• Title/Summary/Keyword: Time Budget

Search Result 784, Processing Time 0.03 seconds

A Study on Budget Decision Model for Initial Provisioning Spare Parts (초기보급 예비부품을 위한 예산결정 모델연구)

  • Hwang Heung-Seok
    • Journal of the military operations research society of Korea
    • /
    • v.16 no.2
    • /
    • pp.75-82
    • /
    • 1990
  • When the new equipment or weapon system is introduced to the operating unit its repair facilities and spare parts supply channels are not regularly generated. therefore, its required spare parts are initially supplied at the same time when the main equipment is deployed. For these circumstances, we are faced with the following problems : the first one is to decide the budget amounts to acquire the spare parts, the second is to choose the amounts of initial provisioning spare parts, and the third one is how to allocate the given budget for the initial provisioning spare parts. This paper emphasizes on determining the budget amounts, but also suggests the spare parts allocating methods.

  • PDF

A Study on Purchasing Behaviors of Budget-priced Cosmetic (초저가 화장품의 구매행동에 관한 연구)

  • Hyun, Jung-Hee;Choo, Tae-Gue
    • Fashion & Textile Research Journal
    • /
    • v.7 no.6
    • /
    • pp.617-623
    • /
    • 2005
  • The purpose of this study was to examine the consumers' purchasing behaviors of budget-priced cosmetics. Questionnaires used for this study were composed of 44 questions including 9 questions about budget-priced cosmetic purchasing behavior, 15 questions about satisfaction, 15 questions about repeat purchasing intention, 1 question about the reason of satisfaction or dissatisfaction, and four questions about demographic variables. Questionnaires were administrated to 317 people who were Daegu & Kyungpook region residents and had shopping experience on budget-priced cosmetics during 2 weeks from March 2005. Respondents' age was limited from 20 to 40. Data were analyzed by using correlation, crosstabulation analysis, and frequency analysis utilizing SPSS/WIN. The results were as follows. Consumers went to budget-priced cosmetics' shops 'for low price', 'for trial' and 'for curiosity'. The best purchased products among the budget-priced cosmetics were basic cosmetics, and the second purchased products were make-up cosmetics. 41.4% of the whole respondents answered that they spent 5,000~10,000won per one time visit, and 65% of those answered they visited once or twice per a year and once per two or three months. In this study a level of satisfaction for the entire products, consumers neither unsatisfied nor fully satisfied. For the question of the intention to repurchase for the budget-priced cosmetics, the respondents answered that they will not positively purchase again. A level of satisfaction and the intention to repurchase had positive correlations. The reason which consumers satisfied with the products was chiefly related to price and that which consumers unsatisfied the products was related to products themselves.

A Study on the Key Factors Affecting Travel Time Budget for Elderly Pedestrians (고령자 통행시간예산의 영향요인 규명에 관한 연구)

  • Choi, Sung-taek;Kim, Su-jae;Jang, Jin-young;Lee, Hyang-sook;Choo, Sang-ho
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.14 no.4
    • /
    • pp.62-72
    • /
    • 2015
  • Nowadays the issue of aging society has received considerable critical attention, especially in transportation planning and demand forecasting. This study identified the factors related to travel time budget for elderly by purpose using seemingly unrelated regression model (SUR model). The SUR model is suitable when error terms of each equation are assumed to be correlated across the equations in terms of travel time budget which is constant in 2 hours per day commonly. The results showed that elderly's travel time budget was affected by individual, household, urban facility and transportation service. The leisure travel comprised a large proportion of total travel time and had a positive relationship with elderly, sports, religious facilities. Moreover, the elderly who had low income or unemployed person had low frequency of social activity such as leisure, shopping and business. This study can provide a comprehensive implications of forecasting the future travel demand and analyzing the travel behavior.

An Approximation Approach for A Multi-Product Continuous Review Inventory Problem with Budget Constraint (예산의 계약이 있는 다품종 연속적 재고 관리 문제에서 추정을 통한 해법)

  • Lee, Dong-Ju;Yoo, Jae-Wook;Lee, Moon-Su
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.31 no.4
    • /
    • pp.134-139
    • /
    • 2008
  • Most approaches for continuous review inventory problem need tables for loss function and cumulative standard normal distribution. Furthermore, it is time-consuming to calculate order quantity (Q) and reorder point (r) iteratively until required values are converged. The purpose of this paper is to develop a direct method to get the solution without any tables. We used approximation approaches for loss function and cumulative standard normal distribution. The proposed method can get the solution directly without any iterative procedure for Q, r and without any tables. The performance of the proposed approach is tested by using numerical examples. The budget constraint of this paper assumes that purchasing costs are paid at the time an order is arrived. This constraint can be easily replaced by capacity constraint or budget constraint in which' purchasing costs are paid at the time an order is placed.

Development of a Nutrient Budget Model for Livestock Excreta Survey (가축분뇨실태조사를 위한 양분수지 산정 모델 개발)

  • Kim, Deok-Woo;Ryu, Hong-Duck;Lim, Do Young;Chung, Eu Gene;Kim, Yongseok
    • Journal of Korean Society on Water Environment
    • /
    • v.33 no.6
    • /
    • pp.769-779
    • /
    • 2017
  • Nutrient (i.e., nitrogen and phosphorus) budgets are required under a 'Livestock Excreta Survey'. A nutrient budget is one of the agri-environmental indicators that calculates the difference between the inputs and outputs of the amount of nutrients within a certain boundary and for a certain time period (e.g., 1 year). In this study, a nutrients budget model was developed to effectively determine the surplus of nutrients within a region in Korea. The C# program language was used in order to facilitate the deployment of a graphical user interface (GUI) and to enhance compatibility. Also, the model was developed on Windows OS, which is the commonly used operating system in Korea. The model was based on the OECD/Eurostat nutrient budget method, and it was modified to consider manure composting procedures as well. There are key features of the nutrient budget model, including directly use of the original data sets from various input and output sources, and a collectively exchange of the address in different formats. The model can quickly show the results of various spatial and temporal resolutions with the same data, as well as perform a sensitivity analysis with coefficients and easily compareresults using tables and graphs. Further, it would be necessary to study the extension of the scope of utilization, such as the application of various nutrient budget methods. It would also be helpful to investigate both pre and postprocessing information such as linking input data through online systems.

