• 제목/요약/키워드: Time progress

검색결과 2,167건 처리시간 0.027초

디지털공간의 현실공간의 '생성(becoming)'에 미치는 영향에 관한 연구 (A Study on the Influence of Digital Space on 'Becoming' Real Space)

  • 윤재은
    • 한국실내디자인학회논문집
    • /
    • 제16권5호
    • /
    • pp.126-133
    • /
    • 2007
  • This study is intended to set the concept of becoming meaning of digital space through digital technology and to study the influence of digital space on becoming of real space through derived keyword. The results of this study are summarized as follows. First, the digital concept is created in the process that the virtual space is changed into the real space with a priority given to form, space and time. Digital expression concept and image concept the structural becoming, and idea concept and creative concept creates the time becoming. Second, the concept of digital becoming exposes a physical visibility through the digital's virtual image, and non-space spatiality through the space simulation. It also continuously reveals a consecutive time and non-consecutive time through a statable progress, incremental progress, and dynamic progress. Third, as the influence of digital on becoming of real space, the digital visibly not only expresses the new and difficult becoming problem through conceptual virtuality, but also can review the real space's space concept with virtuality in the digital non-area. Digital's durability expresses the new space's existence by physically combining with the existing space through the virtual form creation.

정보통신서비스산업에서 경쟁도입의 경제적 효과 분석 (Economic Effect of Competition in the Korean IT Service Industry)

  • 조상섭;민완기;장송자
    • 기술혁신학회지
    • /
    • 제8권3호
    • /
    • pp.1157-1174
    • /
    • 2005
  • This paper aims at examining the disembodied technological progress in the Korean IT service industry, on the assumption that competition leads to the disembodied technological progress. Hobijn model (2000) which abstracts the disembodied technological progress from the total technological progress and Bai et al. Model (1998, 2003) which identifies time of the technological structural change are used for empirical study. The empirical analysis indicates the major structural change in the pattern of the disembodied technology progress occurred after 1995 in the Korean IT service industry. This means that policies for the introduction of competition system and the industry promotion around 1995 have a positive effect on the development of the Korean IT service industry.

  • PDF

지반굴착공사로 인한 사고사례 분석 (Analysis of accidents due to Urban Ground Excavation)

  • 성주현;윤종구;정수형
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 추계 학술발표회
    • /
    • pp.1087-1094
    • /
    • 2010
  • With recent growth of population and industry, urban development grows into grand scheme of excavation and construction in urban area. As the development progress advanced, the developments get large and deepen. With a progress of technology development in geotechnical engineering in Korea, most our grand scheme of projects follows great progress. On the other hand, some excavation in construction site caused direct or indirect event that affects the adjacent or surrounding structures by excavation from time to time. This event usually happens around residential and commercial area where underground tunnel, subway station, commercial building, and high-rises excavation site is, could lead great damage on economy as well as personal injury or human casualties. In order to prevent this event, the study has to be done with analysis on various events of excavation and its cause. In this paper, the research has collected the various excavation events and their causes to analyze on each site and event to define emphasis on surrounding environment.

  • PDF

대기중 교류 방전진전에 따른 방사전자파의 주파수 스펙트럼 특성 (The Characteristics of Frequency Spectrum of the radiated Electromagnetic Waves with AC Discharge Progress in Air)

  • 박광서;최병주;김기채;김이국;이광식
    • 조명전기설비학회논문지
    • /
    • 제17권2호
    • /
    • pp.81-87
    • /
    • 2003
  • 본 논문은 공기중 침대 평판 전극계를 이용하여 방전진전 과정과 부분방전을 모의하였다. 이 때 방전진전과정에 따른 방사전자파를 biconical 안테나와 스펙트럼 분석기를 이용하여 주파수 스펙트럼 분포를 분석 연구하였다. 본 연구의 결과로부터 공기중 교류방전 진전에 따른 방사전자파의 측정과 분석에 의한 절연진단을 위한 방법을 제시하였고 또한 방전진전과정과 방사전자파를 상호관계를 고려하면 부분방전의 검출과 방전진전과정의 평가가 가능함을 확인하였다

중소기업을 위한 일정 기반의 프로젝트 진도 관리 방안 (A Method of Progress Management of Projects Based on Schedule for Small and Medium Enterprises)

  • 오요셉;김보현;백재용;정소영;최영재
    • 산업공학
    • /
    • 제25권2호
    • /
    • pp.276-282
    • /
    • 2012
  • Earned value management(EVM) based progress management was designed to systematically manage large or huge projects with budget based criteria. For this reason, existed methods of EVM based progress management have a practical difficulty to apply to small and medium enterprises(SMEs) not possessing enough human resource, time, and cost. In other words, SMEs have performed simultaneously many small-sized projects emphasizing more project delivery than project budget. This study focuses on the area of project management applying to many small-sized projects simultaneously conducted by SMEs. Thus, the method proposed in this study is to manage only the progress of projects after removing cost factor in order to reduce man powers required for allocating the budget of projects to their all activities in detail in the stage of project planning. This study reveals that SMEs are able to manage progress of many projects easily and intuitively using the proposed method.

기후요소를 활용한 철골공사기간 예측 시스템에 관한 연구 - 실시간 진도관리 시스템 적용을 중심으로 -

  • 박정로;유승규;김경환;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 추계 학술논문 발표대회
    • /
    • pp.213-217
    • /
    • 2009
  • Weather factors affect cost increases and progress management under construction. Because progress schedule is delayed by weather factors, the construction costs are increased. It is an essential element to control the progress schedule applying weather factors to the progress management. This study applies monthly working-day percentages which is estimated by databases of past weather information to RTPM system. Through do progress management in construction projects exactly, will try to minimize risk of process control that do that is to weather factors. Also, will compare calamity in safety supervision side that do that is to weather factors beforehand. Based on the factors and the expected impact of factors together with the weather data during the last 50 years in Seoul region gathered from Korea. Through it, calculated number of month working day of RCA's structural steel work. Studied way that apply to RTPM system.

