• Title/Summary/Keyword: Time-Cost factor

Search Result 629, Processing Time 0.027 seconds

Optimal Burn-In under Warranty

  • Kim, Kui-Nam J.;Park, Chi-Yeon;Hong, Chan-Geui
    • Proceedings of the Safety Management and Science Conference
    • /
    • 1999.11a
    • /
    • pp.147-155
    • /
    • 1999
  • This paper discusses an optimal burn-in procedure to minimize total costs based on the assumption that the failure rate pattern follows a bimodal mixed Weibull distribution. The procedure will consider warranty period as a factor of the total expected burn-in cost. A cost model is formulated to find the optimal burn-in time that minimizes the expected burn-in cost. Conditional reliability for warranty period will be discussed. An illustrative example is included to show how to use the cost model in practice.

  • PDF

Analysis of Construction Cost Fluctuation Trends and Features on Apartment Housing

  • Park, Wonyoung;Kang, Tai-Kyung;Baek, Seung-Ho;Lee, Yoo-Sub
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.6
    • /
    • pp.624-635
    • /
    • 2012
  • Construction projects, including housing, are carried out over long periods of time. According to changes to the construction period, the cost of input materials and wages also changes. Therefore appropriate management is important in order to minimize cost risks caused by fluctuations in prices. In Korea, housing units are usually sold in lots prior to construction completion. Therefore, careful management of input elements such as materials and equipment that are sensitive to price fluctuations is very important. This study deals with how the price fluctuation of materials, labor, and equipment influences the change of housing cost and seeks a way for cost management through identifying key resources sensitive to price fluctuation. As a result, a change to the housing cost index multiplies depending on cost changes of materials and labor together. Labor costs are a major factor on the housing cost index. In addition, certain types of materials and labor input to housing construction greatly influence price fluctuations. Thus, it is found that managing those main cost factors is the key for effective cost management.

Product-Mix Decision Using Lean Production and Activity-Based Costing: An Integrated Model

  • MOHSIN, Nidhal Mohammed Ridha;AL-BAYATI, Hossam Ahmed Mohamed;OLEIWI, Zahra Hasan
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.8 no.4
    • /
    • pp.517-527
    • /
    • 2021
  • While the two principles of lean manufacturing and time-driven activity-based costing (TDABC) have been established out of multiple incentives and do not follow the same particular targets, there is substantial commonality between them. In these conditions, the supply management of a multi-product system needs a rigorous production model to minimize costs. In this sense, this paper proposes an interactive model with the consideration of optimizing product-mix decisions using both lean development tools and TDABC. This paper proposes a qualitative approach using the case study of the Iraqi state company for battery production. The suggested model decreased manufacturing time and costs, along with some substantial reduction in idle production capacity by 26 percent in 2019, based on the findings of the case study. On the other hand, the proposed model gives two side advantages: an efficient division of costs on goods due to the use of time spent as a cost factor for products and cost savings due to the introduction of the lean manufacturing approach that reduces all additional costs and increases product-mix decisions. Furthermore, the analytical data gathered here suggests that the incorporation of lean management concepts and TDABC has a strong and important influence on product-mix decisions.

Time Shortening of Structural Framework of High-rise Apartment Housing for the Urgent Project Area: Focused on the Cases of Insufficient Time or Delayed Projects

  • Bang, Jong-Dae;Lee, Do-Heun;Chun, Young-Soo;Park, Ji-Young;Lee, Bum-Sik;Jun, Myoung-Hoon
    • Land and Housing Review
    • /
    • v.2 no.4
    • /
    • pp.355-365
    • /
    • 2011
  • Construction duration is very important as a factor which comprises three axises of construction management with quality and cost in construction project. In general project condition, construction duration is optimized while minimizing construction cost and securing required quality. However, in case of insufficient project time duration or delayed projects, project progress management is different from those of normal projects. These project areas need solutions to complete work within a given completion day. To time shortening the current duration of each typical floor of structural framework in apartment construction is investigated, and a basic time schedule planning for typical floor of structural framework in normal projects is planned. This study proposed 3 ways for time shortening of urgent project or insufficient construction duration project. Also, This study proposed detailed time shortening method and technical solution conditions while time is shortened.

Embedded 3D-Sensing Devices with Real-Time Depth-Imaging Technologies

  • Bhowmik, Achintya K.
    • Information Display
    • /
    • v.18 no.3
    • /
    • pp.3-12
    • /
    • 2017
  • In the recent years, significant advances have been made in the development of small form-factor, low power, and low cost 3D-sensing devices based on depth-imaging technologies with real-time performance. This has led to the advent of devices and machines that are able to sense and understand the world, navigate in the environment, and interact naturally with their human users. Human-computer interactions based on touch sensing and speech recognition have already become mainstream, and the rapid developments in 3D sensing is paving the path towards the next level of machine intelligence and interactions. This paper discusses the recent developments in real-time 3D sensing technologies and their emerging system application.

