• 제목/요약/키워드: Total estimation

검색결과 2,461건 처리시간 0.029초

A Bhattacharyya Analogue for Median-unbiased Estimation

  • Sung, Nae-Kyung
    • Communications for Statistical Applications and Methods
    • /
    • 제11권1호
    • /
    • pp.13-20
    • /
    • 2004
  • A more general version of diffusivity based on total variation of density is defined and an information inequality for median-unbiased estimation is presented. The resulting information inequality can be interpreted as an analogue of the Bhattacharyya system of lower bounds for mean-unbiased estimation. A condition on which the information bound is achieved is also given.

The Social Analysis on the Age Estimation of Living Body in Jeollabuk-Do

  • Jung, Won;Suh, Bong-Jik
    • Journal of Oral Medicine and Pain
    • /
    • 제43권4호
    • /
    • pp.118-124
    • /
    • 2018
  • Purpose: Age estimation is often used in the identification of living persons. Various methods are used for age estimation using teeth, and there are many studies on the methodology. But the study of changes in the social aspects of age estimation with the passage of times is still insufficient. Therefore, the purpose of this study is to analyze the age estimation cases in the social aspects and to investigate the changes of age estimation cases in Jeollabuk-do. Methods: From January 2008 to December 2015, 76 cases of age estimation were collected. The collected data were organized and analyzed. The distribution of patients by age and year, the difference between alleged and registered age, the purpose of age estimation, and regional distribution were examined. In addition, we compared the previous study which analyzed the age estimation cases in Jeollabuk-do from 2000 to 2007. Results: According to the distribution by age, the age distribution was the largest in the 50s and 60s, with 69.8%. The most reason to correct age was related to welfare benefits (38.2%), and most of the people who corrected for welfare benefits were over 50 years old. The age correction for purpose of welfare benefits existed every year during the study period. As the result of comparison with previous study, total number of age estimation cases was decreased very sharply, and distribution by age group was also changed. Conclusions: Changes in age estimation cases were observed when compared to the previous study. A significant decrease in the total number of age estimation cases was observed, but the number of age estimation in the 50s did not decrease. Although the total number of age estimation requests decreases, age estimation in the elderly are likely to persist. Thus, it is necessary to study new age estimation methods suitable for the elderly.

A Modified Computing Algorithm for Raking Ratio Estimation Subject to Partial Marginal Information

  • Son, Chang Kyoon
    • Communications for Statistical Applications and Methods
    • /
    • 제11권2호
    • /
    • pp.419-433
    • /
    • 2004
  • We suggest the modified computing algorithm for raking ratio estimation under the assumption that the population total is partially known, and the sample total is completely known about survey variable in contingency table. We show that the proposed estimation procedure is useful to estimate the population cell count in this situation through an empirical study.

THE CALIBRATED VARIANCE ESTIMATOR UNDER THE UNIT NONRESPONSE

  • Son, Chang-Kyoon;Hong, Ki-Hak;Lee, Gi-Sung
    • Journal of applied mathematics & informatics
    • /
    • 제8권3호
    • /
    • pp.975-987
    • /
    • 2001
  • We treat the problem of variance estimation for the estimator of population total, which is derived from the calibration estimation procedure corresponding to the levels of auxiliary information under nonresponse situation. We develop the calibrated variance estimation procedure using the fact that the population total and variance as well as the sample total and variance of the auxiliary variable are known. We show that the proposed variance estimation procedure improves the $Lundst\ddot{o}rm$ and $S\ddot{a}rndal's$ (1999) procedure with respect to the variance and nonresponse bias reduction through the simulation study.

시간지연추정제어기에 관한 리뷰 (Review on controllers with a time delay estimation)

  • 이효직;윤지섭
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 2005년도 춘계학술대회 논문집
    • /
    • pp.1120-1124
    • /
    • 2005
  • We reviewed controllers with a time delay estimation in this paper. Time delay control (TDC) and sliding mode control (SMC) are well known robust control schemes. Basically, the TDC has a main characteristic called a time delay estimation from which we can estimate the total uncertainty of a system. . The TDC causes the stick-slip in the case of systems with a friction. The so-called TDCSA which are short for TDC with switching action was developed to reduce the stick-slip. The TDC has the additional switching action term in the TDC structure. In the other hand, the SMC dose not have a time delay estimation but instead it can estimate the system uncertainty through the switching action. The SMC has a difficulty to estimate the total uncertainty of a system because it does not have a time delay estimation. In order to solve the difficulty, some control schemes were developed. Among them, we need to focus our attention on two control schemes: SMCPE and SMCTE, which are short for sliding mode control with a perturbation estimation and sliding mode control with a time delay estimation, respectively. In this paper, we analyzed and compared the characteristic of above three controllers. Even though the motives for the development of three control schemes are different, three control schemes have much in common in terms of their controller structures.