  • PDF

3D WALK-THROUGH ENVIRONMENTAL MODEL FOR VISUALIZATION OF INTERIOR CONSTRUCTION PROGRESS MONITORING

  • Seungjun Roh;Feniosky Pena-Mora
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.920-927
    • /
    • 2009
  • Many schedule delays and cost overruns in interior construction are caused by a lack of understanding in detailed and complicated interior works. To minimize these potential impacts in interior construction, a systematic approach for project managers to detect discrepancies at early stages and take corrective action through use of visualized data is required. This systematic implementation is still challenging: monitoring is time-consuming due to the significant amount of as-built data that needs to be collected and evaluated; and current interior construction progress reports have visual limitations in providing spatial context and in representing the complexities of interior components. To overcome these issues, this research focuses on visualization and computer vision techniques representing interior construction progress with photographs. The as-planned 3D models and as-built photographs are visualized in a 3D walk-through model. Within such an environment, the as-built interior construction elements are detected through computer vision techniques to automatically extract the progress data linked with Building Information Modeling (BIM). This allows a comparison between the as-planned model and as-built elements to be used for the representation of interior construction progress by superimposing over a 3D environment. This paper presents the process of representing and detecting interior construction components and the results for an ongoing construction project. This paper discusses implementation and future potential enhancement of these techniques in construction.

  • PDF

실험교흔조직의 수상 후 경과시간에 따른 병리조직학적 변화에 관한 연구 (A Study on the Histopathological Changes of Experimental Bite-marks with the Progress of Time)

  • 윤창륙;김종열
    • Journal of Oral Medicine and Pain
    • /
    • 제10권1호
    • /
    • pp.41-52
    • /
    • 1985
  • In order to observe the histopathological changes with the progress of time after formation of bite-mark, experimental bite-marks were made in female rats and histopathological examinations were performed in the given sites immediately, 5 minutes, 10 minutes, 30 minutes, I hr., 4 hrs., 8 hrs., 12 hrs., 24 hrs., and 48 hrs, after injury. Results and Summary 1. Subcutaneous loose connective tissues and fatty layers were compressed immediately after formation of bite-marks, injured epithelia showed hydropic degeneration 5 minutes later. 2. Inflammatory cells emigrated into tissues with hemorrhages in the tissues after 10 minutes, and more increased centered around the blood vessels.- These distributed most densely in the tissues, after 12 hrs., thereafter, were decreased and distributed in various groups of crowdy appearances, after 48 hrs. 3. After 10 minutes, neutrophils emigrated into tissues and disappeared gradually with an appearance of monocytes. These disappeared completely, after 24 hrs. Lymphocytes and plasma cells were see n at 48 hrs. later. 4. Adherence of mast cells to injured sites occurred immediately, and which adhered to blood vessel walls of injured sites, after 10 minutes. 8 hrs. later, degranulation in emigrated inflammatory cells showed, and these degranulation disappeared gradually with a progress of time.

  • PDF

철도시설공사의 현장 공정관리를 위한 원격 영상 운영체계 개발 (Development of Telepresence System for Schedule Management in Railway Construction Project)

  • 강인석;김현승;박진정;문현석;신민호
    • 한국철도학회논문집
    • /
    • 제13권1호
    • /
    • pp.23-30
    • /
    • 2010
  • 4D CAD에 의한 건설공사 공정관리시스템은 가상건설기법의 그래픽에 의한 계획일정위주 공정관리에 중점을 두고 있으므로 실제 현장상황의 판단에 의한 진도관리가 어려운부분이 있다. 본 연구는 4D CAD기반의 공정관리에 현장 웹카메라를 갖춘 Telepresence 기법을 이용한 원격현장 실시간 진도관리 모니터링체계를 연동하는 공정관기시스템 개발을 시도하고 있다. 개발된 시스템은 철도시설공사에 적용하여 활용성을 검증하였으며, 4D CAD에 의한 계획 공정현황과 웹카메라에 의한 실시간 실제현장 영상을 비교하여 시각적 진도관리를 가능하게 할 수 있다.

A REAL-TIME PMIS BASED INDUSTRIAL CONSTRUCTION PROJECT MANAGEMENT SYSTEM

  • Kyusung Lee;Hojeong Song;Jaehyun Choi
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.352-358
    • /
    • 2013
  • As amount of information in construction industry is growing, the role of information system in project management is becoming increasingly important. With the emerging IT application to the advancing construction industry, construction project management system with advanced technology has been progressed vigorously to improve construction productivity and management efficiency. Recently, a web-based Project Management Information System (PMIS) is developed to support decision-making process by efficiently managing project related information generated from various discipline. Many firms are in the process of developing the PMIS system or already have been applied the system to various projects. However, PMIS is still in its early stage of development to be applied at industrial plant construction projects that process management is significantly emphasized for the successful execution of the project. With the complexity of the industrial plant projects, the industry practitioners need to be able to visualize the construction schedule information to manage the project efficiently. This study suggests methodologies for improving PMIS specialized for industrial plant piping construction projects to estimate the baseline schedule and performance measurement more accurately by developing a framework for the piping construction projects. By using this developed system, the researchers expect that piping construction projects will be more efficiently managed on a real-time basis through measuring progress of piping at each and every state of progress milestone and provide management with opportunities to forecast the level of efforts required to execute the remaining work scope in a timely manner