Regional Application of the OECD Nitrogen Budget Considering Livestock Manure Compost (국내 가축분뇨 자원화 특성을 고려한 OECD 질소수지 산정법의 지역단위 적용 연구)

  • Lim, Do Young;Ryu, Hong-Duck;Chung, Eu Gene;Kim, Yongseok;Lee, Jae Kwan
    • Journal of Korean Society on Water Environment
    • /
    • v.33 no.5
    • /
    • pp.546-555
    • /
    • 2017
  • The Nutrient budget is one of the agricultural-environment indicators of OECD. A nutrient budget measures the surplus as the differential between the inputs and the outputs of within a certain boundary and within a specified period of time (i.e. one year). According to OECD, the annual nitrogen budget for Korea was $245kg\;N\;ha^{-1}$ in 2014, which corresponds to the first position among OECD countries. In Korea in 2014, about 90 % of livestock excreta was composted as solid and liquid manure, which are usually and customarily spread on agricultural land. The objectives of this study are intended to suggest methodology of the regional nitrogen budget as a nitrogen management tool, which considers conversion from raw excreta to composted manures based on the methodology of OECD/Eurostat, and application of the new method in an agricultural region of Korea. As a result, the calculated excess rate of hydrospheric nitrogen surplus was $251kg\;N\;ha^{-1}$ (in the region in 2014), which indicates the presence of potential risks emanating from excessive nitrogen, with regard to both export water and soil environments. The findings also assert that this was shown to be one of the most important elements in the nitrogen budget, which translates to the actual amounts of nitrogen lost during the solid composting process. To better understand the process and the reliability of the method, it is necessary to analyze the sensitivity of the relevant co-efficients used in the method in the near future.

Development of Optimal Rehabilitation Model for Water Distribution System Based on Prediction of Pipe Deterioration (II) - Application and Analysis - (상수관로의 노후도 예측에 근거한 최적 개량 모형의 개발 (II) - 적용 및 분석 -)

  • Kim, Eung-Seok;Park, Moo-Jong;Kim, Joong-Hoon
    • Journal of Korea Water Resources Association
    • /
    • v.36 no.1
    • /
    • pp.61-74
    • /
    • 2003
  • This study(II) apply to the A city by using the optimal rehabilitation model based on the deterioration prediction of the water distribution system proposed the study(I). The deterioration prediction model divides factors into 14 factors with digging and experiment and 9 factor without digging and experiment and calculate the deterioration degree. The application results of the deterioration prediction model show that a difference of the deterioration degree according to factor numbers is within 1~2%. Also, the model can predict the deterioration degree of each pipe without digging and experiment. The optimal rehabilitation model is divided into the optimal residual durability of each deterioration factor and budget constraint or not. The application result is as follow: the rehabilitation time and cost increase according to the increasing of the optimal residual durability. When compared the model with budget constraint and model without budget constraint, the former model increase the cost of total contents. In case of budget constraint, the increasing tendency is concluded that the pipe rehabilitation is executed in same budget every year in condition that every rehabilitation cost do not exceed the every year budget within the optimal residual durability.

Determination of Optimal Time to Replace On-S Water Pipeline by Analyzing Water Main Failures and Economical Efficiency (수도사고 분석 및 경제성 평가를 통한 상수관로 최적 교체시기 결정)

  • Kim, Jong-Sin;Jung, Kwan-Sue;Bae, Chul-Ho;Lee, Doo-jin
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.23 no.3
    • /
    • pp.279-285
    • /
    • 2009
  • In this study, applied to the industrial water service, it is verified feasibility of break-even analysis method which has not been introduced in Korea. The On-san water pipeline of 7.1km among the Ul-san industrial water service is selected and the optimal replacement time calculated by break-even analysis method is year 2033 to 2044 which will be 53 to 67 years since the pipes were buried. If indirect cost such as the value of lost water and traffic disruption, service interruption, etc. is calculated as 30 and 100% of the direct cost, the financially optimum replacement time is advanced 3 to 9 years. These ways present rational criteria to establish long-term plan for budget and to execute the limited budget efficiently.

A Strategic Decision Making Model Using Project Scheduling Technique (프로젝트 일정관리기법을 활용한 전략적 의사결정모형)

  • Ahn Tae-Ho
    • Management & Information Systems Review
    • /
    • v.13
    • /
    • pp.127-140
    • /
    • 2003
  • Although there have been continual researches in the project scheduling problems since 1960s, the main interest has been how to improve the efficiency of a single project. The minimization problem of the project completion time given a preassigned budget might be an example. This kind of the problem is important, but estimating of the proper budget for a project may also be very important. This research deals with the budget allocation problem for the multiple project. This research is unique in that the project scheduling techniques are used for the budgeting problem. Therefore, this research may be used as a strategic decision model for the multiple large projects in public sector.

  • PDF