Presumption Method for Optimum Correction Rate of Total Construction Cost Using the Median based on Historical Data Analysis in Public Office Buildings (공공건축물 실적자료 분석에 따른 중위수를 활용한 총공사비의 적정보정율 추정방법)

  • Yim, Jin-Ho;Park, Jun-Mo;Kim, Ok-Kyue
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.5
    • /
    • pp.415-422
    • /
    • 2014
  • There is growing difference between a planned value and an actual cost for increasing as an risk of construction cost. A construction cost index is an alternative to redeem a problem, but it is still very difficult to reduce an actual differential as a price fluctuation. Furthermore an existing theory of a construction cost index is overly complex, and is unsuitable for using in working-level. This study suggests an optimum correction rate in respect of a total construction cost. It is analyzing the actual cost of 53 public buildings that the Public Procurement Service ordered. The objects are main processes that include architectural works, mechanical works, electrical works, telecommunication works, and service facilities. It is compared a total construction cost based on absolute error rate using the median from frequentist principle. For this, it is selected the suitable regression model and set a correction rate.

Improvement of Construction Cost Index against the Change of National Basic Statistic (국가 기초 통계자료 환경변화에 따른 건설공사비지수 개선)

  • Kang, Taikyung;Baek, Seung-Ho;Kim, Chang-Won;Cho, Hunhee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.21-29
    • /
    • 2015
  • Construction cost index (CCI) has been published for last 10 years, it's contributed to update the historical cost data, analysis cost fluctuation and evaluate the market price for construction works with direct or indirect manner. CCI is a secondary or processed statistics using the basic statistics of input output table (IO table) and producer price index (PPI) from the Bank of Korea (BOK). So once the basic statistics change, it is required to modify the calculating model of CCI. Recently the BOK changed some fundamental principles and the base year (from 2005 to 2010), that can be used in IO table and PPI. This research analyzed the recent revision of basic statistics and their impacts on CCI, and improved the previous CCI model in response to it. Also the validity of new CCI was verified by analyzing the items and weights utilized in CCI and comparing the related index.

Cost Prediction Model for Building Demolition Work by Using Regression Analysis (회귀분석을 이용한 건축물 해체공사비 예측모델)

  • Kim, Taehoon;Kim, Young Hyun;Cho, Kyuman
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.2
    • /
    • pp.105-112
    • /
    • 2021
  • While the scale of the domestic market for demolition work is steadily increasing, research on cost prediction for demolition work is insufficient. Thus, this study proposes a cost prediction model for demolition work that reflects various attributes influecing the fluctuation of demolition cost. 13 influencing factors and historical cost data were collected based on literature review and experts' advice, and two prediction models were constructed through regression analysis and the prediction accuracy was evaluated. As a result, it showed an average error rate of about 6 to 12%, and it was possible to explore the possibility of use as a reliable prediction model. The results of this study can contribute to estimating appropriate construction cost and improving related standards for domestic demolition works in the future.

Comparison of Cost Performance for Delivery Methods on Public Construction Projects (공공 건설공사 발주방식에 따른 비용성과 비교연구)

  • Lee, Yoo Sub;Kang, Tai Kyung;Shin, Eun Young;Park, Wonyoung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.6
    • /
    • pp.2575-2582
    • /
    • 2013
  • In the delivery systems for public construction works, design-build methods such as turn-key and alternative have contributed to improving the quality of structures and developing the construction technology. However, it is pointed out that construction based on a design-build method is likely to waste a budget due to its higher contract price than construction based on a design-bid-build method. Other issues such as contract monopoly, bid rigging and deliberation irregularity in design-build. Since there are not much works have been accomplished to comparatively analyze the actual performance and effect based on delivery methods, discussing and judging the performance and effect of each deliver method with limited information could lead to an error. Thus, this study by extensively investigates the actual project cost data, ranging from contract price to the construction cost of the public construction works and comparatively analyzed the characteristics of each delivery method about cost structure and fluctuation trend. This work is expected to assist stake-holders in properly understanding delivery systems for public construction works and promoting their efficient management.

