Study on the Application of Semi-open cut Top-Down Construction for Framework (세미 오픈컷 역타공법의 현장적용에 관한 연구)

  • Sho, Kwang-Ho
    • Journal of Korean Association for Spatial Structures
    • /
    • v.11 no.2
    • /
    • pp.129-138
    • /
    • 2011
  • Construction methods for underground structure are classified as bottom-up, up-up, and top-down methods depending on the procedure of construction related to a superstructure. In top-down construction methods, building's main structure is built from the ground level downwards by sequentially alternating ground excavation and structure construction. In the mean time, the main structure is also used as supporting structure for earth-retaining wall, which results in the increased stability of the earth-retaining wall due to the minimized deformation in adjacent structures and surrounding grounds. In addition, the method makes it easy to secure a field for construction work in the downtown area by using each floor slabs as working spaces. However top-down construction method is often avoided since an excavation under the slab has low efficiency and difficult environment for work, and high cost compared with earth anchor method. This paper proposes a combined construction method where semi-open cut is selected as excavation work, slurry as earth -retaining wall and CWS as top-down construction method. In the case study targeted for an actual construction project, the proposed method is compared with existing top-down construction method in terms of economic feasibility, construction period and work efficiency. The proposed construction method results in increased work efficiency in the transportation of earth and sand, and steel frame erection, better quality management in PHD construction, and reduced construction period.

Numerical Approach to Evaluate the Behavior of Concrete Panel Considering Construction Method (수치해석을 이용한 시공방법에 따른 판넬식 옹벽의 거동 분석에 관한 연구)

  • Junhee, Kang;Hoki, Ban
    • Journal of the Korean GEO-environmental Society
    • /
    • v.23 no.12
    • /
    • pp.17-23
    • /
    • 2022
  • This paper analyze the precast panel retaining wall's safety factor changes based on the numerical analysis using PLAXIS 2D software. Numerical analysis conditions include construction method, nail and panel fixing method, backfill material compaction conditions, rainfall conditions. The classification according to the construction method of the precast panel retaining wall includes the top-down and bottom-up methods. The difference between the top-down and bottom-up methods is the presence or absence backfill material and the ground excavation method. The top-down method involves vertically excavating the ground and attaching the panel using mortar, but in the bottom-up method, the ground is vertically excavated and harden the backfill material. As a result of numerical analysis, the top-down method secured a higher safety factor in all cases except the rainfall conditions.

The Behavior of Earth Retaining Walls Applied to Top-Down Construction Method Using Back Analysis (Top-Down 공법이 적용된 흙막이벽의 역해석을 이용한 거동분석)

  • Hong, Won-Pyo;Kang, Chul-Joong;Yun, Jung-Mann
    • The Journal of Engineering Geology
    • /
    • v.22 no.1
    • /
    • pp.39-48
    • /
    • 2012
  • The behaviors of a diaphragm wall and a contiguous pile wall such as CIP(Case-in-place pile) and SCW(Soil-cement wall), applied to the top-down construction method, were analyzed using the SUNEX program, which is widely used to design earth retaining walls. Four types of earth pressures, as described by Rankine (1857), Terzaghi and Peck (1967), Tchbotarioff (1973), and Hong and Yun (1995a), were applied to the analysis program to predict the lateral displacement of walls. The results show that the displacements of an earth retaining walls vary with the applied earth pressure. The predicted lateral displacement based on Hong & Yun's (1995a) earth pressure is similar to the measured displacement. Therefore, the actual lateral displacement of an earth retaining wall, as applied to top-down construction method, can be accurately predicted by using an analysis program considering Hong and Yun's (1995a) earth pressure.

Measurement and Analysis of Prefounded Column Straightness in Top Down Construction (Top Down 선기둥의 계측과 자료 분석)

  • Shin Cheon-Kyun;Rhim Hong-Chul;Kim Seung-Weon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.05a
    • /
    • pp.173-176
    • /
    • 2006
  • The purpose of this study is to investigate the cause of an error of prefounded column straightness and to measure the error during Top-Down construction. There are several causes of an error of prefounded column : (1) The columns are connected by welding or other methods. (2) concrete and aggregates are put in columns. (3) The columns are constructed during the construction. The error of column straightness is different for each column, and the tilting of columns is shown in one or two directions between floors. The additional loads caused by the error of straightness may give damage to buildings.

  • PDF

Structural Stability Study on the Location and Installation form of H-beam Backfill Applied to Top-Down Construction Method (역타공법에 적용되는 뒷채움재 위치 및 설치 형태에 대한 구조 안정성 연구)

  • Shim, Hak-Bo;Jeon, Hyun-Soo;Seok, Won-Kyun;Park, Soon-Jeon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.179-179
    • /
    • 2021
  • Top-Down construction method is a method of connecting a beam to a column and using a strut to support earth retaining walls. This method has the advantage of reducing the process of underground construction by reducing the work of installation. Recently, there are a lot of cases of damage and defect occurring in H-beam backfill applied to Top-Down construction method and the concrete slab supporting H-beam backfill. For this, appropriate methods were suggested through finite element analysis of the position and installation form of the H-beam backfill.

