• Title/Summary/Keyword: Time of construction permit

Search Result 21, Processing Time 0.023 seconds

CONSTRUCTION OF MANY d-ALGEBRAS

  • Allen, Paul J.
    • Communications of the Korean Mathematical Society
    • /
    • v.24 no.3
    • /
    • pp.361-366
    • /
    • 2009
  • In this paper we consider constructive function triples on the real numbers $\mathbb{R}$ and on (not necessarily commutative) integral domains D which permit the construction of a multitude of d-algebras via these constructive function triples. At the same time these constructions permit one to consider various conditions on these d-algebras for subsets of solutions of various equations, thereby producing geometric problems and interesting visualizations of some of these subsets of solutions. In particular, one may consider what notions such as "locally BCK" ought to mean, certainly in the setting provided below.

A Study on the Feasibility of the Timing for the Implementation of Energy-Saving Plan of Buildings Based on the Approval of Business Plan and Construction Permit (건축물에너지절약계획서의 사업계획승인, 건축허가에 따른 적용시점의 타당성 연구)

  • Kim, Dae-Won;Kim, Young-Il;Chung, Kwang-Seop
    • Journal of Energy Engineering
    • /
    • v.21 no.3
    • /
    • pp.265-270
    • /
    • 2012
  • The delay in the construction permit for the building, which obtained the approval of business proposal, may lead to a difference in the maintenance cost ranging between 20% and 30% in the neighborhood where the residents moved in, along with the new project under construction in the surrounding area amidst rigorous regulations that aim to promote energy-saving and the heightened interest of the public in energy conservation, and such problem would become the major source of serious public complaints. Thus, the energy-saving plan needs to be prepared when the approval is granted to the business plan. In order to prevent public complaints or ensure effectiveness of government's energy plan, it may be effective to apply the energy-saving plan based on current standards upon the award of construction permit when two years have elapsed since the date of the scheduled commencement of construction or when the start of construction is delayed as stipulated in the Article 18 of the Enforcement Decree of Housing Act. If the energy-saving plan and related technologies are merely the parts of license and permit process without fully serving their purposes and functions, it would be waste of time to deploy a lot of workforce and review and seek consultation. The government or owners of buildings need to fully understand the energy-saving aspects and exert effort to enhance the energy efficiency of buildings.

Relation Analysis Between REITs and Construction Business, Real Estate Business, and Stock Market (리츠와 건설경기, 부동산경기, 주식시장과의 관계 분석)

  • Lee, Chi-Joo;Lee, Ghang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.5
    • /
    • pp.41-52
    • /
    • 2010
  • Even though REITs (Real Estate Investment Trusts) are listed on the stock market, REITs have characteristics that allow them to invest in real estate and financing for real estate development. Therefore REITs is related with stock market and construction business and real estate business. Using time-series analysis, this study analyzed REITs in relation to construction businesses, real estate businesses, and the stock market, and derived influence factor of REITs. We used the VAR (vector auto-regression) and the VECM (vector error correction model) for the time-series analysis. This study classified three steps in the analysis. First, we performed the time-series analysis between REITs and construction KOSPI(The Korea composite stock price index) and the result showed that construction KOSPI influenced REITs. Second, we analyzed the relationship between REITs and construction commencement area of the coincident construction composite index, office index and housing price index in real estate business indexes. REITs and the housing price index influence each other, although there is no causal relationship between them. Third, we analyzed the relationship between REITs and the construction permit area of the leading construction composite index. The construction permit area is influenced by REITs, although there is no causal relationship between these two indexes, REITs influenced the stock market and housing price indexes and the construction permit area of the leading composite index in construction businesses, but exerted a relatively small influence in construction starts coincident with the composite office indexes in this study.

A Study on Adaptability Inquire & Promotable Method for “A Construction Permit Consent & Use Admission Consent” (건축허가동의 및 사용승인 동의에 대한 순응도 조사 및 제고방안에 관한 연구)

  • 이수경;하동명;김태환
    • Fire Science and Engineering
    • /
    • v.16 no.3
    • /
    • pp.39-47
    • /
    • 2002
  • The government is propelling regulatory reform in priority that abrogate (8,121 an item in 14,186) improve (6,065 an item in 14,186) administrative regulation. But In spite of many regulatory reform results, successive diminution of regulatory reform is low because that modification of bureaucracy's execution don't support or a concerned group of gain and loss resists. In the future, regulatory reform must perform continuously promote. At the same time, the people, enterprises & public service manage diversified a regulatory adaptation countermeasure. In this study, grasp the present condition at A Construction Permit Consent & Use Admission Consent and would present the promotable method in analysis synthetically & systematically about cognizance, recognition & observance of a administrative regulation.

A Study on the Additional Properties Management Method for Building Code Automated Checking by BIM (건축인허가 법규에 따른 BIM 정보 관리 방안 연구 )

  • Kim, Byung-Joo;Kim, Gyu-Yong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.211-212
    • /
    • 2023
  • Building Information Modeling (BIM) design has been mandatory in Korea since 2016, and it has been gradually expanding in the industry, with a slow attempt to apply it in remodeling constructions. This is because Korea is facing a situation where many buildings are over 30 years old and require remodeling or reconstruction. The remodeling industry is also a growing market, as it saves construction time and cost compared to reconstruction. BIM is an ideal technology element for a competitive remodeling construction, as remodeling constructions face a complicated construction process from the start, including demolition, maintenance, and reinforcement to save the change process. However, there are still limitations in applying BIM to remodeling constructions, due to considerations of the existing building and the complicated requests of the inhabitants. BIM still has technical and environmental limitations for general use. In this study, I analyzed BIM application cases from existing studies and suggest what improvement points should be strengthened.

