• Title/Summary/Keyword: Time/Space scheduling

Search Result 115, Processing Time 0.024 seconds

조선 산업에서의 정반배치 계획시스템 개발의 효율화에 관한 연구

  • 박주호;박주철
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2001.10a
    • /
    • pp.283-285
    • /
    • 2001
  • The most work-space invest much time and labor for optimal arrangement. The work-plates of the work-space should be arranged, processed and assembled under the restricted work space. The optimal arrangement under the terms of a restriction arrange the maximum work-plates in appointed work-space. It's the central aim. The work-plates arrangement scheduling of the most work-space are achieved through the experience of the planner. Like this, if the work-plates arrangement is worked by hand, there spend much time for the training planner. And the burden of the personnel expenses occur for using the master worker, also there are dangerous factors to be able to bring the bottleneck circumstance for the process planning, because the quick work planning does not accomplish. With such problems, the biggest problem is inferior the value of the plan. For solved the such problem of hand-operating, some work-spaces developed and used the work-plate arrangement scheduling system for the special quality of themselves. This paper make research into a plan to develop the work-plate arrangement scheduling system efficiently.

  • PDF

Heuristic Algorithms for Resource Leveling in Pre-Erection Scheduling and Erection Scheduling of Shipbuilding (조선 선행탑재 및 탑재 일정계획에서의 부하평준화를 위한 발견적 기법)

  • Woo, Sang-Bok;Ryu, Hyung-Gon;Hahn, Hyung-Sang
    • IE interfaces
    • /
    • v.16 no.3
    • /
    • pp.332-343
    • /
    • 2003
  • This paper deals with pre-erection scheduling and erection scheduling in shipbuilding. Among shipbuilding scheduling, the ship erection scheduling in a dock is one of the most important since the dock is the most critical resource in a shipyard. However, it is more reasonable to consider pre-erection scheduling and erection scheduling as unified because they compete with the common constrained resources such as labor, crane, space, and so on. It is very hard to consider two scheduling problems simultaneously, and hence, we approach them sequentially. At first, we propose space resource leveling heuristics in pre-erection scheduling given erection date. And then, considering the manpower resource determined by pre-erection scheduling, we also propose manpower resource leveling heuristics in erection scheduling. Various experimental results with real world data show that the proposed heuristics have good performance in terms of scheduling quality and time.

A Study on Low Power Force-Directed scheduling for Optimal module selection Architecture Synthesis (최적 모듈 선택 아키텍쳐 합성을 위한 저전력 Force-Directed 스케쥴링에 관한 연구)

  • Choi Ji-young;Kim Hi-seok
    • Proceedings of the IEEK Conference
    • /
    • 2004.06b
    • /
    • pp.459-462
    • /
    • 2004
  • In this paper, we present a reducing power consumption of a scheduling for module selection under the time constraint. A a reducing power consumption of a scheduling for module selection under the time constraint execute scheduling and allocation for considering the switching activity. The focus scheduling of this phase adopt Force-Directed Scheduling for low power to existed Force-Directed Scheduling. and it constructs the module selection RT library by in account consideration the mutual correlation of parameters in which the power and the area and delay. when it is, in this paper we formulate the module selection method as a multi-objective optimization and propose a branch and bound approach to explore the large design space of module selection. Therefore, the optimal module selection method proposed to consider power, area, delay parameter at the same time. The comparison experiment analyzed a point of difference between the existed FDS algorithm and a new FDS_RPC algorithm.

  • PDF

Analysis of Boundary Conditions for Activities' Relationships in Linear Scheduling Model (선형 공정계획 모델의 액티비티 관계의 경계조건 분석)

  • Ryu, Han-Guk;Kim, Tae-Hui
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.23-32
    • /
    • 2011
  • Domestic leading construction companies has been establishing and performing TACT scheduling method, similar to linear scheduling model such as line of balance and repetitive schedule, and etc. in which repetitive construction works are involved like high-rise building. Linear scheduling model has been researched as a visual scheduling method presenting the work space and time information. Likewise scheduling constraints of CPM network such as finish-to-finish, start-to-start, finish-to-start, start-to-start, linear scheduling model also has the relationships constraints, namely boundary conditions, between activities. It is especially necessary to define the boundary conditions of the activities' relationships in order to apply the linear scheduling model to be compatible with the network schedule. Therefore, this research considers the boundary conditions between activities for establishing the linear scheduling model. This paper also applies the proposed boundary conditions to TACT schedule and then deduces the main considerations in order to establish and perform TACT schedule.

Genetic algorithm-based scheduling for ground support of multiple satellites and antennae considering operation modes

  • Lee, Junghyun;Kim, Haedong;Chung, Hyun;Ko, Kwanghee
    • International Journal of Aeronautical and Space Sciences
    • /
    • v.17 no.1
    • /
    • pp.89-100
    • /
    • 2016
  • Given the unpredictability of the space environment, satellite communications are manually performed by exchanging telecommands and telemetry. Ground support for orbiting satellites is given only during limited periods of ground antenna visibility, which can result in conflicts when multiple satellites are present. This problem can be regarded as a scheduling problem of allocating antenna support (task) to limited visibility (resource). To mitigate unforeseen errors and costs associated with manual scheduling and mission planning, we propose a novel method based on a genetic algorithm to solve the ground support problem of multiple satellites and antennae with visibility conflicts. Numerous scheduling parameters, including user priority, emergency, profit, contact interval, support time, remaining resource, are considered to provide maximum benefit to users and real applications. The modeling and formulae are developed in accordance with the characteristics of satellite communication. To validate the proposed algorithm, 20 satellites and 3 ground antennae in the Korean peninsula are assumed and modeled using the satellite tool kit (STK). The proposed algorithm is applied to two operation modes: (i) telemetry, tracking, and command and (ii) payload. The results of the present study show near-optimal scheduling in both operation modes and demonstrate the applicability of the proposed algorithm to actual mission control systems.

