• Title/Summary/Keyword: Top management team

Search Result 86, Processing Time 0.021 seconds

Project Learning Enablers within Fragmented Construction Projects

  • Alashwal, Ali Mohammed
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.588-592
    • /
    • 2015
  • Many studies have affirmed a negative influence of fragmentation on learning and knowledge sharing in construction projects. However, the literature overlooked enablers of learning within this context. The purpose of this paper is to explore the factors that facilitate project learning and ways to negate any unbecoming effects of fragmentation. Qualitative study used to explore the enablers through interviews administered to 11 top management individuals working in different construction projects in Malaysia. The findings revealed the following factors: participation, relationships, togetherness, and roles of project leader and coordinator. The role of boundary objects was also highlighted including information technology (IT), contract and procedures, drawings, specifications, and reports. The outcome of this paper initiates the development of a model for better knowledge creation and sharing in construction projects. The significance of this model stems from its ability to connection both the characteristics of construction project and project learning theories using the enablers. It is envisaged that future work will be to confirm the model in a quantitative study.

  • PDF

Analysis on Heat Dissipation Characteristics of a Tile-Type Digital Transmitter/Receiver Module (적층형 디지털송수신모듈의 방열특성 분석)

  • Yoon, Kichul;Kim, Sangwoon;Heo, Jaehun;Kwak, Nojin;Kim, Chan Hong
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.22 no.2
    • /
    • pp.249-254
    • /
    • 2019
  • A Digital Transmitter/Receiver Module(DTRM), which is an essential part in active phased-array radar systems, generates a high heat density, and needs to be properly cooled for stable operation. A tile-type DTRM that is a stacking structure of multi-layer components was modeled with simplification and heat dissipation characteristics of the DTRM model were studied using computational fluid dynamics(CFD) simulations. Most of the heat was dissipated by the heat conduction through the cold plate, but the heat transfer by the forced convection on top of the DTRM also was found to play an important role in the thermal management. Under the given conjugated heat transfer environment, the DTRM was confirmed to secure a stable operating temperature range.

Influence of Leadership Style on Affect Climate and Organizational Performance in Korean Export Manufacturing Enterprises (한국 수출제조기업의 리더십 스타일이 정서분위기와 조직성과에 미치는 영향)

  • Kim, Dae-Gon;Kim, Hag-Min
    • Korea Trade Review
    • /
    • v.44 no.3
    • /
    • pp.203-226
    • /
    • 2019
  • This study incorporates the structural relationships between leadership styles (LS), affect climate (AC), and organizational performance (OP) in Korean export manufacturing companies with three or more overseas subsidiaries. A theoretical model is suggested with the following empirical results. First, the positive effect of engaging leadership (EL) on organizational citizenship behavior (OCB), as well as of engaging leadership, involving leadership (IL), and goal-oriented leadership (GL) on team performance (TP), proved to be significant. Second, both engaging leadership and goal-oriented leadership have significant positive effects on optimism, while involving leadership has significant negative effects on pessimism. Third, only optimism has a positive (+) effect on OCB and TP. The mediating effects were proved to be significant in two paths: one in EL->optimism->OCB and the other in EL->optimism->TP. Finally, in responding to rapid changes in the external environment of exporting companies, the engaging leadership is a key source of organizational performance by forming a favorable affect climate. Therefore, top management should recognize the role of team leaders and strengthen their leadership training. In addition, it was confirmed that leaders with emotional intelligence that can respond to the affects of members play a more important role in forming an optimistic climate in Korea export manufacturing enterprises with foreign subsidiaries.

Analyzing Management Factors on Enterprise Performance

  • Dahlgaard, Jens J.;Ciavolino, Enrico
    • International Journal of Quality Innovation
    • /
    • v.8 no.3
    • /
    • pp.1-10
    • /
    • 2007
  • A sample of Italian manufacturing companies was selected in order to verify the abilities and effects (relationships) of the management factors human resources, leadership and strategic planning on company performance. The Partial Least Squares (PLS) estimation method was used for analyzing the data collected, where the relationships between the management factors and performance were formalized by a Structural Equation Model (SEM). The analysis of the survey data showed unexpected result regarding the non significant direct relationship between Leadership and Performance. The effect of Leadership is obtained by an indirect relationship through Human Resources. The combination of Leadership and Human Resources has hence been identified as the management factors which have the highest impact on the performance of Italian industrial companies. Another interesting and unexpected result was that there was no significant impact of Strategic Planning on Performance. It seems that the leaders of Italian industrial companies have not understood that good strategic planning is a necessary condition for achieving excellence. So another improvement area is in fact Strategic Planning. This area should have the highest priority of any top management team and the focus should include how to establish a strong relationship between strategic planning and performance. No correlation between strategic planning and performance is a strong indication that something is wrong. It is not enough that Leadership is doing Strategic Planning-Leadership is also about studying and follow up on results in order to assure impacts on performance. This link seems to be missing in Italian industrial companies.

