• Title/Summary/Keyword: Total Water Pollution Load Management System

Search Result 69, Processing Time 0.026 seconds

Evaluation and Application of CLUE-S Model for Spatio-Temporal Analysis of Future Land use Change in Total Water Pollution Load Management System (오염총량관리제의 시공간적 미래 토지이용 변화분석을 위한 CLUE-S 모델의 적용 및 평가)

  • Ryu, Jichul;Ahn, Ki Hong;Han, Mideok;Hwang, Hasun;Choi, Jaewan;Kim, Yong Seok;Lim, Kyoung Jae
    • Journal of Korean Society on Water Environment
    • /
    • v.30 no.4
    • /
    • pp.418-428
    • /
    • 2014
  • The purpose of this study is to predict the spatio-temporal changes in land uses and to evaluate land-based pollutant loads in the future under Total Water Pollution Load Management System using CLUE-S model. For these ends, sensitive parameters of conversion elasticities in CLUE-S model were calibrated and these calibrated parameters of conversion elasticities, level II land cover map of year 2009, and 7 driving factors of land use changes were used in predicting future land uses in 2002 with two scenarios(Scenario 1: non area restriction, Scenario 2: area restriction). This projected land use map of 2020 was used to estimate land-based pollutant loads. It was expected that urban areas will increase in 2020 from both scenarios 1 and 2. In Scenario 1, urban areas are expected to increase within greenbelt areas and deforest would be expected. Under Scenario 2, these phenomena were not expected. Also the results of estimation of BOD and TP pollutant loads, the BOD difference between scenarios 1 and 2 was 719 kg/day in urban areas and TP difference was 17.60 kg/day in urban areas. As shown in this study, it was found that the CLUE-S model can be useful in future pollutant load estimations because of its capability of projecting future land uses considering various socio-economic driving factors and area-restriction factors, compared with conventionally used land use prediction model.

A Study on the Total Pollutant Load Management of Masan Bay Using GIS Technique (GIS 기법을 이용한 마산만 오염총량관리에 관한 연구)

  • Cho, Bo-Hyun;Yang, Keum-Chul
    • Journal of Wetlands Research
    • /
    • v.14 no.1
    • /
    • pp.89-99
    • /
    • 2012
  • This study aims to develop the Masan bay special management system of the point and nonpoint sources of pollution using GIS as part of the Integrated Management System of the Masan Bay Special Management Area and utilize Total Pollution Loads Management System in Masan Bay more systematically and scientifically. The result of the pollution sources management at the Masan bay in conjunction with GIS was made possible the comparison of the source of pollution and the pollutant load among each administration area. It also developed Arc-GIS watershed management program which enables to estimate the population for discharge facilities, the water use of domestic population and commercial population, and pollutant load and discharge load of COD, TN and TP by the administration areas, years, and usages. In addition, this study anticipated minimizing temporal, economical efforts in utilizing large amounts of property and space utilization data and expediting the decision making process of policies in relation to the systematic and effective management system of pollutant loads at the Masan bay area. Further studies are required to plan the systematic management of the point and nonpoint sources of pollution and complement the watershed management system using GIS program for pollutant load which enables to predict the current and future state of point and nonpoint sources.

Applicability Analysis of the HSPF Model for the Management of Total Pollution Load Control at Tributaries (지류총량관리를 위한 HSPF 모형의 적용성 분석)

