of apparent stiffness increase, TQI and tamping length decrease exponentially. Therefore, apparent stiffness can be used as an index for ballast condition assessment.

Research of the Turnout Maintenance Training System using Mixed Reality (혼합현실을 이용한 분기기 유지보수 교육시스템 연구)

  • Song, Yong-Soo;Kim, Yong-Kyu;Shin, Duck-Ho;Chang, Sang-Hoon
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1511-1516
    • /
    • 2011
  • The maintenance of the turnout is composed of signal field and track field on business, the electrical and mechanical field on system. adjustment and maintenance carry forward through coordination with these fields. In the case of turnout equipment used in a first phase of Seoul-Busan high-speed train, it is treated by classifying as mechanical adjustments and electrical adjustments. Mechanical adjustment is conducted with focus on fine adjustment to meet maintenance standards limits(1mm or less) about interval of basic rail and tongue rail about each part of track transition equipment. This refers to mechanical adjustments performed mainly with physical changes and movement characteristics between basic rail and tongue rail by considering the overall environment surrounding track side of section installed track transition equipment. However, these series of maintenance are conducted in state that high-speed train is not in the process from 1 am to 4 am at night, but common workers for maintenance are not familiar with the operation and checking about various situation, and the workers are even insufficient. Maintenance training using mixed reality is conducted in the place of business, we tried to overcome several problems of safety and time reduction through this training.

  • PDF

Estimation of Line Utilization Rate and Track Maintenance Time of Conventional Railway (일반철도의 선로이용율과 선로 유지보수시간 추정)

  • Ki, Hyungseo;Park, Dongjoo;Kim, Dongsoo;Kim, Haengbae
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.6
    • /
    • pp.638-644
    • /
    • 2012
  • In this study, we numerically estimated available and unavailable time of conventional railway by examining 60% which is known as average range of track utilization efficiency. We also estimated track repair time for maintenance which is the main factor of making track utilization change and analyzed appropriate estimated time. The railway's safety should be guaranteed by appropriate railway operating plan and by adequate rail facilities maintenance. At the same time, daily railway train 'Dia's recovery power should be reflected to the management plan. Considering these factors, we examined mechanical equipment and the national rail network in order to rationally estimate track repair time of the maintenance and to secure spare time in case of train delays. It was found that track utilization efficiency was more or less 60%.

The Reduction of Structure-borne Noise in an Elevated Station(Changdong Station) of Seoul Metro Line No. $1\sim4$ (서울메트로 $1\sim4$호선 고가역(창동역) 고체소음 저감 사례)

  • Kong, Sun-Yong;Oh, Hee-Wan;Kim, Sang-Jin
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.438-443
    • /
    • 2007
  • In the recent railway construction, the concrete slab track is highlighted as the maintenance-free track and the main stream is moving from ballasted track to concrete slab track. However, in spite of many merits of concrete slab track, the higher noise generated from the concrete slab track is a troublesome question to solve and, by this reason, many studies on noise reduction of concrete slab track are carried out. The railway noise can be classified into the reflection noise emitted from wheel/rail contact and the structure-borne noise transmitted through railway structures. In this presentation, we would like to introduce an example of the successful reduction of structure-borne noise at track retrofitting to maintenance-free concrete slab track in elevated Changdong Station which was built with ballasted track on Rahmen structure.

  • PDF

A Study of Analysis Method for the Track Geometry Measuring Data on High Speed Railway (고속철도 궤도검측 자료 분석기법에 관한 연구)

  • 강기동
    • Journal of the Korean Society for Railway
    • /
    • v.7 no.4
    • /
    • pp.291-295
    • /
    • 2004
  • The Track geometry measuring on High-speed railway is the most important subject for the track construction and track maintenance work. Also the measuring accuracy is so significant part because it provides principle data for the maintenance plan and the assesment of working quality and can control the train speed limitation. From this point of view, it is very important to verify for the track recording coach(EM120) in KNR. According to the result of spectrum analysis, the noise near 1m waveband was found on the track recording data from EM120. So, New filter has been applied to remove the noise form track recording data. and it makes possible to acquire resembling result to real track geometry.

Parametric Study on Track Deterioration by Various Track Type of Serviced Line (운행선 궤도형식별 궤도열화에 미치는 매개변수 연구)

  • Choi, Jung-Youl;Park, Jong-Yoon;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.8 no.3
    • /
    • pp.239-244
    • /
    • 2022
  • In this study, the key parameters affecting the deterioration of each track type were derived based on field inspections and laboratory tests. The existing track deterioration model was limited to the ballasted tracks, and the deterioration evaluation of concrete tracks was insufficient. In this study, the laboratory test was performed to evaluate the performance and condition of track components to derive the deterioration factors reflecting the characteristics of various track structures. In addition, through analysis of track maintenance history data, parameters affecting track deterioration and maintenance were derived. The key parameters for presenting a track deterioration model based on the track performance of ballasted and concrete tracks through field inspection, track maintenance history data analysis, and performance test of track components using on-site specimens were identified as track support stiffness, Ballast gravel, track settlement and Resilience pad were presented.

Railway Track Maintenance Scheduling using Artificial Bee Colony and Harmony Search

  • Kim, Ki-Dong;Kim, Sung-Soo;Nam, Duk-Hee;Jeong, Hanil
    • Journal of Sensor Science and Technology
    • /
    • v.25 no.2
    • /
    • pp.91-102
    • /
    • 2016
  • The objective of this paper is to propose a heuristic algorithm to optimize the railway track maintenance scheduling, a NP-hard problem, by reflecting conditions of the actual field more quickly and easily. We develop the mechanism based on Binary Artificial Bee Colony (BABC) and Binary Harmony Search (BHS), and verify their performance through simulation experiments. Our proposed BABC and BHS mechanisms were applied to problems composed of 30, 60, 100, and 200 operations for railway track maintenance scheduling to carry out experiments and analysis. On comparing it with the results solved by CPLEX, it is found that the mechanism could present an optimal solution within limited time by user.

Railway Track Maintenance Scheduling using Artificial Bee Colony (Artificial Bee Colony 기법을 이용한 철도궤도 유지보수 일정계획 수립 연구)

  • Nam, Duk-Hee;Kim, Ki-Dong;Lee, Sung-Uk;Kim, Sung-Soo
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.6
    • /
    • pp.601-607
    • /
    • 2010
  • The objective of this paper is to propose a fast and easy Binary Artificial Bee Colony (BABC) heuristic algorithm to optimize NP-hard scheduling problem of railway track maintenance considering real conditions. The optimal or best solutions can be found using proposed BABC within very short or user specified computation time. We can greatly maximize the objective value using this proposed method in 30, 60, 100 and 200 work size railway track maintenance scheduling problems for experiment and analysis.