• Title/Summary/Keyword: Timing of operation

Search Result 486, Processing Time 0.025 seconds

Determination Method of Signal Timing Plan Using Travel Time Data (통행시간 자료를 이용한 신호시간계획의 결정 방법)

  • Jeong, Young-Je
    • The Journal of the Korea Contents Association
    • /
    • v.18 no.3
    • /
    • pp.52-61
    • /
    • 2018
  • This research suggested the traffic signal timing calculation model for signal intersections based on sectional travel time. A detection system that collects sectional travel time data such as Urban Transport Information System(UTIS) is applied. This research developed the model to calculate saturation flow rate and demand volume from travel time information using a deterministic delay model. Moreover, this model could determine the traffic signal timings to minimize a delay based on Webster model using traffic demand volume. In micro simulation analysis using VISSIM and its API ComInterface, it checked the saturation conditions and determined the traffic signal timings to minimize the intersection delay. Recently, sectional vehicle detection systems are being installed in various projects, such as Urban Transportation Information System(UTIS) and Advanced Transportation Management System(ATMS) in Korea. This research has important contribution to apply the traffic information system to traffic signal operation sector.

Real-time 256-channel 12-bit 1ks/s Hardware for MCG Signal Acquisition (심자도 신호획득을 위한 실시간 256-채널 12-bit 1ks/s 하드웨어)

  • Yoo, Jae-Tack
    • The Transactions of the Korean Institute of Electrical Engineers D
    • /
    • v.54 no.11
    • /
    • pp.643-649
    • /
    • 2005
  • A heart diagnosis system adopts Superconducting Quantum Interface Device(SQUD) sensors for precise MCG(MagnetoCardioGram) signal acquisitions. Such system needs to deal with hundreds of sensors, requiring fast signal sampling md precise analog-to-digital conversions(ADC). Our development of hardware board, processing 64-channel 12-bit in 1 ks/s speed, is built by using 8-channel ADC chips, 8-bit microprocessors, SPI interfaces, and specially designed parallel data transfers between microprocessors to meet the 1ks/s, i.e. 1 mili-second sampling interval. We extend the design into 256-channel hardware and analyze the speed .using the measured data from the 64-channel hardware. Since our design exploits full parallel processing, Assembly level coding, and NOP(No Operation) instruction for timing control, the design provides expandability and lowest system timing margin. Our result concludes that the data collection with 256-channel analog input signals can be done in 201.5us time-interval which is much shorter than the required 1 mili-second period.

Clinical Results and Optimal Timing of OPCAB in Patients with Acute Myocardial Infarction (급성 심근경색증 환자에서 시행한 OPCAB의 수술시기와 검색의 정도에 따른 임상성적)

