Journal of the Korean Operations Research and Management Science Society (한국경영과학회지)
- Volume 19 Issue 2
- /
- Pages.107-118
- /
- 1994
- /
- 1225-1119(pISSN)
- /
- 2733-4759(eISSN)
Scheduling for a Flexible Manufacturing Cell with Transportation Time
유연가공셀에서 운반시간을 고려한 일정계획
Abstract
This research is concerned with production scheduling for a flexible manufacturing cell which consists of two machine centers with unlimited buffer space and a single automatic guided vehicle. The objective is to develop and evaluate heuristic scheduling procedures that minimize maximum completion time. A numerical example illustrates the proposed algorithm. The heuristic algorithm is implemented for various cases by SLAM II. The results show that the proposed algorithm provides better solutions than Johnson's. It also gets good solutions to minimize mean flowtime.
Keywords