• 제목/요약/키워드: Through operation

검색결과 10,467건 처리시간 0.042초

악교정 수술에서 STO와 술 후 악골위치 비교를 통한 이동량 재현성에 대한 평가 (THE EVALUATION OF REPRODUCIBILITY OF OPERATION PLAN WITH THE COMPARISON BETWEEN STO AND POST-OPERATIVE JAW POSITION IN ORTHOGNATHIC SURGERY)

  • 권석우;지유진;이백수;이덕원
    • Journal of the Korean Association of Oral and Maxillofacial Surgeons
    • /
    • 제34권6호
    • /
    • pp.628-634
    • /
    • 2008
  • The purpose of this study is to examine reproducibility of operation plan and 3-dimentional jaw movement patterns by comparing jaw position of STO with post-operative jaw position. Twenty patients with class III dental and skeletal malocclusion who were treated with Le-Fort I osteotomy and B-SSRO were reviewed. Lateral cephalometric radiographs were taken within two weeks before operation and two days after operation. Cephalometric radiographs were compared and analyzed with orthognathic computer program '$V-Ceph^{TM}$'. Post-operative maxillary advancement was insufficient compared to maxillary advancement through STO. Post-operative setback movement was over compared to mandibular setback movement through STO. But statistically this is not significant. Maxillary vertical location is insignificant on the whole. Especially post-operative maxillary clockwise rotation is significant compared to maxillary rotation through STO. Post-operative maxillary clockwise rotation tendency is generally observed in all patients. So surgeons and staffs must consider this tendency when operation plan is established ans operation is being performed. Using intra or extra oral marking points, face bow, and bite plate will make exact surgery possible.

고속기록기의 제어운용 소프트웨어 분석 및 개발에 관한 연구 (A Study on Development and Analysis of Control Operation Software of High-Speed Recorder)

  • 황철준;오세진
    • 융합신호처리학회논문지
    • /
    • 제10권4호
    • /
    • pp.280-288
    • /
    • 2009
  • 본 논문에서는 한국우주전파관측망(Korean VLBI Network; KVN)을 통하여 천체의 미약한 우주전파를 고속으로 기록하는 Mark5B 고속기록기 시스템의 제어운용 소프트웨어를 분석하고 VSI(VLBI Standard Interface) 형식의 시각정보를 기록할 수 있는 소프트웨어를 개발하였다. 고속기록기 시스템의 제어운용 소프트웨어는 대용량 하드디스크를 제어할 수 있는 RAID 보드를 구동하는 소프트웨어와 네트워크를 통한 제어운용을 할 수 있다. 핵심 제어 소프트웨어가 시스템에서 구동하고 있으면 네트워크로 입력된 명령을 해석하고 실행 후 결과를 다시 네트워크를 통해 출력하도록 구성되어 있다. 이러한 소프트웨어 분석을 통하여 기록된 관측데이터를 상관처리하기 위해 필요한 시각정보를 함께 기록할 수 있는 소프트웨어를 본 논문에서 개발하였다. 개발된 소프트웨어는 데이터를 기록할 때 입력되는 1PPS 신호의 인터럽트를 확인한 후 데이터 기록과 함께 기록시각정보도 함께 데이터 기록시간동안 기록한다. 개발한 소프트웨어의 정상동작을 확인하기 위해 실제 관측을 수행하였으며, 기록한 데이터의 분석을 통하여 그 유효성을 확인하였다.

  • PDF

실계통 운전경험에 따른 아몰퍼스 변압기의 제조 및 운영방안 (Manufacturing and operation experiance of Amorphous Alloy Gore Transformer)

  • 정영호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1998년도 하계학술대회 논문집 A
    • /
    • pp.110-112
    • /
    • 1998
  • Some recomendations for the manufacturing, operation and maintanance of amorphous alloy core transformer are presented through the operation experiance. Transformers on trouble was taken to pieces and tested from a viewpoint of durability, and low loss characteristics.