  • Youn Young-Nam;Yang Hong-Suk;Shim Yeon-Hee;Yoo Kyung-Jong
    • Journal of Chest Surgery
    • /
    • v.39 no.7 s.264
    • /
    • pp.534-543
    • /
    • 2006
  • Background: There are a lot of debates regarding the optimal timing of operation of acute myocardial infarction (AMI). Off pump coronary artery bypass grafting (OPCAB) has benefits by avoiding the adverse effects of the cardio-pulmonary bypass, but its efficacy in AMI has not been confirmed yet. The purpose of this study is to evaluate retrospectively early and mid-term results of OPCAB in patients with AMI according to transmurality and timing of operation. Material and Method: Data were collected in 126 AMI patients who underwent OPCAB between January 2002 and July 2005, Mean age of patients were 61.2 years. Male was 92 (73.0%) and female was 34 (27.2%). 106 patients (85.7%) had 3 vessel coronary artery disease or left main disease. Urgent or emergent operations were performed in 25 patients (19.8%). 72 patients (57.1%) had non-transmural myocardial infarction (group 1) and 52 patients (42.9%) had transmural myocardial infarction (group 2). The incidence of cardiogenic shock and insertion of intra-aortic balloon pump (IABP) was higher in group 2. The time between occurrence of AMI and operation was divided in 4 subgroups (<1 day, $1{\sim}3\;days,\;4{\sim}7\;days$, >8 days). OPCAB was performed a mean of $5.3{\pm}7.1$ days after AMI in total, which was $4.2{\pm}5.9$ days in group 1, and $6,6{\pm}8.3$ days in group 2. Result: Mean distal an-astomoses were 3.21 and postoperative IABP was inserted in 3 patients. There was 1 perioperative death in group 1 due to low cardiac output syndrome, but no perioperative new MI occurred in this study. There was no difference in postoperative major complication between two groups and according to the timing of operation. Mean follow-up time was 21.3 months ($4{\sim}42$ months). The 42 months actuarial survival rate was $94.9{\pm}2.4%$, which was $91.4{\pm}4.7%$ in group 1 and $98.0{\pm}2.0%$ in group 2 (p=0.26). The 42 months freedom rate from cardiac death was $97.6{\pm}1.4%$ which was $97.0{\pm}2.0%$ in group 1 and $98.0{\pm}2.0%$ in group 2 (p=0.74). The 42 months freedom rate from cardiac event was $95.4{\pm}2.0%$ which was $94.8{\pm}2.9%$ in group 1 and $95.9{\pm}2.9%$ in group 2 (p=0.89). Conclusion: OPCAB in AMI not only reduces morbidity but also favors hospital outcomes irrespective of timing of operation. The transmurality of myocardial infarction did not affect the surgical and midterm outcomes of OPCAB. Therefore, there may be no need to delay the surgical off-pump revascularization of the patients with AMI if surgical revascularization is indicated.

COMPARISON OF THE COMBUSTION CHARACTERISTICS BETWEEN S.I. ENGINE AND R.I. ENGINE

  • Chung, S.S.;Ha, J.Y.;Park, J.S.;Kim, K.J.;Yeom, J.K.
    • International Journal of Automotive Technology
    • /
    • v.8 no.1
    • /
    • pp.19-25
    • /
    • 2007
  • This experimental study was carried out to obtain both low emissions and high thermal efficiency by rapid bulk combustion. Two kinds of experiments were conducted to obtain fundamental data on the operation of a RI engine by a radical ignition method. First, the basic experiments were conducted to confirm rapid bulk combustion by using a radical ignition method in a constant volume chamber (CVC). In this experiment, the combustion velocity was much higher than that of a conventional method. Next, to investigate the desirable condition of engine operation using radical ignition, an applied experiment was conducted in an actual engine based on the basic experiment results obtained from CVC condition. A sub-chamber-type diesel engine was reconstructed using a SPI type engine with controlled injection duration and spark timing, and finally, converted to a RI engine. In this study, the operation characteristics of the RI engine were examined according to the sub-chamber's specifications such as the sub-chamber volume and the diameter and number of passage holes. These experimental results showed that the RI engine operated successfully and was affected by the ratio of the passage hole area to the sub-chamber volume.

Transient cooling operation of multistage thermoelectric cooler (TEC)

  • Park, Jiho;Jeong, Sangkwon
    • Progress in Superconductivity and Cryogenics
    • /
    • v.23 no.3
    • /
    • pp.55-59
    • /
    • 2021
  • A thermoelectric cooler (TEC) is promising as an alternative refrigeration technology for the sake of its inherent advantages; no-moving parts and refrigerant-free in its operation. Due to the compactness, reliability and excellence in temperature stability, TECs have been widely used for small cooling devices. In recent years, thermoelectric devices have been attractive technologies that not only serve the needs of cooling and heating applications but also meet the demand for energy by recycling waste heat. In this research paper, multistage TEC is proposed as a concept of demonstrating the idea of transient cooling technology. The key idea of transient cooling is to harnesses the thermal mass installed at the interfacial level of the stages. By storing heat temporally at the thermal mass, the multistage TEC can readily reach lower temperatures than that by a steady-state operation. The multistage TEC consists of four different sizes of thermoelectric modules and they are operated with an optimized current. Once the cold-part of the uppermost stage is reached at the no-load temperature, the current is successively supplied to the lower stages with a certain time interval; 25, 50 and 75 seconds. The results show the temperatures that can be ultimately reached at the cold-side of the lowermost stage are 197, 182 and 237 K, respectively. It can be concluded that the timing or total amount of the current fed to each thermoelectric module is the key parameter to determine the no-load temperature.

