• Title/Summary/Keyword: Total project cost management

Search Result 209, Processing Time 0.027 seconds

FLEXIBLE OPTIMIZATION MODEL FOR LINEAR SCHEDULING PROBLEMS

  • Shu-Shun Liu;Chang-Jung Wang
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.802-807
    • /
    • 2005
  • For linear projects, it has long been known that resource utilization is important in improving work efficiency. However, most existing scheduling techniques cannot satisfy the need for solving such issues. This paper presents an optimization model for solving linear scheduling problems involving resource assignment tasks. The proposed model adopts constraint programming (CP) as the searching algorithm for model formulation, and the proposed model is designed to optimize project total cost. Additionally, the concept of outsourcing resources is introduced here to improve project performance.

  • PDF

ICT IMPLEMENTATION FOR MATERIALS MANAGEMENT IN CONSTRUCTION PROJECTS

  • N.B. Kasim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.195-200
    • /
    • 2011
  • Construction materials usually constitute a major portion of the total cost in a building construction project. Despite the potential benefit of ICT, convincing construction organisations to embrace its use and implementation has proved a difficult task. This study seeks to identify the implementation of ICT for materials management processes in construction projects. The findings from the interviews reveal that the implementation of ICT in the materials management processes for construction projects in Malaysia is at early stage. Microsoft Excel Spreadsheet and handheld devices are found to be the common ICT tools adopted in the materials management processes. The main barrier is found to be the cost involvement at the initial stage or overall implementation of ICT in the materials management processes. Finally, this paper concludes the finding from interviews towards the ICT implementation of materials management in the construction projects.

  • PDF

Time-Profit Trade-Off of Construction Projects Under Extreme Weather Conditions

  • Senouci, Ahmed;Mubarak, Saleh
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.4
    • /
    • pp.33-40
    • /
    • 2014
  • Maximizing the profitability and minimizing the duration of construction projects in extreme weather regions is a challenging objective that is essential for project success. An optimization model is presented herein for the time-profit trade-off analysis of construction projects under extreme weather conditions. The model generates optimal/near optimal schedules that maximize profit and minimize the duration of construction projects in extreme weather regions. The computations in the model are organized into: (1) a scheduling module that develops practical schedules for construction projects, (2) a profit module that computes project costs (direct, indirect, and total) and project profit, and (3) a multi-objective module that determines optimal/near optimal trade-offs between project duration and profit. One example is used to show the impact of extreme weather on construction time and profit. Another example is used to show the model's ability to generate optimal trade-offs between the time and profit of construction projects under extreme weather conditions.

A Study on Optimal Lead Time Selection Measures of the Construction Materials (건설자재의 적정 리드타임 산정에 관한 연구)

  • Lee, Sang-Beom
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.1
    • /
    • pp.105-110
    • /
    • 2004
  • Resource procurement is an important management area because cost of resource covers 40% of total construction project cost and resource delivery has direct relationship with project performance. Integration of cost provides various potentials for effective and efficient project control. This study investigates the usefulness of time in resource procurement management focused on materials. These days, construction projects have characterized manufacture because of industrialization and component. Therefore, application of systematic resource planning has been requested in the construction. There are many companies conducting procurement of resource on the web by applying MRP, ERP etc. in the construction. However, in applying them in the construction yet, there is obstruction. MRP has the character doing its function under accurate cost prediction of resource. But prediction of resource is difficult in industry mechanism of the construction. If accurate cost prediction of resource is possible in the construction, it will be expected to reduce cost of procurement of resource substantially by applying successful resource planning model in the manufacture. On the basis of recent current, the purpose of study is to present procurement of resource system that period observance of construction and minimization of stock is possible by reflecting accurate lead-time to apply proactive thought to be able to cope with alteration of construction schedule efficiently in analyzing resource planning of the construction site.