  • PDF

혼합배전계통에서 뇌과전압 해석을 통한 중성선과 가공지선 혼용 운전의 타당성 평가 (Suitability Evaluation on Joint Operation of Neutral Wire and Overhead Grounding Wire through Lightning Surge Analysis in Combined Distribution System)

  • 정석산;이종범;김용갑;송일근;김병숙
    • 전기학회논문지
    • /
    • 제59권12호
    • /
    • pp.2135-2142
    • /
    • 2010
  • This paper studies the validity about a joint operation of neutral wire and overhead grounding wire in combined distribution systems. The overhead grounding wire and neutral wire are currently installed separately and grounded by common. However there is no any ineffectiveness or electrical problem in case of the proposed system, such system can be operated at real distribution system. Therefore this paper describes the suitability of a joint operation through lightning surge analysis on combined distribution systems. Lightning surge analysis is carried out by EMTP/ATPDraw to obtain the overvoltage of overhead line and underground cable in various conditions such as locations and current types of lightning stroke. Overvoltage gained by the analysis show that the insulation strength of the joint operation case is not stable compare with the current operation case.

혼합배전계통에서 뇌과전압 해석을 통한 중성선과 가공지선 혼용 운전시 적정 피뢰기 위치에 관한 연구 (A Study on the Optimal Position of Lightning Arrester on Joint Operation of Neutral Wire and Overhead Grounding Wire through Lightning Surge Analysis in Combined Distribution System)

  • 정석산;장화윤;안천용;이종범
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2011년도 제42회 하계학술대회
    • /
    • pp.535-536
    • /
    • 2011
  • This paper studies the validity about a joint operation of neutral wire and overhead grounding wire in combined distribution systems. The overhead grounding wire and neutral wire are currently installed separately and grounded by common. However there is no any ineffectiveness or electrical problem in case of the proposed system, such system can be operated at real distribution system. Therefore this paper describes the suitability of a joint operation through lightning surge analysis on combined distribution systems and analyzes the optimal position of lightning arrester on joint operation of neutral wire and overhead grounding wire. Lightning surge analysis is carried out by EMTP/ATPDraw to obtain the overvoltage of overhead line and underground cable in various conditions such as location and current types of lightning stroke. Over voltage gained by the analysis show that the insulation strength of the joint operation case is not stable compare with the current operation case.

  • PDF

설비 운영의 에러 분석을 통한 인자 및 모델연구 -반도체 산업중심- (The study on factor and model through error analysis to equipment operation (Focused on the Semiconductor industry))

  • 윤용구;박범
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2009년도 추계학술대회
    • /
    • pp.187-201
    • /
    • 2009
  • Semiconductor industry is based on equipment industry and timing industry. In particular, semiconductor process is very complex and as semiconductor-chip width tails and is becoming equipment gradually more as a high technology. Equipment operation is primarily engaged in semiconductor manufacturing (engineers and operator) of being conducted by, equipment errors have also been raised. Equipment operational data related to the error of korea occupational safety and health agency were based on data and production engineers involved in the operator's questionnaire was drawn through the error factor. Equipment operating in the error factor of 9 big item and 36 detail item detailed argument based on the errors down, and 9 big item the equipment during operation of the correlation error factor was conducted. Each of the significance level was correlated with the tabulation and analysis. Using the maximum correlation coefficient, the correlation between the error factors to derive the relationship between factors were analyzed. Facility operating with the analysis of error factors (big and detail item) derive a relationship between the model saw. The end of the operation of the facility in operation on the part of the two factors appeared as prevention. Safety aspects and ergonomics aspects of the approach should be guided to the conclusion.

  • PDF

산업용 수용가에서 에너지절감을 위한 ESS 운영 방안에 관한 연구 (Study on ESS Operation Plan for Energy Reduction in Industrial Customer)

  • 유순정;이안기;백정선;차대중;김재철
    • 전기학회논문지
    • /
    • 제67권9호
    • /
    • pp.1152-1158
    • /
    • 2018
  • In this paper, Optimal operation plan through load analysis of industrial end-user is suggested. It calculated economic feasibility of ESS with detailed power lad analysis and conditions. Generally, if the latest maximum power is less than 30% of contracted power, it can not be peak shaving operation plan. and if the peak load level stays stead for 24 hours, it is difficult peak shaving for ESS. In addition to, When the peak load is occurred in summer or winter, a hybrid operation method combining the peak shaving plan and the time shift method is proposed. Therefore, When ESS is installed in industrial electrical customer, it is achieved best effect through the optimal operation plan.

