• Title/Summary/Keyword: The will to Power

Search Result 6,170, Processing Time 0.03 seconds

The Introduction of #2 HVDC SYSTEM (육지-제주간 2차 HVDC SYSTEM 개요)

  • Jang, Suk-Han;Yoo, Sung-Hwan;Shin, Myoung-Sik;Lee, Gyu-Yong
    • Proceedings of the KIEE Conference
    • /
    • 2008.11a
    • /
    • pp.107-109
    • /
    • 2008
  • Cheju-Haenam HVDC transmission system start it's commercial operation since 1998. JEJU island is supplied with it's about 45% of total electric power from main land with HVDC link. In JEJU island, the demand of electric power is growing every year. With a current power supply, electric power reserve rate will be below the recommended one. For a stable power supply to JEJU island, KEPCO start a construction of #2 HVDC transmission system. This report is for introduction and understanding of #2 HVDC system which will be installed between JEJU island and main land. This report includes a specification of converter station and DC cable. KEPCO expect that this system will solve the power supply problem and maximum wind power plant capacity problem as well.

  • PDF

The Analysis of Fault and Relay Operation in System of Power Network (전력계통의 고장 및 보호계전기 동작에 대한 분석)

  • Kim, Ho-Pyo;Han, Sang-Seob;Park, Eung-Ju
    • Proceedings of the KIEE Conference
    • /
    • 2001.05a
    • /
    • pp.27-29
    • /
    • 2001
  • As the amount of electric power consumption is increasing rapidly, the power systems are complex and growing larger. It is required that the quality of electricity is better. To satisfy this demands It is required to analyze the data of the fault accurately and then to find a cause and to enforce a countermeasure. We analyzed the fault of transmission & substation installation over 66kV statistically to operate the power system well. We introduced the faults that are classified into the cause, the facilities, the voltage. This paper explains the experience of the fault in electric power coporation that is operating the large power system. This paper will be meaningful. because this paper gives the data of real power system. We wish that the reliability of power suppliment will be improved, as using this paper properly and this paper is helpful to the growth of this field and the development of technology.

  • PDF

Flexible Electronics Devices for Smart Card Applications

  • Hou, Jack;Kimball, Bob;Vincent, Bryan;Ratcliffe, Bill;Mahan, Mike
    • 한국정보디스플레이학회:학술대회논문집
    • /
    • 2008.10a
    • /
    • pp.75-77
    • /
    • 2008
  • Flexible electronics devices such as plastic display, thin film battery, membrane switch, organic memory for smart card applications will be presented. The performance and power consumption of various display technologies will be compared for OTP requirement in smart cards. Wireless power transmission by RF coupling through an antenna provides a potential power solution to smart cards. Finally, the general trend of smart card future developments will be discussed.

  • PDF

Design of a Prototype Fibre Optic Based Monitoring and Control System for Future KEPCO's 765kV Substation (765kV 변전소 감시제어용 시범시스템)

  • Jiang, Moon-Myung;Chung, Sang-Jin;Choi, Jong-Hyoub;Park, Jong-Myung
    • Proceedings of the KIEE Conference
    • /
    • 1996.07b
    • /
    • pp.883-886
    • /
    • 1996
  • Instead of point-to-point hard wiring between substation yard equipments and SCADA RTU(Remote Terminal Unit), fibre optic cable will be used in the portion between Local Units and Central Unit in the future KEPCO 765kV substation. The connections between substation yard equipments and nearby Local Unit remain the same hard wiring. The new fibre optic system will provide security especially during ground faults and is immune to electrical noise. A prototype system will be manufactured and installed in the existing 154kV Yeosan Substation by the end of July this year and operated for one year. By incorporating the operation experiences acquired in the system, an improved system will be commercially applied to 765kV Shin-An-Seong Substation where 345kV GIS will be installed initially and act as the switching station in the year 1998. The system is composed of one Central Unit and several Local Units. The Central Unit is composed of two workstation level computers, one is in operation and the other backup, and a Communication Control Unit. The Local Unit uses the existing SCADA RTU technology and takes the form of a distributed one. Between the Communication Control Unit and Local Units, the fibre optic system with star-coupler is used.

  • PDF

A Study On Database Improvement Of The Power System Protection Program (계통보호 정정 프로그램의 데이터베이스 개선에 관한 연구)

  • Kim, S.H.;Lee, S.J.;Choi, M.S.;Min, B.U.
    • Proceedings of the KIEE Conference
    • /
    • 2002.11b
    • /
    • pp.193-195
    • /
    • 2002
  • This paper presents the methods to solve the problem about Power System Protection Program(PROSET) and describe the database relation and schema with UML. PROSET is a overall program system to protect power system and correct it. In the context of the PROSET it is so difficult to edit database data when topology is changed. When the renewal of data is performed. all changed values are disappeared. Therefore, it will not be expected to know the present situation by using the information of the databases data. So it is necessary to solve this problem. Solution is copy of the user. Only E.R diagram is used to express database schema and relation. So, in this paper, UML(Unified Modeling Language) will be used to express PROSET and database of MCD-H and MDT-H.