Development of the Model for Total Quality Management and Cost of Quality using Activity Based Costing in the Hospital (병원의 활동기준원가를 이용한 총체적 질관리 모형 및 질비용 산출 모형 개발)

  • 조우현;전기홍;이해종;박은철;김병조;김보경;이상규
    • Health Policy and Management
    • /
    • v.11 no.2
    • /
    • pp.141-168
    • /
    • 2001
  • Healthcare service organizations can apply the cost of quality(COQ) model as a method to evaluate a service quality improvement project such as Total Quality Management (TQM). COQ model has been used to quantify and evaluate the efficiency and effectiveness of TQM project through estimation between cost and benefit in intervention for a quality Improvement to provide satisfied services for a customer, and to identify a non value added process. For estimating cost of quality, We used activities and activity costs based on Activity Based Costing(ABC) system. These procedures let the researchers know whether the process is value-added by each activity, and identify a process to require improvement in TQM project. Through the series of procedures, health care organizations are service organizations can identify a problem in their quality improvement programs, solve the problem, and improve their quality of care for their costumers with optimized cost. The study subject was a quality improvement program of the department of radiology department in a hospital with n bed sizes in Metropolitan Statistical Area (MSA). The principal source of data for developing the COQ model was total cases of retaking shots for diagnoses during five months period from December of the 1998 to April of the 1999 in the department. First of the procedures, for estimating activity based cost of the department of diagnostic radiology, the researchers analyzed total department health insurance claims to identify activities and activity costs using one year period health insurance claims from September of the 1998 to August of the 1999. COQ model in this study applied Simpson & Multher's COQ(SM's COQ) model, and SM's COQ model divided cost of quality into failure cost with external and internal failure cost, and evaluation/prevention cost. The researchers identified contents for cost of quality, defined activities and activity costs for each content with the SM's COQ model, and finally made the formula for estimating activity costs relating to implementing service quality improvement program. The results from the formula for estimating cost of quality were following: 1. The reasons for retaking shots were largely classified into technique, appliances, patients, quality management, non-appliances, doctors, and unclassified. These classifications by reasons were allocated into each office doing re-taking shots. Therefore, total retaking shots categorized by reasons and offices, the researchers identified internal and external failure costs based on these categories. 2. The researchers have developed cost of quality (COQ) model, identified activities by content for cost of quality, assessed activity driving factors and activity contribution rate, and calculated total cost by each content for cost for quality, except for activity cost. 3. According to estimation of cost of quality for retaking shots in department of diagnostic radiology, the failure cost was ₩35,880, evaluation/preventive cost was ₩72,521, two times as much as failure cost. The proportion between internal failure cost and external failure cost in failure cost is similar. The study cannot identify trends on input cost and quality improving in cost of qualify over the time, because the study employs cross-sectional design. Even with this limitation, results of this study are much meaningful. This study shows possibility to evaluate value on the process of TQM subjects using activities and activity costs by ABC system, and this study can objectively evaluate quality improvement program through quantitative comparing input costs with marginal benefits in quality improvement.

  • PDF

A Study on the Estimation of Software Development Cost of IT Projects in Public Sector (공공부문 정보화사업의 소프트웨어 개발비용 예측에 관한 연구)

  • 박찬규;구자환;김성희;신수정;송병선
    • Korean Management Science Review
    • /
    • v.19 no.2
    • /
    • pp.191-204
    • /
    • 2002
  • As the portion of information systems (IS) budget to the total government budget becomes greater, the cost estimation of IS development and maintenance projects is recognized as one of the most important problems to be resolved for scientific and efficient management of IS budget. Since IS budget makes much effect on the delivery time, quality and productivity of IS projects, the exact cost estimation is also necessary for the successful accomplishment of IS projects. The primary concern in the cost estimation of IS projects is software cost estimation, which requires the measurement of the size of softwares. There are two methods for sizing software : line-of-code approach, function point model. In this paper, we propose a function-point-based model for estimating software cost. The proposed model is derived by collecting about fifty domestic IT projects in public sector and analyzing their relationship between cost drivers and development effort. Since the proposed model is developed by simplifying the function point model that can be used only when detailed user requirements are specified, it can be also applied at project planning and budgeting phase.