  • PDF

A Study on Void Characteristics with V-meter in Top-Down Column Joint Part. (초음파를 이용한 역타기둥 이음부의 공극특성에 관한 연구)

  • 이영도;정상진
    • Journal of the Korea Institute of Building Construction
    • /
    • v.1 no.2
    • /
    • pp.191-195
    • /
    • 2001
  • When top down method is used, it could be a construction method trouble in column joint, between the former concrete and the latter. It could bring a void and weak concrete in column. The purpose of this study is finding a way to prevent concrete void and concrete suitable for top down , through V-metering for top down column and concrete experiment. To minimize the void of reverse placement joint, It is more effect to use the sheath method then direct method in concrete placement.

  • PDF

Bearing Capacity Evaluation of Drilled Shaft for Top & Down Method (탑다운 기초 현장타설말뚝의 지지력 평가)

  • Cho, Chun-Whan;Kim, Hong-Mook;Kim, Woong-Kyu;Kwon, Se-Oh;Sung, Byung-Wan
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.58-65
    • /
    • 2004
  • Recently, the top & down method with drilled shafts as a foundation of high rise building is often adopted for the purpose of construction period reduction and construction cost effectiveness. It is common to omit the loading test as a Quality assurance on account of the high capacity of drilled shafts for the top & down method. It seems that the capacity of drilled shaft in recent top & down method is beyond that of conventional loading test method.However, the quality assurance for the drilled shaft as foundation of high rise building becomes much more important since the drilled shaft should bear much higher working load. It may be a small scale test pile could be an alternative as a quality assurance for the drilled shaft with high capacities. Through a case study, this paper gives an idea for solving the limitation of the conventional loading test method for the quality assurance of drilled shaft with high capacities. In particular, this paper analyzed the scale effect for a small drilled shaft installed into bedrock, which could be used for an alternative.

  • PDF

DEVELOPMENT AND APPLICATION OF SUBSTRUCTURE NON SUPPORTING FORMWORK FOR TOP-DOWN CONSTRUCTION

  • Mee-Ra Jeong;Hong-Chul Rhim;Doo-Hyun Kang;Kwang-Jun Yoo
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.788-793
    • /
    • 2009
  • Constructing substructures by using Top-Down or Downward method needs an efficient formwork system because of difficulties in supporting concrete slabs from the bottom while excavation is in process. Existing underground formwork systems can be classified by three types: graded ground supported type (Slab On Grade, Beam On Grade), suspension type (Non Supporting Top Down Method), and bracket supported type (Bracket Supported R/C Downward). Each method has its own advantages and limits. Application of a specific formwork system for a given construction site is determined by various conditions and affect construction time and cost. This paper presents a newly developed underground non-supporting formwork system, which combines the advantages of a suspension type and a bracket supported type while it overcomes limits of two types. The developed system has a moving formwork which is supported by suspension cables hanging from the bracket placed at the top of pre-installed substructure columns. Then, the moving formwork is repeatedly lowered down for the next floor below to support concrete slab during curing. The details of this bracket and cable supported system have been investigated for the improvement of easiness in construction.

  • PDF

Top-Down Method of Deep Basement Construction in Urban Area : a Comparison of Numerical Analysis and Field observation Data (도심지 지하굴착에 적용된 Top-Down 공법의 수치해석과 실측비교)

  • 김학문
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1991.10a
    • /
    • pp.312-331
    • /
    • 1991
  • Top-down Method of basement construction technique has been applied for building of the deep basement car park the close proximity of priceless historic buildings in LONDON. Numerical analysis for the prediction of ground movement of the surrounding buildings was performed in order to compare the field data at the various stages of excavation and support. The predicted results from the elasto-plastic analytical method were compared with the observed data and the agreement is very satisfactory. It may be concluded that the system of diaphragm wall supported by the permanent base slabs (Top-Down Method) was proved to be the most effective technique in terms of reducing any critical damage to the surrounding buildings.

  • PDF

A Study on Crack Reduction Method in open Section of Down-Up Underground Construction Method Affected by Earth Pressure (토압 영향을 받는 Down-Up 지하공사 공법의 오픈 구간 균열 저감 방안 연구)

  • Shim, Hak-Bo;Jeon, Hyun-Soo;Seok, Won-Kyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.196-197
    • /
    • 2021
  • The underground method can be divided into Top-Down, Semi-Top-Down, Up-Up and Down-Up methods according to the construction order of the upper and lower structures. Among them, the Down-Up method proceeds with the construction of the first floor and its lower floors, and when the foundation is completed, the vertical members of the basement are sequentially completed from the foundation and the above-ground floor is constructed. In this paper, the crack reduction method around the open section of the Down-Up method affected by earth pressure was analyzed and divided into design and construction parts.

  • PDF