• 제목/요약/키워드: Time of construction permit

검색결과 21건 처리시간 0.028초

CONSTRUCTION OF MANY d-ALGEBRAS

  • Allen, Paul J.
    • 대한수학회논문집
    • /
    • 제24권3호
    • /
    • pp.361-366
    • /
    • 2009
  • In this paper we consider constructive function triples on the real numbers $\mathbb{R}$ and on (not necessarily commutative) integral domains D which permit the construction of a multitude of d-algebras via these constructive function triples. At the same time these constructions permit one to consider various conditions on these d-algebras for subsets of solutions of various equations, thereby producing geometric problems and interesting visualizations of some of these subsets of solutions. In particular, one may consider what notions such as "locally BCK" ought to mean, certainly in the setting provided below.

건축물에너지절약계획서의 사업계획승인, 건축허가에 따른 적용시점의 타당성 연구 (A Study on the Feasibility of the Timing for the Implementation of Energy-Saving Plan of Buildings Based on the Approval of Business Plan and Construction Permit)

  • 김대원;김영일;정광섭
    • 에너지공학
    • /
    • 제21권3호
    • /
    • pp.265-270
    • /
    • 2012
  • 에너지절약에 대한 규제가 심하고 국민 다수가 에너지절감에 대한 관심이 높은 상태에서 사업계획승인을 받은 건축물이 건축허가가 지연되어 주변 신규 사업건과 함께 입주된 지역에서 관리비가 20~30% 차이가 발생한다면 심각한 민원이 될 것이다. 따라서 사업계획승인 시점에 에너지절약계획서를 작성하되 주택법 시행령 제18조로 인한 공사착수가 연장이 되어 2년이 경과 되거나 지연 될 때에는 건축허가 시점에서 현 기준에 의한 에너지절약계획서를 적용하는 것이 국가 에너지계획이나 민원에 대한 미연에 방지책이 될 것이라 생각한다. 에너지절약계획서의 목적과 요소의 기술들이 그 기능을 다하지 못하고 단순히 인, 허가 수순에 지나지 않는다면 많은 인력을 투입하여 검토하고 자문하는 것이 무의미한 시간 손실일 것이다. 정부나 건축주가 에너지 save측면을 공감하고 건물에너지효율을 개선하여야 할 것이다.

리츠와 건설경기, 부동산경기, 주식시장과의 관계 분석 (Relation Analysis Between REITs and Construction Business, Real Estate Business, and Stock Market)

  • 이치주;이강
    • 한국건설관리학회논문집
    • /
    • 제11권5호
    • /
    • pp.41-52
    • /
    • 2010
  • 리츠는 주식시장에 상장되어 있으면서 부동산 개발을 위한 자금조달의 성격과 부동산에 투자하는 특징도 있으므로, 주식 시장과 건설 및 부동산시장과 관계가 있을 것으로 예상할 수 있다. 본 연구에서는 리츠와 주식시장, 건설 및 부동산 경기와 관계된 지표들을 시계열 분석하여, 리츠와의 영향관계를 분석하였다. 시계열 분석은 백터자기회귀모형과 백터오차수정모형을 사용하였으며, 다음의 세 부분으로 분류하여 분석하였다. 첫째, 리츠와 건설 코스피 지수와의 관계를 분석한 결과, 건설 코스피 지수가 리츠에 영향을 주는 것으로 분석되었다. 둘째, 리츠와 건설경기 동행지수인 건축착공면적, 부동산 경기 지수인 오피스 임대지수와 주택매매가격지수와의 관계를 분석하였다. 각 지표들은 서로 인과관계는 없는 것으로 분석되었지만, 리츠와 주택매매가격지수는 서로에게 영향을 주는 것으로 분석되었다. 셋째, 리츠와 건설경기 선행지수인 건축허가면적의 관계를 분석하였다. 두 지표는 서로 인과관계가 없는 것으로 분석되었지만, 건축허가면적이 리츠에 영향을 미치는 것으로 분석되었다. 본 연구를 통해 리츠는 주식시장과 주택경기, 건설경기 선행지표인 건축허가 면적에 영향을 받지만, 건설경기 동행지표인 건축착공면적과 오피스 임대지수에는 상대적으로 영향을 작게 받는 것으로 분석되었다.