A Study on the Construction of Computerized Algorithm for Proper Construction Cost Estimation Method by Historical Data Analysis (실적자료 분석에 의한 적정 공사비 산정방법의 전산화 알고리즘 구축에 관한 연구)

  • Chun Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.192-200
    • /
    • 2003
  • The object of this research is to develop a computerized algorithm of cost estimation method to forecast the total construction cost in the bidding stage by the historical and elemental work cost data. Traditional cost models to prepare Bill of Quantities in the korea construction industry since 1970 are not helpful to forecast the project total cost in the bidding stage because the BOQ is always constant data according to the design factors of a particular project. On the contrary, statistical models can provide cost quicker and more reliable than traditional ones if the collected cost data are sufficient enough to analyze the trends of the variables. The estimation system considers non-deterministic methods which referred to as the 'Monte Carlo simulation. The method interprets cost data to generate a probabilistic distribution for total costs from the deficient elemental experience cost distribution.

A Study on the Estimation of the Contingency by the Regression Analysis on the Apartment (회귀분석을 통한 공동주택 공사예비비 산정에 관한 연구)

  • Lee Man-Hee;Lee Hak-ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.226-229
    • /
    • 2003
  • Construction manager must consider the possibility on the failure of the project in advance and the contingency to provide against the situation, those of which is a dangerous condition not to predict. If they have a quick decision without understanding the contingency, the over-cost in the total cost would be continuously accumulated, and be a barrier at a project going in progress. A various risk could not be coped with at a time to decide either going or sloping the project until the contingency is applied from the first step to progress the project. But a case to apply the contingency to the construction for the investment or the analysis of the project is a little. The process to evaluate it is also absent. The propose of this paper is the followed ; To establish the total cost including the risk first of all, devide into plus or minus factor of the cost, and then the process to calculate the contingency must be suggested by the regression analysis.

  • PDF

Quantitative Project Management Using Comparison of CMMI and PMBOK (CMMI와 PMBOK의 비교 분석을 통한 정량적 프로젝트 관리)

  • Kim Kyong H.;Kim Heung J.;Park Young B.
    • The KIPS Transactions:PartD
    • /
    • v.12D no.4 s.100
    • /
    • pp.601-608
    • /
    • 2005
  • It is very important to improve qualify, cost and the necessary period for production in software development project. In order to improve software quality, cost and period, final product as well as a project planning and process itself are concerned. In CMMI of SEI and ISO/IEC 15504 (SPICE), the process for the project management is specified. Recently, as a method of total management - including man power, budget, and schedule - PMBOK is introduced. The detailed and specific management method in PMBOK results in multiple experiments that apply PMBOK to enterprise environment. In this paper, hybrid method of CMMI and PMBOK is proposed to obey CMMI, at the same time, to apply the detailed and specific management method in PMBOK and develop metrics for the method.

The problem of using BIM data for facility management (시설물 유지관리를 위한 BIM데이터 전달의 문제점)

  • An, Hyo-Kyung;Lee, Seul-Ki;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.139-140
    • /
    • 2012
  • Facility Management (FM) is a project phase to maintenance and to increase the qualities of product which is planned on the design phase and ensured on the construction phase. In addition, since the approximate time occupied in operation and maintenance phase is the longest from construction project as total approximate cost is about 85% of whole the project, it could be managed and realized primarily. The information of facility is not created on the specific point of project, but it might be created on the whole process of subject project widely. Thus, as the information could not be lost and it can be delivered into computer aided facility management system, it is necessary to manage the facility information. This paper proposed the necessities and the problems of BIM-based data interoperability on the Korean construction projects.

  • PDF