Coatable Retarder Technology for LCD Home TV

  • Lazarev, Alexander;Geivandov, Artur;Kasianova, Irina;Kharatiyan, Ellina;Lazarev, Pavel;Palto, Sergey
    • 한국정보디스플레이학회:학술대회논문집
    • /
    • 2008.10a
    • /
    • pp.1083-1086
    • /
    • 2008
  • Crysoptix KK has developed low-cost coatable retarder technology. A full range of coatable retardation films with tunable value of biaxiality (NZ factor) has been developed for the first time. Tunable NZ factor allows efficient compensation of modern VA and IPS mode LCD with just single retardation film.

  • PDF

A Empirical Study on the Changed Consumer Perception to Internet Based Channel (인터넷 기반 유통경로에 대한 소비자인식의 변화에 관한 실증적 연구)

  • Jung, Ki-Su;Moon, Seung-Jae
    • Journal of Industrial Convergence
    • /
    • v.1 no.1
    • /
    • pp.143-157
    • /
    • 2003
  • This paper examines the changed consumer perception to internet based channel. Internet based channel has time merit, place merit, assortment merit, compatibility merit, and so on. For seller, in the mean while, it has merits in the way of diminishing physical distribution cost, promotion cost, and reaching globally in the same time. In spite of so many merits of internet based channel, there were many types complain in past. Most of all, consumers expect that it will provide low-price merit to consumer, because it doesn't need shop, warehouse, stock, etc. Based on the empirical analyses in past, it didn't work, especially to price oriented consumer's perception. But in this research, it shows changing consumer's perception. Comparing past data with current data, we found outstanding gross in price related variables figure. But, in goods delivery related factors and personal credit information related factor, consumer recognized much more negatively yet. So, we conclude that even though some factors show improved perception, there are tasks to solve. We will observe the tuning point at that time.

  • PDF

Reinforced-Concrete Works Productivity Analysis on Nuclear-Power-Plant Project

  • Lim, Jin-Ho;Huh, Young-Ki;Oh, Jae-Hun;Seo, Hyeon-Taek
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.600-601
    • /
    • 2015
  • Both the importance and process of estimating Nuclear-power plant construction time and cost have increased in significance as energy user costs themselves have become more significant. In estimating construction time, few parameters are more significant than work item production rates and factors significantly affecting the rates. A standardized data collection tool was used to acquire a total of 401 data points from a S Nuclear-power plant project, for selected critical works: form-work, rebar-work, and concrete-pouring. With the data, several hypothesized drivers of the man-hour production rates and crew-day production rates were also analyzed. Findings from this study will enable industry professionals to enhance accuracy of time and cost estimation for nuclear power plant construction.

  • PDF

Empirical Study of Multimodal Transport Route Choice Model in Freight Transport between Mongolia and Korea

  • Ganbat, Enkhtsetseg;Kim, Hwan-Seong
    • Journal of Navigation and Port Research
    • /
    • v.39 no.5
    • /
    • pp.409-415
    • /
    • 2015
  • According to the globalization of world economy on distribution and sales, logistics and transportation parts are playing an important role. Especially, they have to decide what is the key factor of route choice model and how to choose the right transport route in multimodal transport system. By considering the key factors in rote choice model for freight forwarders between Mongolia and Korea, this paper propose 4 main factors: Cost, Delivery time, Freight and Logistics service with 13 sub factors. The importance of factors is surveyed base on AHP through interview with freight forwarders. In results, the empirical insights about current status of Mongolian forwarders are provided with different factors between transportation modes. Expecially, the Time factor is a role factor to choose transport route for air transportation forwarders.

An Adaptive Vendor Managed Inventory Model Using Action-Reward Learning Method (행동-보상 학습 기법을 이용한 적응형 VMI 모형)

  • Kim Chang-Ouk;Baek Jun-Geol;Choi Jin-Sung;Kwon Ick-Hyun
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.31 no.3
    • /
    • pp.27-40
    • /
    • 2006
  • Today's customer demands in supply chains tend to change quickly, variously even in a short time Interval. The uncertainties of customer demands make it difficult for supply chains to achieve efficient inventory replenishment, resulting in loosing sales opportunity or keeping excessive chain wide inventories. Un this paper, we propose an adaptive vendor managed inventory (VMI) model for a two-echelon supply chain with non-stationary customer demands using the action-reward learning method. The Purpose of this model is to decrease the inventory cost adaptively. The control Parameter, a compensation factor, is designed to adaptively change as customer demand pattern changes. A simulation-based experiment was performed to compare the performance of the adaptive VMI model.