건축허가동의 및 사용승인 동의에 대한 순응도 조사 및 제고방안에 관한 연구 (A Study on Adaptability Inquire & Promotable Method for “A Construction Permit Consent & Use Admission Consent”)

  • 이수경;하동명;김태환
    • 한국화재소방학회논문지
    • /
    • 제16권3호
    • /
    • pp.39-47
    • /
    • 2002
  • 정부는 지난 4년간 14,186건의 규제 중 8.121건(57.2%)을 폐지하고 6,065건(42.8%)을 개선하는 등 행정규제를 폐지ㆍ개선하는데 중점을 두고 규제개혁을 추진해 왔다. 이러한 규제개혁의 성과에도 불구하고 관료들의 행태 변화가 뒷받침되지 못하거나, 이해관계 집단의 반발로 인하여 규제개혁 체감도는 이에 미치지 못한다는 비판이 있다. 이에 앞으로는 규제개혁을 지속적으로 추진함은 물론 일반국민ㆍ기업ㆍ집행공무원이 규제의 내용을 명확히 이해하고 준수할 수 있도록 다각적인 규제순응 관리대책을 마련한다는 필요성에 의해 본 연구가 진행되었다. 본 연구에서는 “건축허가 동의 및 사용승인 동의”등의 현황을 파악하고, 규제자집단, 피규제집단, 전문가집단을 대상으로 행정 규제를 제대로 인식하고 있는지, 또한 인정하고 준수하는지 등을 종합적ㆍ체계적으로 분석하여 소방규제의 제고방안을 제시하여 소방행정의 정책수립에 참고자료로 활용하고자 한다.

건축인허가 법규에 따른 BIM 정보 관리 방안 연구 (A Study on the Additional Properties Management Method for Building Code Automated Checking by BIM)

  • 김병주;김규용
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.211-212
    • /
    • 2023
  • Building Information Modeling (BIM) design has been mandatory in Korea since 2016, and it has been gradually expanding in the industry, with a slow attempt to apply it in remodeling constructions. This is because Korea is facing a situation where many buildings are over 30 years old and require remodeling or reconstruction. The remodeling industry is also a growing market, as it saves construction time and cost compared to reconstruction. BIM is an ideal technology element for a competitive remodeling construction, as remodeling constructions face a complicated construction process from the start, including demolition, maintenance, and reinforcement to save the change process. However, there are still limitations in applying BIM to remodeling constructions, due to considerations of the existing building and the complicated requests of the inhabitants. BIM still has technical and environmental limitations for general use. In this study, I analyzed BIM application cases from existing studies and suggest what improvement points should be strengthened.

  • PDF

민자사업의 사업관리 사례분석

  • 이관영;김세종
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.13-19
    • /
    • 2004
  • 민자사업의 사업관리주체는 몇몇 사업을 제외하고는 해당 사업의 시행을 위해서 별도로 설립된 사업시행법인인 경우가 대부분이다. 본 연구에서는 민자사업의 사업관리사례로서 사업시행법인 자체의 조직과 인력을 활용한 발주자CM의 형태로 사업관리를 수행한 서울외곽순환(일산$\~$퇴계원)고속도로 민자사업의 사례를 분석, 제시하고자 하였다. 시간관리의 측면에서 사업시행법인은 시공단계의 단순한 공정관리 틀에서 벗어나 사업의 계획. 설계, 인허가, 시공, 그리고 운영 및 유지관리까지 사업 전단계에 걸친 사업관리주체라는 관전으로 접근하였으며, 비용관리의 측면에서 시공단계의 사업비 증파에 대한 risk의 부담주체는 민간이라는 기본 전제하에 설계VE 등을 통한 사업비 절감요인 도출 등 보다 적극적인 사업비 관리가 요구되었다.

  • PDF

시간제약이 있는 차량경로문제에 대한 개미군집 시스템 해법 (Ant Colony System for Vehicle Routing Problem with Time Window)

  • 이상헌;이승원
    • 한국경영과학회지
    • /
    • 제34권1호
    • /
    • pp.153-165
    • /
    • 2009
  • This paper apollos an ant colony system (ACS) for the vehicle routing problem with time window (VRPTW). The VRPTW is a generalization of the VRP where the service of a customer can begin within the time windows defined by the earliest and latest times when the customer will permit the start of service. The ACS has been applied effectively in geographical environment such as TSP or VRP by meta-heuristic that imitate an ant's biologic special duality in route construction, 3 saving based ACS (SB-ACS) is introduced and its solution is improved by local search. Through iterative precesses, the SB-ACS is shown to drive the best solution. The algorithm has been tested on 56 Solomon benchmarking problems and compared to the best-known solutions on literature. Experimental results shows that SB-ACS algorithm could obtain food solution in total travel distance minimization.

