1 |
Hong, J. H. and Lee, D. W. (2014). "Analysis of road construction project's escalation under historical data-based estimate system in Jeju." Journal of the Korean Society of Civil Engineers, Vol. 34, No. 2, pp. 667-676 (in Korean).
DOI
|
2 |
Jeong, K. C. (2008). Problems and improvement schemes to historical cost fluctuation ratio calculation according to the escalation, Chung-Ang University, Master's Thesis (in Korean).
|
3 |
Kang, J. S. (2013). The improvement of performance evaluation on BTL sewer rehabilitation projects in jeju, Jeju National University, Master's Thesis (in Korean).
|
4 |
Oh, B. H. (2012). Improvement of adjustment method for price fluctuation in build transfer lease projects, Chungbuk National University, Master's Thesis (in Korean).
|
5 |
Park, Y. H. (2005). An improvement plan of contract price adjustment through the problem analysis of the current price escalation regulation in construction projects, Chung-Ang University, Master's Thesis (in Korean).
|
6 |
The Bank of Korea (2014). National Accounts 2013 (in Korean).
|
7 |
ECOS (Economic Statistics System, The Bank of Korea) (http://ecos.bok.or.kr).
|