Multi-functional Fighter Radar Scheduling Method for Interleaved Mode Operation of Airborne and Ground Target |
Kim, Do-Un
(Korea Advanced Institute of Science and Technology)
Lee, Woo-Cheol (Korea Advanced Institute of Science and Technology) Choi, Han-Lim (Korea Advanced Institute of Science and Technology) Park, Joontae (LIG Nex1) Park, Junehyune (LIG Nex1) Seo, JeongJik (Agency for Defense Development) |
1 | Sabatini, S. and Tarantino, M., Multifunction array radar-System design and analysis, Artech House, Norwood, MA, 1994. |
2 | Genovese, A. F., "The interacting multiple model algorithm for accurate state estimation of maneuvering targets," Johns Hopkins APL technical digest, Vol. 22, No. 4, 2001, pp. 614~623. |
3 | Singer, R. A., "Estimating optimal tracking filter performance for manned maneuvering targets," IEEE Transactions on Aerospace and Electronic Systems, No. 4, 1970, pp. 473~483. DOI |
4 | Tyagi, N., Tripathi, R. P. and Chandramouli, A. B., "Single machine scheduling model for total weighted tardiness," Indian Journal of Science and Technology, Vol. 9, No. 31, 2016. |
5 | Kim, D. U., Park, Y. J., Choi, H. L., Ryu, S. H. and Hong, Y., J., "Adaptive Radar Resource Managing Method Considering Hostile Airborne Targets in Air-to-Air and Air-to-Surface Interleaving Mode," Proceeding of The Korean Society for Aeronautical and Space Sciences Fall Conference, November 2018, pp. 1315~1316. |
6 | McIntyre, G. A. and Hintz, K. J., "Comparison of several maneuvering target tracking models," Signal processing, sensor fusion, and target recognition VII, International Society for Optics and Photonics, Vol. 3374, 1998, pp. 48~63. |
7 | Lee, W. C. and Choi, H. L., "Track Management for Distributed Multi-target Tracking in Sensor Network," International Conference on Robot Intelligence Technology and Applications, Springer, Singapore, 2018, pp. 152~163. |
8 | Valente, J. M. and Schaller, J. E., "Dispatching heuristics for the single machine weighted quadratic tardiness scheduling problem," Computers & Operations Research, Vol. 39, No. 9, 2012, pp. 2223~2231. DOI |
9 | Baker, K. R. and Kanet, J. J., "Job shop scheduling with modified due dates," Journal of Operations Management, Vol. 4, No. 1, 1983, pp. 11~22. DOI |
10 | Taner, M. R., Karasan, O. E. and Yavuzturk, E., "Scheduling Beams with Different Priorities on a Military Surveillance Radar," IEEE Transactions on Aerospace and Electronic Systems, Vol. 48, No. 2, 2012, pp. 1725~1739. DOI |
11 | Jeong, S. J., Jang, D. S., Choi, H. L. and Yang, J. H., "Task Scheduling and Multiple Operation Analysis of Multi-Function Radars," Journal of The Korean Society for Aeronautical and Space Sciences, Vol. 42, No. 3, 2014, pp. 254~262. DOI |
12 | Ding, Z., "A survey of radar resource management algorithms," 2008 Canadian Conference on Electrical and Computer Engineering, IEEE, 2008, pp. 1559~1564. |
13 | Cayir, O. M. E. R., "Radar resource management techniques for multi-function phased array radars," Diss. MS thesis, Middle East Technical University, Ankara, Turkey, 2014. |
14 | Butler, J. M., "Tracking and control in multi-function radar," Doctoral dissertation, University College London, 1998. |
15 | Pinedo, M. and Hadavi, K., "Scheduling: theory, algorithms and systems development," Operations Research Proceedings, Springer, Berlin, Heidelberg, 1991, pp. 35~42. |