Estimation of the mechanical properties of oil palm shell aggregate concrete by novel AO-XGB model

  • Yipeng Feng;Jiang Jie;Amir Toulabi
    • Steel and Composite Structures
    • /
    • 제49권6호
    • /
    • pp.645-666
    • /
    • 2023
  • Due to the steadily declining supply of natural coarse aggregates, the concrete industry has shifted to substituting coarse aggregates generated from byproducts and industrial waste. Oil palm shell is a substantial waste product created during the production of palm oil (OPS). When considering the usage of OPSC, building engineers must consider its uniaxial compressive strength (UCS). Obtaining UCS is expensive and time-consuming, machine learning may help. This research established five innovative hybrid AI algorithms to predict UCS. Aquila optimizer (AO) is used with methods to discover optimum model parameters. Considered models are artificial neural network (AO - ANN), adaptive neuro-fuzzy inference system (AO - ANFIS), support vector regression (AO - SVR), random forest (AO - RF), and extreme gradient boosting (AO - XGB). To achieve this goal, a dataset of OPS-produced concrete specimens was compiled. The outputs depict that all five developed models have justifiable accuracy in UCS estimation process, showing the remarkable correlation between measured and estimated UCS and models' usefulness. All in all, findings depict that the proposed AO - XGB model performed more suitable than others in predicting UCS of OPSC (with R2, RMSE, MAE, VAF and A15-index at 0.9678, 1.4595, 1.1527, 97.6469, and 0.9077). The proposed model could be utilized in construction engineering to ensure enough mechanical workability of lightweight concrete and permit its safe usage for construction aims.

The First Skyscraper Revisited

  • Ali, Mir M.;Moon, Kyoung Sun
    • 국제초고층학회논문집
    • /
    • 제11권1호
    • /
    • pp.1-14
    • /
    • 2022
  • Debates on what is the first skyscraper have been ongoing from time to time since the construction of the Home Insurance Building in Chicago in 1885, which is generally recognized as the first built skyscraper. This paper attempts to verify this assertion through a detailed investigation after identifying the criteria that characterize a skyscraper. By considering and examining several competing buildings for the title of "first skyscraper" in terms of their levels of satisfying these criteria, the paper reconfirms that the Home Insurance Building in Chicago indeed qualifies as the first skyscraper and is the harbinger of future skyscrapers. By introducing technological and associated architectural innovations in this pioneering building, its designer William Le Baron Jenney paved the way for the construction of future skyscrapers. In traditional construction, heavy masonry walls especially at lower levels did not allow large window openings in exterior walls that would permit ample daylight. For the Home Insurance Building, originally built with 10 stories, Jenney created a metal-framed skeletal structure that carried the building's loads, making the building lighter and allowed for large windows permitting ample natural light to the building's interior. The exterior iron columns were encased in relatively small masonry piers mainly for fireproofing, weather-protection and façade aesthetics. Relying on the structural framing on the building's perimeter, the exterior masonry thus turned into a rudimentary "curtain wall" system, heralding the use of curtain wall construction in future skyscrapers. This building's innovative structural system led to what is known as the "Chicago Skeleton," and eventually produced remarkable skyscrapers all over the world.

건축행정 서비스 개선방안 연구 (A Study on the Improvement of Architectural Administration Service Program)

  • 황은경;문수영
    • 한국주거학회논문집
    • /
    • 제16권5호
    • /
    • pp.99-106
    • /
    • 2005
  • According the high growth of Korean economy, there are many changes in our life recently. As life quality is improved, the standard of construction is strengthen and subdivision. However, in many steps through which it passes until a building is planned, designed, constructed and completed, there are lots of problems among the law related architecture. Especially, there are many statutes which must be checked related to building permits and much wastes time and money in review because of overlapping laws related architecture. Furthermore, there are limitation of computerization and shortage of human power of administration in architecture. In this study, we propose six improvement programme of administration service in architecture. Through these program, civil applications like housing and economic condition could be improved consistently.