The Research About Suitability of The Cost of Work According to The Alteration of Design Literature (설계도서 변경에 의한 실 공사비의 책정에 관한 연구)

  • Im, Chil-Soon;Lee, Gyu-Chel
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.3
    • /
    • pp.113-120
    • /
    • 2003
  • The purpose of this thesis is to provide an appropriate trade-off information for the conflicting interests caused by the various factors between building owner and contractor during selecting the contractor and performing the construction work, in which the construction was contracted by open bidding from the government or private organizations. In order to propose the legitimate evidence, the differences between the domestic contract sheet of drawing change and the process of drawing change and those of the foreign countries were compared and analysed. The number of construction ordered in Youngdong area in 2001 whose construction expenses are more than 100,000,000 won is 218 items and 147,005,000,000 won in total cost. Among them, the number of 218 items whose total cost amounts to 16,705,000,000 (11.36%) is in case of increase of construction expenses due to the drawing changes, and the number of 48 items whose total cost amounts to 2,009,000,000 won (1.37%) is the case of decrease. In conclusions, the contractor could have more benefits than the building owner in case they submit the detailed estimate sheet without eliminating the increasing expenses of construction. It is shown that the building owner's loss is increasing whenever the labor cost is higher than material cost. Therefore, this thesis proposes a proper standards for the harmonious compromise between the contractor and the building owner for the problems caused by the drawing changes when the contract agreement is occurred.

The Calculation Method for Prolongation cost of Sub-Constract in Domestic Public Construction Project (국내 공공 공사 하도급계약 공기연장 추가간접비 산정방안)

  • Jeong, Kichang;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.4
    • /
    • pp.61-69
    • /
    • 2018
  • Research on additional indirect cost due to construction period extension in general contracts has continuously been active whereas the same for the subcontract operations has not been. In this research, we review previous research on evaluation methods for additional indirect costs which are widely being used on construction sites as well as previously proposed methods altogether, applying them to analyze model-cases for comparison. We acknowledge that this pattern for construction cost fluctuation over the construction period demonstrates an S-curve. This S-curve shaped indirect cost occurrence is then used to generate model-cases that are used throughout the research which models we applied previous evaluation methods on. Finally in pursuit of finding out some problems of evaluation methods, we came to derive a conclusion that the "Average Actual Cost Evaluation Method on Extended Duration," which, in turn, were proved to be valid for application on general contracts, was also valid for general application on subcontractor operations.

A Study on Improvement of Contract Regulations for Adjusting Contract Amount in Public Construction - Focused on examples of price fluctuation classification - (공공건설 계약금액 조정의 계약예규 개선방안 연구 - 물가변동 분류 사례 중심으로 -)

  • Lee, Wonjei;Shin, Manjoong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.4
    • /
    • pp.82-89
    • /
    • 2020
  • Article 64 of the Enforcement Decree of the National Contract Act The requirement of the pre-amendment statute related to the adjustment of the contract price was 5% or more of the price fluctuation rate from the date of the contract. However, the meeting requirement was changed from 5% or more to 3% or more from the date of signing of the Presidential Decree No. 19035 to 2005. 9. 8. The method of adjusting the contract amount was also changed to determine the contractor's desired adjustment method at the time of contract. Alleviating these requirements and revising the empowerment of contract partners is intended to prevent difficulties in achieving smooth objectives by applying to public construction contractors without unfairly benefiting or unfavorable to contract partners. Even if the standards are relaxed and the rights are secured as described above, if the existing provisions for the adjustment of price fluctuation are applied, unlike the original purpose of the government system, the Korea Bank's price economic statistics classification method and the contract construction classification criteria applied in public construction work Due to the inconsistency, it can be seen that the amount of adjustment for price fluctuation by construction type is excessive and underestimated. Therefore, the purpose of this study is to analyze problems through cases and to make appropriate construction cost adjustment through improvement measures.