PI(Process Innovation)와 Six sigma연계 전략

  • 김영곤
    • Proceedings of the Korean Society for Quality Management Conference
    • /
    • 2004.04a
    • /
    • pp.160-165
    • /
    • 2004
  • 최근 각 기업에는 6시그마, PI등 여러 가지 혁신 활동이 차별화 되지 않고 도입되는 경향이 있으며, 기업 내부에서도 바람직한 혁신활동 연계방안에 대해서 많은 고민을 하고 있는 실 정 임. 따라서 이러한 혁신활동을 잘 이해하고 통합할 수 있는 방안이 필요 할 것이며, 여기에서는 이것들을 연계한 경영 전략을 제시하고자 한다. 6시그마와 PI의 특징을 살펴보면, 비즈니스 리엔지니어링은 급격하게 변화하는 프로세스의 구성을 의미하는 것으로 볼 수 있으나 PI는 보다 포괄적인 개념이다. 즉, 새로운 작업전략(Work Strategy)의 비전설정과 실질적인 프로세스 디자인 활동을 포함한다. 또한 기술적 차원, 인간적 차원, 조직적 차원등 다차원적 변화의 추진과 실행을 의미한다. 반면에 6시그마는 고객의 요구(Customer Requirement)를 명확히 이해하고 이에 대응하는 기업의 모든 활동을 Top Down시각에서 합리적인 전사 표준을 통해 측정, 평가 후 도출되는 문제점 및 개선 사항에 대해 개선 프로세스에 따라 TFT(Task Force Team) 활동을 지속적으로 전개함으로써 총체적 고객만족을 구현하는데 궁극적인 목적을 둔다. 이러한 경영혁신 활동은 구성원의 참여를 기반으로 하며, 이에 대한 권한 위임과 더불어 지속적인 지원을 바탕으로 제품 및 서비스에 영향을 미치는 모든 부문에 걸쳐 영역 제한 없이 실시하는 것을 의미한다. 따라서 6시그마는 결코 PI를 대체할 수 없으며 상호 보완적 관계로 연계시켜 추진하는 것이 바람직하다.

  • PDF

Investigating the Factors Influencing Project Satisfaction and Performance in Pre-Project Phase (프로젝트 준비단계에서 프로젝트 성과에 영향을 미치는 요인에 관한 연구)

  • Kim, Gimun;Park, Yu Jin;Kim, Kijoo
    • Journal of Information Technology Applications and Management
    • /
    • v.20 no.4
    • /
    • pp.293-313
    • /
    • 2013
  • Preproject phase is an important but often ignored research area in information systems field although it has an undeniable importance for successful project. The purpose of this study is to identify factors affecting project performance in preproject phase and to find empirically critical factors among them. After deriving 9 factors through literature review including clear project definition, project leader position, staffing efforts, preproject team expertise, preproject knowledge scope, preproject partnering, top-management support, resource sufficiency, and project climate, the study investigate the influence of those factors on project performance. The study results reveal that clear project definition, project climate, resource sufficiency, pre-project knowledge scope, project leader position have significant impact on project process satisfaction, a measure of project performance, but the other factors do not. Based on the empirical results, the study discuss academic and practical implications.

Analysis on the Relationship of MOT and NPD Performance -Medium-Sized Manufacturing Firms- (기술경영과 신제품개발 성과와의 관계분석 -중규모 제조기업을 중심으로-)

  • Park, Chul Min
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.7 no.4
    • /
    • pp.159-168
    • /
    • 2012
  • The purpose of this study is to analyze the relationship of MOT and NPD performance in medium-sized manufacturing firms. To accomplish the purpose of the study, working hypotheses were established based on the literatures about the impacts of MOT factors on the NPD performance. The sample of this study is as follows : 12 electrical and electronics companies, 18 machine and engineering companies, 16 parts and materials companies. In order to verify hypotheses, the data were collected from team leader and manager of research center, R&D, and production department of these companies and the leader of R&D project team who all had experience in project or were participating in it in latest 3 years. The results of study were summarized as follows : First, in analysis on the reality of MOT factors in sample firms, will of top management level on the MOT was comparatively high but relatedness of business strategy and technology strategy, open R&D system, systematic time scheduling, management of R&D manpower, and developing and adapting PLM system were common level. Second, to improve NPD performance in medium-sized manufacturing firms, will of top management level on the MOT, relatedness of business strategy and technology strategy, open R&D system, systematic time scheduling, management of R&D manpower, and developing and adapting PLM system were intensively required.