The relationship of pulmonary arterial shunts and the operative results in tetralogy of Fallot (활로 4징증에서 폐동맥의 상태와 수술성적과의 관계)

  • An, Jae-Ho;Seo, Gyeong-Pil
    • Journal of Chest Surgery
    • /
    • v.17 no.4
    • /
    • pp.644-656
    • /
    • 1984
  • In Tetralogy of Fallot, the most common congenital cyanotic heart disease, the mortality is decreasing continuously with adequate type and timing of operation. At S.N.U.H., 195 patients were operated from January 1982 to December 1983 and 176 patients among them were analysed in the view of pre-operative pulmonary arterial condition measured by cardiac cineangiogram. The most common associated anomaly was PFO and ASD and they did not affect the postoperative course and mortality. The overall mortality rate was 8.5% in 1982 and 6.8% in 1983 but under 2 years of age, the mortality rate was relatively high as 25% in 1982 and 16.7% in 1983, and when transannular patch widening of Right Ventricular Outflow Tract was used, the mortality rate was 12.5% in 1982 and 27.3% in 1983. Preoperative angiographic measurements of the pulmonary arterial status for prediction of the ratio between the Left Ventricular and Right Ventricular peak systolic pressure were calculated retrospectively according to the Blackstones formula, and the predicted value of PRV/LV greater than 0.6 carried apparently high complication and mortality rate as 16.6% M.R. in 1982 and 11.1 % in 1983. Among postoperative complications, c-RBBB occurred most frequently about 50% but did not influenced to mortality, Low Cardiac Output Syndrome was developed in about 40%. If we select the patient who should have the staged operation including shunt operation and choose the type of RVOT relief, we expect the improvement of postoperative clinical results.

  • PDF

Numerical Analysis for Reduction of Fuel Consumption by Improvement of Combustion Condition in a Common Rail Diesel Engine Generator (커먼레일 디젤엔진 발전기의 연소상태 개선에 따른 연비절감을 위한 수치해석)

  • Kim, Seung Chul;Kim, Chung Kyun
    • Journal of the Korean Institute of Gas
    • /
    • v.20 no.4
    • /
    • pp.58-64
    • /
    • 2016
  • The main engine of a vehicle is used an common rail diesel engine for improving the efficiency of the whole load area. However, the generator engines is still used mechanical fuel injection valve drive cams. In addition, most of generator engines is applied a part-load operation of less than 50%. Therefore, diesel engine of vehicle set at 100% load is necessary to readjust in order to perform efficient operation because of part-load operation. In this study, the objective is to report the results of the part-load fuel consumption improvement by injection timing readjust to identify the operational characteristics of a generator engine currently operated in the facilities.

Hemiarthroplasty for Fractures or Fracture-Dislocations of the Proximal Humerus (상완골 근위부 골절 또는 골절 및 탈구에서의 상완골 두 치환술)