Scheduling for a Flexible Manufacturing Cell with Transportation Time (유연가공셀에서 운반시간을 고려한 일정계획)

  • 최정상;노인규
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.19 no.2
    • /
    • pp.107-118
    • /
    • 1994
  • This research is concerned with production scheduling for a flexible manufacturing cell which consists of two machine centers with unlimited buffer space and a single automatic guided vehicle. The objective is to develop and evaluate heuristic scheduling procedures that minimize maximum completion time. A numerical example illustrates the proposed algorithm. The heuristic algorithm is implemented for various cases by SLAM II. The results show that the proposed algorithm provides better solutions than Johnson's. It also gets good solutions to minimize mean flowtime.

  • PDF

Multi-functional Fighter Radar Scheduling Method for Interleaved Mode Operation of Airborne and Ground Target (전투기탑재 다기능 레이다의 공대공 및 공대지 동시 운용 모드를 위한 스케줄링 기법)

  • Kim, Do-Un;Lee, Woo-Cheol;Choi, Han-Lim;Park, Joontae;Park, Junehyune;Seo, JeongJik
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.49 no.7
    • /
    • pp.581-588
    • /
    • 2021
  • This paper deals with a beam scheduling method in fighter interleaving mode. Not only the priority of tasks but also operational requirements that air-to-ground and air-to-air search tasks should be executed alternatively are established to maximize high-quality of situational awareness. We propose a real-time heuristic beam scheduling method that is advanced from WMDD to satisfies the requirements. The proposed scheduling method is implemented in a simulation environment resembling the task processing mechanism and measurement model of a radar. Performance improvement in terms of task delay time is observed.

Deterministic Multi-dimensional Task Scheduling Algorithms for Wearable Sensor Devices

  • Won, Jong-Jin;Kang, Cheol-Oh;Kim, Moon-Hyun;Cho, Moon-Haeng
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.8 no.10
    • /
    • pp.3423-3438
    • /
    • 2014
  • In recent years, wearable sensor devices are reshaping the way people live, work, and play. A wearable sensor device is a computer that is subsumed into the personal space of the user, and is always on, and always accessible. Therefore, among the most salient aspects of a wearable sensor device should be a small form factor, long battery lifetime, and real-time characteristics. Thereby, sophisticated applications of a wearable sensor device use real-time operating systems to guarantee real-time deadlines. The deterministic multi-dimensional task scheduling algorithms are implemented on ARC (Actual Remote Control) with relatively limited hardware resources. ARC is a wearable wristwatch-type remote controller; it can also serve as a universal remote control, for various wearable sensor devices. In the proposed algorithms, there is no limit on the maximum number of task priorities, and the memory requirement can be dramatically reduced. Furthermore, regardless of the number of tasks, the complexity of the time and space of the proposed algorithms is O(1). A valuable contribution of this work is to guarantee real-time deadlines for wearable sensor devices.

Air-traffic dispatching scheduling in terminal airspace (공항접근영역 항공교통 Dispatching 스케줄링 연구)

  • Jeong, Sun-Jo;Cho, Doo-Hyun;Choi, Han-Lim
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.44 no.11
    • /
    • pp.973-980
    • /
    • 2016
  • An air traffic management (ATM) has been studied in a variety of fields to utilize an air traffic capacity efficiently and solve a congested air traffic situation due to an increment of an air traffic demand. In this paper, an air traffic management, which is related with controlling and determining the sequencing of an aircraft approaching to an airport, in terminal control area is studied. This paper focuses on scheduling algorithms with a given problem for the air traffic management with operational constraints, such as a space separation, an overtaking on the same air-route, and a route merge point (a scheduling point). For a real-time calculation, the presented algorithms focus on dispatching heuristic rules which are able to assign tasks in a fast time period with an adequate performance, which can be demonstrated as a proper and realistic scheduling algorithm. A simulation result is presented to illustrate the validity and applicability of the proposed algorithm. Each scheduling rule is analyzed on the same static and dynamic air traffic flow scenario with the ATM Monte-Carlo simulation.

USING GIS TO IMPROVE ROADWAY CONSTRUCTION PLANNING

  • Sanghyeok Kang;Jongwon Seo
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.643-648
    • /
    • 2005
  • The planning process for roadway construction involves a large amount of information on design, construction methods, quantities, unit costs, production rates, and site conditions. Therefore, it is very important to acquire, manage, and process the necessary information efficiently to produce a rigorous construction plan. GIS (Geographic Information System) is a very effective tool for integrating and managing various types of information including spatial and non-spatial data required for roadway construction planning. This paper proposes a GIS-based system for improving roadway construction planning with its 'Interactive Space Scheduling' and 'Operation Level Planning' functions. The proposed system can assist construction planners in a unique way by integrating design and construction information and creating modularized design elements for space scheduling in real time. It is expected that the proposed system could improve the efficiency of roadway construction planning.

  • PDF