소프트웨어 운영 대가산정 방식에 대한 실증적 연구 (An Empirical Study on Pricing Model for Software Operation)

  • 김흥식;김충영;서용원
    • 한국IT서비스학회지
    • /
    • 제18권4호
    • /
    • pp.67-82
    • /
    • 2019
  • The purpose of this study is to improve the calculation method of the software operation pricing proposed by the software business price calculation guide from 'input manpower method' to 'rate calculation method'. The software operation pricing of the input manpower method is not objectively calculated in the domestic IT outsourcing situation where the statistical data based on the activity based estimating is insufficient and it is decided by agreement between the owner and the client. In addition, there was no standard for adjusting the productivity according to the characteristics of the operation service. In order to improve this, an operational correction factor item that can affect the software operation productivity was selected based on foreign and domestic standards, and it was confirmed through the first questionnaire to IT operation managers. In order to determine the level of difficulty of the fixed operational correction factors, the operational correction factor using AHP technique was confirmed through a second questionnaire for pairwise comparison. The operational difficulty calculation table was developed with reference to COCOMO and ITIL standards. Finally, we propose a new pricing scheme that reflects the operating rate. Regression analysis was carried out by collecting the data of the domestic public institutions on the estimated cost and the actual cost calculated from the new rate method software operation pricing. The results of the regression analysis show that the estimated cost and the actual cost are related to each other. Mean magnitude of relative error(MMRE) and PRED[25] analysis were added for accuracy analysis. MMRE and PRED also showed satisfactory results, confirming the possibility of replacing the rate method software operation pricing.

정중 흉골 절개술을 통한 양측의 기종성 폐포의 절제 (Median Sterontomy for Bilateral Resection of Emphysematous Bullae)

  • 이성윤
    • Journal of Chest Surgery
    • /
    • 제23권4호
    • /
    • pp.720-730
    • /
    • 1990
  • The complicated pulmonary emphysema including “Giant bullae” and spontaneous pneumothorax often involve both lungs, and controversy exists concerning which is the more rational means of surgical treatment-bilateral simultaneous operation or two staged operation. We report three cases of the complicated bilateral bullous emphysema and two cases of bilateral spontaneous pneumothorax treated through median sternotomy. We performed the ligation of bullae, bullectomy, cystectomy, wedge resection, and left lower lobectomy through median sternotomy. No technical problems were encountered through this approach, which provided maximum benefit with one operation In conclusions, median sternotomy may be appropriate for resection of emphysematous bullae, specially in a severe COPD patient who may be poorly tolerated the superimposed loss of respiratory function due to incisional pain, because median sternotomy permit bilateral exploration, minimal impairment of pulmonary function, simultaneous restoration of pulmonary function, less incisional pain than routine lateral thoracotomy.

  • PDF

표준작업시간과 손실시간에 관한 연구 - Radiator 제조공정의 시간연구사례를 중심으로 - (A Study on the Standard Time & Loss Time)

  • 강경식
    • 산업경영시스템학회지
    • /
    • 제4권5호
    • /
    • pp.27-42
    • /
    • 1981
  • The object of this paper is to Study the work measurement which is one of the principal technique in work study for the improvement of Productivity in the foundry industry. Most of domestic mechanical enterprise using the expensive foreign machinerise is inoufficient for the standardization of the operation method and time. Therefore, the improvement of operation and productivity through the introduction of the work measurement is an urgent task. Therefore, this paper is contribute to the improvement of operation and to reduce the loss time through the application of the work measurement based on the case study conducted at W-Foundry Corporation. The summary of this study is follows; 1. The measurement of operation efficiency can be accomplished by the standard time. 2. The detailed causes and counter-proposal of loss time can be established, 3. More than 50% of loss time is attributed to c/p.

  • PDF