  • Song, Chul Min;Kim, Jung Soo;Lee, Min Sung;Kim, Seo Jun;Shin, Hyung Seob
    • Ecology and Resilient Infrastructure
    • /
    • v.9 no.1
    • /
    • pp.1-14
    • /
    • 2022
  • The total maximum daily load (TMDL) implemented in Korea mainly manages the mainstream considering a single common pollutant and river discharge, and the river system is divided into unit watersheds. Changes in the water quality of managed rivers owing to the water quality management in tributaries and unit watersheds are not considered when implementing the TMDL. In addition, it is difficult to consider the difference in the load of pollutants generated in the tributary depending on the conditions of the water quality change in each unit watershed, even if the target water quality was maintained in the managed water system. Therefore, it is necessary to introduce the total maximum load management at tributaries to manage the pollution load of tributaries with a high degree of pollution. In this study, the HSPF model, a watershed runoff model, was applied to the target areas consisting of 53 sub-watersheds to analyze the effect of water quality changes the in tributaries on the mainstream. Sub-watersheds were selected from the three major areas of the Paldang water system, including the drainage basins of the downstream of the South Han-River, Gyeongan stream, and North Han-River. As a result, BOD ranged from 0.17 mg/L to 4.30 mg/L, and was generally high in tributaries and decreased in the downstream watershed. TP ranged from 0.02 mg/L - 0.22 mg/L, and the watersheds that had a large impact on urbanization and livestock industry were high, and the North Han-River basin was generally low. In addition, a pollution source reduction scenario was selected to analyze the change in water quality by the amount of pollution load discharged at each unit watershed. The reduction rate of BOD and TP according to the scenario changes was simulated higher in the watershed of the downstream of the North Han-River and downstream and midstream of the Gyeongan stream. It was found that the benefits of water quality reduction from each sub-watershed efforts to improve water quality are greatest in the middle and downstream of each main stream, and it is judged that it can be served as basic data for the management of total tributaries.

Development of Long Term Flow Duration Curves in 4 River Basins for the Management of Total Maximum Daily Loads (수질오염총량관리를 위한 4대강수계 장기유황곡선 작성방안)

  • Park, Jun Dae;Oh, Seung Young
    • Journal of Korean Society on Water Environment
    • /
    • v.29 no.3
    • /
    • pp.343-353
    • /
    • 2013
  • Flow duration curve (FDC) can be developed by linking the daily flow data of stream flow monitoring network to 8-day interval flow data of the unit watersheds for the management of Total Maximum Daily Loads. This study investigated the applicable method for the development of long term FDC with the selection of the stream flow reference sites, and suggested the development of the FDC in 4 river basins. Out of 142 unit watersheds in 4 river basins, 107 unit watersheds were shown to estimate daily flow data for the unit watersheds from 2006 to 2010. Short term FDC could be developed in 64 unit watersheds (45%) and long term FDC in 43 unit watersheds (30%), while other 35 unit watersheds (25%) were revealed to have difficulties in the development of FDC itself. Limits in the development of the long term FDC includes no stream monitoring sites in certain unit watersheds, short duration of stream flow data set and missing data by abnormal water level measurements on the stream flow monitoring sites. To improve these limits, it is necessary to install new monitoring sites in the required areas, to keep up continuous monitoring and make normal water level observations on the stream flow monitoring sites, and to build up a special management system to enhance data reliability. The development of long term FDC for the unit watersheds can be established appropriately with the normal and durable measurement on the selected reference sites in the stream flow monitoring network.

Forecasting of changes in the water quality in Sapgyo-Lake in accordance with implementation of Total Water Pollutant Load Management System (수질오염총량관리제 시행에 따른 삽교호의 수질변화 예측)

  • Kim, Hongsu;Cho, Byunguk;Park, Sanghyun;Lee, Mukyu;Kim, Changgi;Choi, Jeongho
    • Journal of Korean Society on Water Environment
    • /
    • v.35 no.3
    • /
    • pp.209-223
    • /
    • 2019
  • Broadly speaking, in order to analyze the water quality improvement effects of the implementation of the Total Water Pollutant Management System in the Sapgy-Lake waterways, a reference was made to the [Plans for implementation of the Total Maximum Daily Load(TMDL)] in 3 cities (Cheonan, Asan, Dangjin). The results of the investigation into the plans to reduce the pollutant load show in that region show that there are plans to reduce pollution for a total of 16 reduction facilities. As for the result of the computation of the reduction in the load, these measurements were computed at the Gokgyo-stream basin and Namwon-stream basin, with BOD and T-P at the Gokgyo-stream basin reduced by 13.9 % and 13.3 %, respectively, while BOD and T-P at the Namwon-stream were reduced by 3.7 % and 3.3 %, respectively. In this way, thus using the results of the water quality forecast of Sapgyo-Lake in measures for the improvement of water quality (in accordance with the implementation of the TMDL), and using the QUAL-MEV model and EFDC model, it is noted that BOD will be improved by 26.4 % from 6.1 mg/L to 4.5 mg/L 0.0 %, T-P by 36.7 % from 0.168 mg/L to 0.107 mg/L and TOC by 26.4 % from 7.7 mg/L to 5.6 mg/L. However, it is forecasted that the targeted standards for the medium influence area will not be achieved. Evidently, Gokgyo-stream and Namwon-stream have been implementing the Total Water Pollutant Management System for the BOD items since January 1, 2019, but the Sapgyo-stream and Muhan-stream were excluded from being designated as subject regions. As such, it is noted now that it is necessary to implement the TMDL for the entire Sapgyo-Lake water systems including Sapgyo-stream and Muhan-stream in order to improve the water quality of Sapgyo-Lake, and likewise the T-P should be designated as the substance subjected to management in addition to BOD.

