The growing demand for the real time traffic information is bringing about the category and number of traffic collection mechanism in the era of ITS. There are, however, two problems in making data into information using various traffic data. First, the information making process of making data into the representative information, for each traffic collection mechanism, for the specified analysis periods is required. Second, the integration process of fusing each representative information into "the information" for each link out of each source is also required. That is, both data reduction and/or data to information process and information fusion are required. This article is focusing on the development of information fusing algorithm based on voting technique, fuzzy regression, and, Bayesian pooling technique for estimating the dynamic link travel time of networks. The proposed algorithm has been validated using the field experiment data out of GPS probes and detectors over the roadways and the estimated link travel time from the algorithm is proved to be more useful than the mere arithmetic mean from each traffic source.
Journal of Construction Engineering and Project Management
/
제3권4호
/
pp.1-4
/
2013
Excavation is most commonly used activity in all construction projects. All contracting agencies prefer to use bigger and heavier excavators and dumpers on site to do excavations if quantity of excavation is huge. Estimation of required number of excavators and dumpers for completion of excavation could be rather a tedious process involving repetitive calculation on which professionals spend their valuable time. As the Information Technology is highly involved in construction section there os need to have IT model for estimation of number of excavators and dumpers. The developed model is useful to calculate required equipments within short period of time. The purpose of the developed IT model is to save the time and efforts of the construction professional. The paper discusses about model which can be used on site to estimate numbers of excavators and dumpers required for completion of certain quantity of excavation within the given time. The calculation considers various existing formulas and method to generate the output. This information could certainly be useful in planning equipments on construction project sites. The tool is user friendly where any non IT background person can use it on construction sites.
When a new counting experiment is proposed, it is crucial to predict whether the desired source signal will be detected, or how much observation time is required in order to detect the signal at a certain significance level. The concept of the a priori prediction of the detection limit in a newly proposed experiment should be distinguished from the a posteriori claim or decision whether a source signal was detected in an experiment already performed, and the calculation of statistical significance of a measured source signal. We formulate precise definitions of these concepts based on the statistical theory of hypothesis testing, and derive an approximate formula to estimate quickly the a priori detection limit of expected Poissonian source signals. A more accurate algorithm for calculating the detection limits in a counting experiment is also proposed. The formula and the proposed algorithm may be used for the estimation of required integration or observation time in proposals of new experiments. Applications include the calculation of integration time required for the detection of faint emission lines in a newly proposed spectroscopic observation, and the detection of faint sources in a new imaging observation. We apply the results to the calculation of observation time required to claim the detection of the surface thermal emission from neutron stars with two virtual instruments.
도시철도 주요구간에서는 상습적인 지연 및 후행열차로의 지연파급확산으로 구간운행시분 증대 및 정시운행 불가, 나아가 혼잡증대로 인해 이용승객이 불편이 가중되고 있다. 운행계획은 승객과의 약속이자 타 자원운영계획과 연계하여 신뢰성이 확보되어야 한다. 고밀도 운행 도시철도의 경우 정차시분이 운행시격에 미치는 영향이 가장 크며, 효율적 서비스계획 수립 시 정차시분의 관리는 매우 중요하다. 본 논문에서는 도시철도 분야의 정차시분 관련 선행연구동향을 살펴보고, 국내 운영기관 환경에서 실용적으로 활용할 수 있는 최소소요 정차시분 추정모델과 실제 현장데이터를 활용하여 수치사례를 함께 제시한다.