  • PDF

Distribution Pricing Methodology for Korean Wholesale Electricity Market (도매경쟁 전력시장에서의 배전요금 산정방식)

  • Kim, C.S.;Rhee, C.H.;Oh, T.K.;Park, B.Y.;Kim, Y.W.;Kim, Y.C.
    • Proceedings of the KIEE Conference
    • /
    • 2001.11b
    • /
    • pp.195-197
    • /
    • 2001
  • The Distribution Network costs are currently part of the total cost of KEPCO covered through aggregated final consumer tariffs. There is no unbundling of Power Sale and Distribution Network activities. This situation will change with the introduction of competition in supply. The Distribution Network Service Providers will have to provide access and set explicitly Distribution Service Charges in order to enable the Power Sales Businesses to convey electricity to their consumers using the Distribution Network for these purposes. The Distribution Service Charges will be made up of Distribution Connection Charge and Distribution Use of Network Charge. The Distribution Losses will be considered through Distribution Loss Factors and included in the electricity purchased by the Power Sales Businesses.

  • PDF

Northeast Asia Interconnection and Regional Reserve Increase Effects (동북아 연계선로 구성 및 지역별 예비력 증가 효과)

  • Lee, Sang-Seung
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.417-419
    • /
    • 2005
  • This paper presents the effects and the regional power distribution of an increase or a decrease of a power reserve by load flow calculations under seasonal load patterns of each country for the future power shortages faced by the metropolitan areas or by the southeastern area of the South Korea in North-East Asia. In these connections, the types of a power transmission for interconnection consist of the 765kV HVAC and the HVDC. In this paper, the various cases of the power system interconnections in Far-East Asia are presented, and the resulting interconnected power systems are simulated by means of a power flow analysis performed with the PSS/E 28 version tool. The power flow map is drawn from data simulated and the comparative study is done. In this future, a power flow analysis will be considered to reflect the effects of seasonal power exchanges And the plan of assumed scenarios will be considered with maximum or minimum power exchanges during summer or winter in North-East Asia countries.

  • PDF

A Study on the Impacts of Manufacture's Sales Policy of Each Power Source on Sales Will by Agency (제조업체의 파워원천별 영업정책이 대리점의 판매의지에 미치는 영향에 관한 연구)

  • Lee, Han-Il;Park, Jong-Oh
    • Management & Information Systems Review
    • /
    • v.29 no.3
    • /
    • pp.23-50
    • /
    • 2010
  • This study is that the manufacturer's sales policy power appeared on the source of local distributors through the sale willingness impact on research for coexistence between the manufacturer and dealer sales for developing policy. Dealers in terms of the sale of regional sales willingness says "manufacturers and retailers to connect to the regional distribution on the path to regional sales representative for manufacturers based on trust companies that supply products or products manufactured by local retailers for about a unilateral will sale whether the continued willingness and indicates the degree of business". This study topics are the results of this measure will sell a total of 24 entries are four factors. In variety sales policy of each power source, First, sales policy in Reward Power, compensatory power as the manager of promotion support, sales support and sales activities will significantly impact respectively. Second, sales policy of Coercive Power, reduction of credit limits act as an element of discontent and the sales will appear in the negative hypothesis of the influence was partially supported. Third, sales policy in Referent Power, the information trust, the most significantly impact of trade policy, respectively. Fourth, sales policy in Professional Power, delay time delivery of goods, sales of our product and sales knowledge will have a significantly effect appear to be related.

  • PDF

A Study On Database improvement Of The Power System Protection Program(II) (계통보호 정정 프로그램의 데이터베이스 개선에 관한 연구(II))

  • Kim, S.H.;Lee, S.J.;Choi, M.S.;Min, B.U.
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.302-304
    • /
    • 2003
  • This paper presents the methods to solve the problem about Power System Protection Program(PROSET). PROSET is a overall program system to protect power system and correct it. In the context of the PROSET, it is so difficult to edit database data when topology is changed. When the renewal of data is performed, all changed values are disappeared. Therefore, it will not be expected to know the present situation by using the information of the databases data. So it is necessary to solve this problem. Solution is copy of the user. Database of GRL,GRZ,KYP2D1,KYD2X1,L90 Relay module were developed. We made a database management system for PROSET, therefore I will show this management system briefly.

  • PDF

Forecasting of new businesses after restructuring of power industry

  • Koo, Young-Duk;Kim, Eun-Sun;Park, Young-Seo
    • Journal of information and communication convergence engineering
    • /
    • v.2 no.2
    • /
    • pp.116-118
    • /
    • 2004
  • In the power industry after restructuring of Power industry will be appeared on-site type business, power retail sales business, and power wholesales business, power dealing business, customer inclination business & delivery of power facilities. Among them, power trade business, customer inclination business and on-site type business will be rapidly increased and occupied attention. In addition, it is forecasted to advent the broker, provider, market place, power marketer, system operator and generator as a main player. Meanwhile, it needs protection of existing power industry and activation of new energy market for accomplishment of restructuring of power industry.