Performance Appraisal of Total Maximum Daily Loads: Performance on Development/Reduction Plan and Water Quality Status of Unit Watershed (수질오염총량관리제의 성과평가: 개발/삭감계획의 이행실적 및 단위유역의 수질 현황)

  • Park, Jae Hong;Park, Jun Dae;Rhew, Doug Hee;Jung, Dong Il
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.4
    • /
    • pp.481-493
    • /
    • 2009
  • This study was conducted to performance appraisal of Total Maximum Daily Loads (TMDLs), especially in terms of performance on development & reduction plan and water quality status of unit watershed. Because load allocations for pollution sources were predicted redundantly by uncertainty of prediction, TMDLs master plan has been frequently changed to acquire load allocation for local development. Therefore, It need to be developed more resonable prediction techniques of water pollution sources to preventing the frequent change. It is suggested that the reduction amount have to be distributed properly during the planning period. In other words, it has not to be concentrated on the specific year (especially final year of the planning period). The reason why, if the reduction amount concentrate on the final year of the planning period, allotment loading amount could not be achieved in some cases (e.g., insufficiency of budget, extension of construction duration). If the development plan was developed including uncertain developments, it is necessary to be developed reduction plan considered with them. However, some of the plans in the reduction plan could not be accomplished in some case. Because, it is not considered financial abilities of local governments. Consequently, development plan must be accomplished to avoid uncertain developments, and to consider financial assistance to support the implementation of effective plan. Water quality has been improved in many unit watersheds due to the TMDLs, especially in geum river and yeongsang/seomjin river.

Characteristics of Water Quality Change of Urban River according to Installation of Interceptors and Wastewater Treatment Plant (차집관로와 하수처리시설의 설치에 따른 도시하천의 수질변화 특성)

  • Zhou, Juan Juan;Lim, Bong Su
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.36 no.12
    • /
    • pp.813-820
    • /
    • 2014
  • In this study, the characteristics of water quality change of the three streams in Daejeon were analyzed according to the expanded installation of interceptors and wastewater treatment plant (WTP). Gabcheon 5 (Singu Bridge) location showed the maximum difference of the highest and lowest concentrations in the last decade. However, the recent water quality of this location was worse than other locations, because of the impact of the effluent from the WTP. In the upstream of the WTP, the Daejeon stream was relatively better than the other locations in organic pollution reduction, and this was caused by the investment for the management of the interceptors in three streams of Daejeon. According to the water quality standard of the stream water quality, the recent water quality of the three streams in Daejeon was acceptable within them in the most of the water quality items, but because the total phosphorus concentration of the upstream such as Daejeon stream, Yudeng stream, Gabchen 3 location did not reach the standard values, a better management of the interceptor was required in the upstream of WTP than its downstream. The upstream of WTP also required a better management of the interceptor than the downstream. The operation and management of WTP was required a high efficiency because the water quality of the effluent from the WTP incurred an adverse effect to the target water quality in the location of the total water pollution load management system.

Development of 1-Dimensional Water Quality Model Automatizing Calibration-Correction and Application in Nakdong River (1차원 수질 예측 모형의 검보정 자동화 시스템 개발 및 낙동강에서의 적용)

  • Son, Ah Long;Han, Kun Yeun;Park, Kyung Ok;Kim, Byung Hyun
    • Journal of Environmental Impact Assessment
    • /
    • v.20 no.5
    • /
    • pp.765-777
    • /
    • 2011
  • According to the total pollution load management system, exact prediction and analysis of water quality and discharge has been required in order to allocate the amount of pollution load to each local government. In this study, QUAL2E model was used for comparison with other water quality models and improve the inadequate to forecast future water quality. And Various calibration and verification methods were applied to deal with existing uncertainties of parameter during modeling water quality. For user convenience, A GUI(Graphical User Interface) system named "QL2-XP" model is developed by object-oriented language for the user convenience and practical usage. Suggested GUI system consist of hydraulic analysis, water quality analysis, optimized model calibration processes, and postprocessing the simulation results. Therefore this model will be effectively utilized to manage practical and efficient water quality.