Characteristic Analysis of the Changes of Landscape Architecture Construction Costs in Time-series - Focused on the Cases of Works of Public Institution's at Capital Area - (아파트단지 조경 공사비의 공종별 경년변화 특성 분석 - 공공기관 시행의 수도권 아파트단지를 중심으로 -)

  • Park, Sang-Jin;Cho, Se-Hwan
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.43 no.6
    • /
    • pp.150-159
    • /
    • 2015
  • This study was conducted for the purpose of presenting basic data for calculating a more reasonable landscaping project cost in the future through the construction cost calculation ratio of scenic planting and facilities and their time series trend analysis targeting 'J' corporation, a representative Korean public institution that creates apartment complexes. This study targeted scenic planting and the facility construction costs of 37 apartment complexes in the capital area from 2004 to 2012, using statistical analysis methods such as technical analysis, correlation analysis, and regression analysis to analyze the characteristics of the time series change. The conclusion was drawn as follows. First, breaking down the cost of overall landscaping projects to scenic planting and facility construction, the ratio of the average cost of scenic planting to that of facility construction showed 56.1% to 43.9% from 2004 to 2012. Second, the costs of planting construction and facility construction both showed a fluctuation range of about ${\pm}3%$, implying relatively steady costs considering the inflation rate. Third, the landscape construction cost for each type of construction resulted in a fluctuation range from minimum ${\pm}3%$(exercise facility) to maximum ${\pm}5%$(packing facility), reflecting that among the landscaping projects, the facility construction costs tended to show relatively large fluctuations in accordance with the change of time series. Fourth, the comprehensive indication of the ratio of landscaping project costs by time series and landscaping construction type implies that the regional characteristics and positional condition of the apartment complexes were not reflected sufficiently. Fifth, the high level of correlation of landscaping construction types and landscaping construction elements imply that the entire construction costs were controlled through partial adjustment of cost components within the overall frame of construction cost. These results reveal the problems of standardized landscaping cost irrespective of user satisfaction or environmental traits such as the conditions of the apartment complexes.

Comparative Analysis between GDP Deflator Method and Index Adjustment Rate Method on BTL Sewer Rehabilitation Projects in Jeju (제주도 내 하수관거정비 BTL사업의 GDP 디플레이터 방식과 지수조정률 방식과의 비교 분석)

  • Yang, Du-Suck;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.1
    • /
    • pp.217-227
    • /
    • 2015
  • This study conducted case studies in order to suggest the improvement of GDP (Gross Domestic Product) deflator method which is adopted on calculating fluctuation rate on BTL (Build-Transfer-Lease) sewer rehabilitation projects in Jeju. As a result, because GDP deflator method calculates fluctuation rate by each quarterly, the fluctuation rate of GDP deflator method is higher than it of index adjustment rate method. And GDP deflator method cannot reflect real price because of applying fixed index in whole construction cost for calculating fluctuation rate. Especially, the notification day - the base point influences fluctuation rate and fluctuation amount strongly in GDP deflator method.

A Study on the fluctuation Factors Influenced on the Computation of interior Cost (인테리어 공사비 산정에 영향을 주는 변동요인에 관한 연구)

  • 정재은;권영성
    • Korean Institute of Interior Design Journal
    • /
    • no.16
    • /
    • pp.75-81
    • /
    • 1998
  • With the rise of the economic level and the improvement of the standard of living the size of the interior work is becoming large and specialized, With the recent opening of the domestic interior decoration market the order of the large-scale interior decoration work is actively received and its efficient construction is vigorously made. Accordingly reliability is required in keeping with all the accuracy of computing interior construction expenses systematically is importantly emerging. The estimation sheet written in a kind of process mode and in an area made as the construction expense breakdown mode were statistically treated and analyzed as well as quantity computation breakdown data. In determing the major factors that expert an influence on the factors of changes in construction expenses as well as the compositional ratio of construction work that becomes basic material for developing the cost model of interior decoration work the following conclusion could be made: Improvement should be made to suit the present situation by synthesizing and arranging the data practically used in current interior construction expenses. Required construction expenses for the kind of work common to each construction field are showing a given proportion and the required construction expenses of rather small scale interior construction work tend to be irregular. It is necessary to compute optimal construction expenses by calculating the optimal period of work and working personnel in consideration of the influential factor in each work.