  • PDF

Human Resource Management Implementation as a Process of Sensemaking and Sensegiving (센스형성과 센스전달의 과정으로서 인적자원관리 실행)

  • Han, Sujin;Park, Owwon
    • Knowledge Management Research
    • /
    • v.15 no.1
    • /
    • pp.65-84
    • /
    • 2014
  • Organization's innovation capability is strongly tied to its intellectual capital or knowledge utilization. Employees play a key role in generation of intellectual capital and utilization of knowledge in a firm. Thus, the importance of human resource management (HRM) system for enhancing competency of employees and facilitating knowledge sharing between employees is getting its significance. In this paper, we highlighted the effect of HRM implementation to explain the reason of performance differences among firms, adopting the same ideal HRM system. The successful implementation of HRM system as well as the contents of HRM system was critical to enhance firm performance through HRM system. To investigate the effect of HRM implementation on firm performance, we proposed the three components of HRM implementation (i.e.; TMT philosophy, HR department capability and communication) in perspective of sense making and sense giving theory. Then, we analyzed the moderating effect of HRM implementation on the high commitment HRM - firm performance relationship. Empirical results showed that each component of HRM implementation positively strengthened the relationship between high commitment HRM and firm performance. In addition, the composite index of HRM implementation calculated by average value of three components revealed more significant moderating effect between the two. Furthermore, We discussed the academical and practical implications, and suggested future research directions.

  • PDF

A Study on the Importance of Measures for Improving PLM System Usage (PLM 시스템 활용도 향상 방안의 중요도에 관한 연구)

  • Yoo, Jong Kwang;Rim, Seong Taek;Min, Dai Hwan
    • The Journal of Information Systems
    • /
    • v.31 no.1
    • /
    • pp.239-269
    • /
    • 2022
  • Purpose This paper attempts to identify items for improving the usage of PLM(Product Lifecycle Management) systems and suggests ways to prioritize improvement items on the basis of importance. It also tries to find out differences in the importance of improvement items due to the company size, the industry, the job, or the PLM solution. Design/methodology/approach Through a survey from participants to a PLM System Conference, data were collected from a sample of 181 users who had the previous experience in using a PLM system. In order to figure out the differences in the importance among user groups, the F-test with the Scheffe test as a post-hoc analysis was used in case of equal variances and the Welch test with the Dunnett T3 test was used in case of unequal variances. Findings This study sorted out 25 improvement ideas according to their importance assessed by the PLM system users. The top five ideas are improving data consistency, error minimization, fast system response time, enhancing user recognition, and business process improvement. The support group puts higher importance than the general user group in data consistency, fast system response time, enhancing user recognition, business process improvement, dedicated team for data consistency, continuous support from management, hardware performance upgrade, output linkage to other systems, and shortening problem solving duration. The largest company group attaches significantly higher weights than the smallest company group to data consistency, error minimization, fast system response time, business process improvement, dedicated team for data consistency, security with proper access management, output linkage to other systems, and better user interface.

SYSTEMS STUDIES AND MODELING OF ADVANCED LIFE SUPORT SYSTEM

  • Kang, S.;Ting, K.C.;Both, A.J.
    • Proceedings of the Korean Society for Agricultural Machinery Conference
    • /
    • 2000.11c
    • /
    • pp.623-631
    • /
    • 2000
  • Advanced Life Support Systems (ALSS) are being studied to support human life during long-duration space missions. ALSS can be categorized into four subsystems: Crew, Biomass Production, Food Processing and Nutrition, Waste Processing and Resource Recovery. The System Studies and Modeling (SSM) team of New Jersey-NASA Specialized Center of Research and Training (NJ-NSCORT) has facilitated and conducted analyses of ALSS to address systems level issues. The underlying concept of the SSM work is to enable the effective utilization of information to aid in planning, analysis, design, management, and operation of ALSS and their components. Analytical tools and computer models for ALSS analyses have been developed and implemented for value-added information processing. The results of analyses have been delivered through the Internet for effective communication within the advanced life support (ALS) community. Several modeling paradigms have been explored by developing tools for use in systems analysis. They include object-oriented approach for top-level models, procedural approach for process-level models, and application of commercially available modeling tools such as MATLAB$\^$(R)//Simulink$\^$(R)/. Every paradigm has its particular applicability for the purpose of modeling work. An overview is presented of the systems studies and modeling work conducted by the NJ-NSCORT SSM team in its efforts to provide systems analysis capabilities to the ALS community. The experience gained and the analytical tools developed from this work can be extended to solving problems encountered in general agriculture.

  • PDF