Characterization of Stormwater Pollutants and Estimation of Unit Loads for Road and Parking Lot in Gyeongan Stream Watershed (경안천지역의 도로 및 주차장에 대한 강우유출수의 특성분석과 원단위 산정)

  • Go, Sung-Hun;Memon, Sheeraz Amed;Lee, Chang-Hee
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.5
    • /
    • pp.689-696
    • /
    • 2009
  • Unit load approach has been used to estimate the non-point pollutant load in Total Water Pollution Load Management System (TWPLMS). In this study, locally applicable unit loads for road and parking lot were developed based on the measurements of 9 rainfall events from 2007 to 2008 in Yongin city of Gyeongan stream watershed. Observations showed that stormwater runoff began at low precipitation (>1 mm) and peak pollutant concentration occurred at the beginning of the runoff because of impervious nature of the sites. Averaged event mean concentrations (EMCs) of road (parking lot) were estimated as COD 105.36(62.69) mg/L, BOD 15.94(13.20) mg/L, TSS 183.45(66.52) mg/L, T-N 4.63(3.28) mg/L, T-P 0.45(0.39) mg/L. Higher EMCs at the road than parking lot may reflect heavier traffic. Unit loads Estimated from the EMCs and 10 year average rainfall data were COD $331.17kg/km^2{\cdot}day$, BOD $50.20kg/km^2{\cdot}day$, TSS $580.13kg/km^2{\cdot}day$, T-N $14.68kg/km^2{\cdot}day$, T-P $1.43kg/km^2{\cdot}day$ in the road and COD $186.59kg/km^2{\cdot}day$, BOD $39.22kg/km^2{\cdot}day$, TSS $199.15kg/km^2{\cdot}day$, T-N $9.70kg/km^2{\cdot}day$, T-P $1.16kg/km^2{\cdot}day$ in the parking lot. The estimated unit loads are not so comparable to the ones listed in TWPLMS technical guideline and published data that locally developed unit loads should be used to estimate non-point pollutant loads.

Research on the Evaluation of Impaired Waterbody using the Flowrate Group at TMDL Unit Watershed in Nakdong River Basin (수질오염총량관리 단위유역 유량그룹별 수체 손상 분석)

  • Hwang, Ha-Sun;Kim, Sang-Soo;Kim, Jin-Lee;Park, Bae-Kyung
    • Journal of Korean Society on Water Environment
    • /
    • v.28 no.6
    • /
    • pp.933-942
    • /
    • 2012
  • The purpose of this study is to evaluate the degree of waterbody impairment according to the flow conditions and present to the appropriate water quality improvement alternatives using observed water quality and flow for Total Maximum Daily Load (TMDL) implementation at 39 unit watersheds the nakdong river basin. Observed water quality data for 7 years are divided into five cumulative flow frequency group and comparing the each observed water quality data and TMDL Target water quality (TWQ) the last evaluate the water quality is impaired group. We found that the cumulative flow frequency group-specific the average excess rate of V group was the highest (32.86%), followed by the IV group (26.04%), group III (23.36%), II group (22.67%), I group (20.70%), the degree of impaired waterbody tended to be inversely proportional to the flow rate. Resulted from cumulative flow frequency group of impaired water quality assessment, 13 unit watersheds are impaired from a group IV and group V affected by point sources. Therefore, improvement of sewage discharge and the initial composition of the riparian buffer zone are needed. Nakbon F, Namkang D and Namkang E within 13 unit watersheds are impaired from group II and III affected by non-point sources. Therefore, application of Best Management Practices (BMPs) is needed for these watersheds. Evaluation of impaired waterbody using Cumulative flow frequency group is able to determine the extent of the judgment to TWQ exceeded by the flow conditions and helps proper setting Standard flow and planning pollutant reduction for TMDL.