  • PDF

의료의 공급량과 병상이용량과의 관계에 관한 국제비교연구 (Relationship Between Supply Factors of Medical Care and Use of Bed)

  • 정형선
    • 보건행정학회지
    • /
    • 제5권2호
    • /
    • pp.18-34
    • /
    • 1995
  • To clarify the relationship between the medical supply(medical persons and goods) and the use of bed, the author has made comparison among OECD 24 countries. Per Capita Bed-days can be divided into Average Length of Stay and Admission Rate, and these three variables were regressed upon both In-patient Care Beds of all medical institutions including acute somatic, psychiatric, special, nursing homes and other long-term care and Share of Total Health Employment in Total Employment. The result of regression analysis shows a statistically significant positive relationship between In-patient Care Beds and Average Length of Stay, and negative relationship between Share of Total Health Employment and Admission Rate. In addition to Ordinary Least Square(OLS) estimation, amended Bounded Influence Estimation(BIE) was also made to adjust the influence of outliers. Japan shows a very large number of In-patient Care Beds and a very low Share of Total Health Employment, and this medical situation is judged to have close relation to her long Average Length of Stay and low Admission Rate.

  • PDF

A Coupled Recursive Total Least Squares-Based Online Parameter Estimation for PMSM

  • Wang, Yangding;Xu, Shen;Huang, Hai;Guo, Yiping;Jin, Hai
    • Journal of Electrical Engineering and Technology
    • /
    • 제13권6호
    • /
    • pp.2344-2353
    • /
    • 2018
  • A coupled recursive total least squares (CRTLS) algorithm is proposed for parameter estimation of permanent magnet synchronous machines (PMSMs). TLS considers the errors of both input variables and output ones, and thus achieves more accurate estimates than standard least squares method does. The proposed algorithm consists of two recursive total least squares (RTLS) algorithms for the d-axis subsystem and q-axis subsystem respectively. The incremental singular value decomposition (SVD) for the RTLS obtained by an approximate calculation with less computation. The performance of the CRTLS is demonstrated by simulation and experimental results.

BIM기반 물량 및 내역정보 생성을 위한 내역서 개선방안 (Improvement of BoQ Documents for the BIM based Quantity Takeoff)

  • 안지원;윤석헌
    • 한국BIM학회 논문집
    • /
    • 제7권2호
    • /
    • pp.16-24
    • /
    • 2017
  • It is very important to estimate accurate construction total cost needed early in the project. In the initial phase of the design, the project cost estimates are determined by total quantity from design documents and the variables that affect the calculation of the total cost of the project. In order to determine accurate total construction cost, the contractor has to produce detailed quantity information based on the drawings and specifications. The process of preparing quantification and cost estimation documents is still being worked out manually, and a lot of errors have been occurred in many cases. Recent advances in information technology have led to the BIM based quantity takeoff and cost estimation. However, there are some limits to the extent to which the current specifications for BoQ documents are computed from BIM model. This research analyze the current BoQ cases and analyze how to make quantity takeoff possible through BIM. The study defined five levels of quantity category that could be produced by BIM. Only about 40% or indirectly usable items can be used when information is extracted to BIM modelling. This is very insufficient to fill out the BoQ. The BoQ document structure quantity takeoff specifications should be simplified in order to BIM based cost estimation more efficiently.

인공심장의 비선형 혈류 역학 변수 예측에 관한 연구 (A Study on the Practical Estimation of Nonlinear Hemodynamic Variables for the Moving-Actuator type Total Artificial Heart)

  • 엄경식;안재목
    • 대한의용생체공학회:의공학회지
    • /
    • 제19권2호
    • /
    • pp.153-162
    • /
    • 1998
  • 인공 심장의 연구에 있어서 혈류 역학 변수의 추정은 두말할 필요도 없이 매우 중요하다. 그러나 이 중요도에 견주어 볼지라도 실세계에 적용될 수 있는 연구 결과는 희박하다. 본 논문에서는 이동 작동기형 완전 인공 심장을 위한 혈류 역학 변수 추정 문제가 연구되었다. 추정 방법론으로서 다차원 선형 보간 기법을 이용하였다. 모의 순환 장치의 실험으로 제안된 방법을 검증하였으며 좋은 성능을 보였다.

  • PDF

R&D프로젝트군의 우선순위 결정을 위한 비용 - 상호효과 통합평가시스템 (A Evaluation System Integrating Cost-Cross Effects of Big Scale R&D Projects)

  • 권철신;이순천;박준호
    • 한국경영과학회지
    • /
    • 제32권2호
    • /
    • pp.163-175
    • /
    • 2007
  • [ $ulcorner$ ]Cost-Effectiveness Analysis$\lrcorner$ has been wifely used to evaluate economic efficiency of R&D projects, but most of cost-effectiveness evaluation systems have some problems such as systematic method for setting and evaluating cost factors, estimation of single effect on each R&D project, and estimation of cross effects among R&D projects. To solve these problems, we have designed a new evaluation indicator called a $ulcorner$Cost-Cross Effect Integration Indicator$lrcorner$ including cross effects developed in this research. The major research findings are summarized as follows : (1) $ulcorner$Coist Estimation Model$lrcorner$, which estimates the cost factors divided into two classes of assembly product and system product and then integrates the total cost values, has been designed. (2) A new method for estimating parameters of cross effects among R&D projects has been developed. (3) $ulcorner$Cross Effects Estimation Model$lrcorner$ to estimate multi-effects and cross effects by completion time among several projects has been designed. (4) $ulcorner$Integration Estimation Indicator$lrcorner$ for setting priority on a project group has been extracted by combination of total cost value and total effect value.