  • PDF

민자사업의 사업관리 사례분석

  • Lee Kwan-Young;Kim Se-Jong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.13-19
    • /
    • 2004
  • In most PFI(Private Finance Initiative) projects in Korea, the project management are in charge of the Special Purpose Company(SPC) established for carrying out the project. This paper is a case study about an owner CM executed by the organizations and staffs of SPC itself. : Seoulbeltway (Ilsan $\~$ Toegaewon) Private Investment Project. In time management area, the SfC was the leader of project management throughout the life circle - plan, design, permit, construction, operation and maintenance - beyond the schedule manager's role. In cost management area, the methods of reducing the total costs by VE, new technologies, etc. has been needed assuming the construction risks were subject to SPC.

  • PDF

Ant Colony System for Vehicle Routing Problem with Time Window (시간제약이 있는 차량경로문제에 대한 개미군집 시스템 해법)

  • Lee, Sang-Heon;Lee, Seung-Won
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.34 no.1
    • /
    • pp.153-165
    • /
    • 2009
  • This paper apollos an ant colony system (ACS) for the vehicle routing problem with time window (VRPTW). The VRPTW is a generalization of the VRP where the service of a customer can begin within the time windows defined by the earliest and latest times when the customer will permit the start of service. The ACS has been applied effectively in geographical environment such as TSP or VRP by meta-heuristic that imitate an ant's biologic special duality in route construction, 3 saving based ACS (SB-ACS) is introduced and its solution is improved by local search. Through iterative precesses, the SB-ACS is shown to drive the best solution. The algorithm has been tested on 56 Solomon benchmarking problems and compared to the best-known solutions on literature. Experimental results shows that SB-ACS algorithm could obtain food solution in total travel distance minimization.

Estimation of the mechanical properties of oil palm shell aggregate concrete by novel AO-XGB model

  • Yipeng Feng;Jiang Jie;Amir Toulabi
    • Steel and Composite Structures
    • /
    • v.49 no.6
    • /
    • pp.645-666
    • /
    • 2023
  • Due to the steadily declining supply of natural coarse aggregates, the concrete industry has shifted to substituting coarse aggregates generated from byproducts and industrial waste. Oil palm shell is a substantial waste product created during the production of palm oil (OPS). When considering the usage of OPSC, building engineers must consider its uniaxial compressive strength (UCS). Obtaining UCS is expensive and time-consuming, machine learning may help. This research established five innovative hybrid AI algorithms to predict UCS. Aquila optimizer (AO) is used with methods to discover optimum model parameters. Considered models are artificial neural network (AO - ANN), adaptive neuro-fuzzy inference system (AO - ANFIS), support vector regression (AO - SVR), random forest (AO - RF), and extreme gradient boosting (AO - XGB). To achieve this goal, a dataset of OPS-produced concrete specimens was compiled. The outputs depict that all five developed models have justifiable accuracy in UCS estimation process, showing the remarkable correlation between measured and estimated UCS and models' usefulness. All in all, findings depict that the proposed AO - XGB model performed more suitable than others in predicting UCS of OPSC (with R2, RMSE, MAE, VAF and A15-index at 0.9678, 1.4595, 1.1527, 97.6469, and 0.9077). The proposed model could be utilized in construction engineering to ensure enough mechanical workability of lightweight concrete and permit its safe usage for construction aims.

The First Skyscraper Revisited

  • Ali, Mir M.;Moon, Kyoung Sun
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.1
    • /
    • pp.1-14
    • /
    • 2022
  • Debates on what is the first skyscraper have been ongoing from time to time since the construction of the Home Insurance Building in Chicago in 1885, which is generally recognized as the first built skyscraper. This paper attempts to verify this assertion through a detailed investigation after identifying the criteria that characterize a skyscraper. By considering and examining several competing buildings for the title of "first skyscraper" in terms of their levels of satisfying these criteria, the paper reconfirms that the Home Insurance Building in Chicago indeed qualifies as the first skyscraper and is the harbinger of future skyscrapers. By introducing technological and associated architectural innovations in this pioneering building, its designer William Le Baron Jenney paved the way for the construction of future skyscrapers. In traditional construction, heavy masonry walls especially at lower levels did not allow large window openings in exterior walls that would permit ample daylight. For the Home Insurance Building, originally built with 10 stories, Jenney created a metal-framed skeletal structure that carried the building's loads, making the building lighter and allowed for large windows permitting ample natural light to the building's interior. The exterior iron columns were encased in relatively small masonry piers mainly for fireproofing, weather-protection and façade aesthetics. Relying on the structural framing on the building's perimeter, the exterior masonry thus turned into a rudimentary "curtain wall" system, heralding the use of curtain wall construction in future skyscrapers. This building's innovative structural system led to what is known as the "Chicago Skeleton," and eventually produced remarkable skyscrapers all over the world.

A Study on the Improvement of Architectural Administration Service Program (건축행정 서비스 개선방안 연구)

  • Hwang, Eun-Kyoung;Moon, Soo-Yong
    • Journal of the Korean housing association
    • /
    • v.16 no.5
    • /
    • pp.99-106
    • /
    • 2005
  • According the high growth of Korean economy, there are many changes in our life recently. As life quality is improved, the standard of construction is strengthen and subdivision. However, in many steps through which it passes until a building is planned, designed, constructed and completed, there are lots of problems among the law related architecture. Especially, there are many statutes which must be checked related to building permits and much wastes time and money in review because of overlapping laws related architecture. Furthermore, there are limitation of computerization and shortage of human power of administration in architecture. In this study, we propose six improvement programme of administration service in architecture. Through these program, civil applications like housing and economic condition could be improved consistently.