  • Kim Young Kyu;Eom Gi Serk
    • Clinics in Shoulder and Elbow
    • /
    • v.3 no.1
    • /
    • pp.20-25
    • /
    • 2000
  • Purpose : To evaluate functional results and study factors influencing results after humeral hemiarthroplasty for comminuted fractures of the proximal humerus. Materials and Methods: We reviewed 12 patients with average follow-up period of 23 months(12 to 42). The proximal humeral fractures consisted of one anatomical neck fracture, five three-part and six four-part fractures or fracture-dislocations. Constant score and Compito et al' evaluation system were used for clinical assessment. Statistical analysis was done with the Wilcoxon test. Results: Six cases of anatomical neck, three-part fractures or fracture-dislocations showed 61 points on the average Constant score and three unsatisfactory results on the Compito et al' evaluation; Six of four-part fractures or fracture-dislocations showed 51 points and three unsatisfactory results. There were 59(two unsatisfactory) for five non-associated dislocation and 53(four unsatistactory) for seven associated dislocation; 66(one unsatisfactory) for three under 60 years and 41(five unsatisfactory) for nine over 60 years; 67(two unsatisfactory) for seven tuberosity union and 41(four unsatisfactory) for five tuberosity non-union or resorption; 58(four unsatisfactory) for ten early operation within two weeks and 43(all unsatisfactory) for two delayed operation; and 18(unsatisfactory) for one case of a accompanied rotator cuff tear. Conclusion: We concluded that tuberosity union was important factor influencing the results. Also, we thought that age, timing of operation and accompanied rotator cuff tear could be influenced to results.

  • PDF

Large Step Optimization Approach to Flexible Job Shop Scheduling with Multi-level Product Structures (다단계 제품 구조를 고려한 유연 잡샵 일정계획의 Large Step Optimization 적용 연구)

  • Jang, Yang-Ja;Kim, Kidong;Park, Jinwoo
    • Proceedings of the Korea Inteligent Information System Society Conference
    • /
    • 2002.05a
    • /
    • pp.429-434
    • /
    • 2002
  • For companies assembling end products from sub assemblies or components, MRP (Material Requirement Planning) logic is frequently used to synchronize and pace the production activities for the required parts. However, in MRP, the planning of operational-level activities is left to short term scheduling. So, we need a good scheduling algorithm to generate feasible schedules taking into account shop floor characteristics and multi-level job structures used in MRP. In this paper, we present a GA (Genetic Algorithm) solution for this complex scheduling problem based on a new gene to reflect the machine assignment, operation sequences and the levels of the operations relative to final operation. The relative operation level is the control parameter that paces the completion timing of the components belonging to the same branch in the multi-level job hierarchy. In order to revise the fixed relative level which solutions are confined to, we apply large step transition in the first step and GA in the second step. We compare the genetic algorithm and 2-phase optimization with several dispatching rules in terms of tardiness for about forty modified standard job-shop problem instances.

  • PDF

Effect of Weather, Flight, and Time Conditions on Anxiety and Time Perception of Helicopter Pilots in Flight (기상, 비행 및 시간 조건이 조종 중인 헬리콥터 조종사의 불안 및 시간지각에 미치는 영향)

  • MunSeong Kim;ShinWoo Kim;Hyung-Chul O. Li
    • Science of Emotion and Sensibility
    • /
    • v.26 no.1
    • /
    • pp.65-78
    • /
    • 2023
  • Aircraft are representative of human-machine systems. There is a delay between the human operation and the completion of the machine operation such as when the machine starts to operate and when the force is transmitted to the machine and completed. Time perception is an important component of timing tasks and is known to be affected by the anxiety associated with high arousal. This research verified the impact of weather, flight, and time conditions on the anxiety and time perception of in-service pilots in a virtual reality area. Weather conditions were divided into visual flight weather conditions and very low visibility conditions. Experiments 1 and 2 were performed with different flight and time conditions. In Experiment 1, time perception was measured by employing a button added to the control rod in the scenario of hovering and level flight with relatively little transformed in momentum and little delay. In Experiment 2, time perception was measured in the procedure of naturally taking off the helicopter by employing only the control stick in a takeoff scenario where there was a lot of transformation in momentum and a lot of delays. As a result of the experiment, it was reported that anxiety and heart rate increased in very low visibility conditions In particular, among all flight conditions in Experiments 1 and 2, it was reported that time was overestimated in the scenario of increased anxiety. This outcome can lead to overestimation of time under the impact of anxiety and failure of the timing task, which may lead to challenges in maneuvering and possibly lead to accidents.