Purpose: This study was conducted with the aim of presenting spatial planning directions for evacuation spaces based on an analysis of the performance of horizontal evacuation during the early stages of fire incidents in a geriatric hospital. Methods: Based on a review of previous studies, the research model was designed by establishing occupancy conditions, evacuation, and fire scenarios. The analysis model was developed by considering vulnerable areas in terms of evacuation movement and analyzing the results of evacuation performance. Furthermore, the study analyzed the improvement in evacuation performance by arranging refuge areas. Results: The results of the study are as follows. Firstly, vulnerability spots were identified in terms of evacuation performance by schematizing Required Safe Egress Time, Available Safe Egress Time, and their differences. Secondly, the Required Safe Egress Time in the adjacent public spaces along the escape routes of occupants was found to be higher compared to the Available Safe Egress Time. Thirdly, the results of the correlation analysis between the difference in Available Safe Egress Time and Required Safe Egress Time during the early stages of a fire, as well as their constituent factors, demonstrated that user congestion is a more significant factor in compromising evacuation safety than the physical changes in the fire condition. Fourthly, the analysis of evacuation time was conducted by designating refuge areas where occupants can evacuate within a sufficient timeframe. This led to a decrease in the Required Safe Egress Time. Implications: This study is expected to be used as data on the direction of evacuation space planning to improve the evacuation performance of Geriatric Hospital.
소요장치량은 컨테이너터미널의 장치능력을 결정짓는 매우 중요한 의사결정 변수이다. 일반적으로 소요장치량은 모선의 배선간격, 장치허용기간, 본선작업시간 등 여러 요인들에 좌우된다. 그러나 지금까지는 이들 요인이 확정적이라는 가정 하에 다양한 방법들을 소요장치량 산정에 적용해왔다. 본 연구는 본선작업 물량이 확률적인 것으로 가정하고 서비스수준을 만족시키는 소요장치량의 산정 방법을 제시했다. 시뮬레이션을 이용한 수치실험은 제시된 방법이 다른 방법들에 비해 확률적 상황에서 더욱 정확한 소요장치량을 산정할 수 있음을 보여주었다.
The purpose of this study is to categorize elderly people's behavior using the questionnaire filling up by oneself for 24hours and to analyze the time required according to behavior and space. Also, through analytical researches, we find a way to develop smart home service. In this study, we carry out a questionnaire targeting a number of 20 elderly people. The questionnaire is to survey elderly people's behaviors for 24hours. Questionnaire items consist of three parts : items for checking time required about a daily behavior, items for analyzing a space in daily lives, generalities. This study is analyzed through descriptive statistics. The results of this study were as follows. Firstly, the elderly people's behaviors were eight categories. Among these behavior's categories, the highest portion is the behavior related to Individual maintenance such as sleep, personal hygiene, nap, etc. by 49%. Secondly, the portion of time required in residence based on daily lives is higher than outside of residence by 73%. Lastly, analyzing each space in residence focused on time required of elderly people's behaviors, bed room is the highest portion by 49%, and followed by living room with 29% and kitchen with 15%, and bath room with 7%.
The object of research is detecting and eliminating the unsafty factor in shortest time through a decision making simulation under uncertainty using simulation method The decision making simulation using C language Is used to analyze data from several factors which affects the crane breakdown under unsafe situation. Through this research, the following conclusions are obtained. first, the safety manager or the person can estimate the time required to handle the unsafe factors. Secondly, The decision making can be accomplished by minimizing the time required under uncertainty by analyzing them.
The purpose of this study is to present an alternative plan in order to reduce the required time to flee from the inside of the gosiwon in danger. The data were derived from changing the width of corridors and emergency exits and the number of stairs in the building EXODUS, which is computer simulation program, The analyzed conclusions from the data are following as below (1) Increasing the exits and the number of stairs are efficient to reduce the accumulated time for standing by. (2) Increasing the number of stairs is efficient to decrease the distance to get out of the building to exit. (3) Increasing the number of stairs is efficient to reduce the time to get out of the building to exit.
The purpose of this study is the examination of the possibility as grasping the circumstance which is the time required from programming to design process in schools which are established newly and investigating the consciousness of the user's participation, because we need a user participation process in the programming to design process to improve the level of design. The above-mentioned purpose is the reason that this study composes the second grade. This study shows the entirely necessary time to work each step as collecting the data of programming-design process to 33 schools which are established for 4 years between 2002 and 2005 by Busan metropolitan city office of education, and the reason why they need a time each step. As the result of this study, the school established by the purpose of land development business takes more time than the school of learning environment improvement and of reconstruction & transfer case. Because of the change of land for school, we have to take a cautious approach to select the land for school in the future when developing the land. The time required from programming to design process in reconstruction & transfer case is the shortest even though it is different a little according to the kind of schools.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.