• Title/Summary/Keyword: The benefit estimation

Search Result 232, Processing Time 0.029 seconds

Conceptual Design of Automatic Control Algorithm for VMSs (VMS 자동제어 알고리즘 설계)

  • 박은미
    • Journal of Korean Society of Transportation
    • /
    • v.20 no.7
    • /
    • pp.177-183
    • /
    • 2002
  • Current state-of-the-art of VMS control is based upon simple knowledge-based inference engine with message set and each message's priority. And R&Ds of the VMS control are focused on the accurate detection and estimation of traffic condition of the subject roadways. However VMS display itself cannot achieve a desirable traffic allocation among alternative routes in the network In this context, VMS display strategy is the most crucial part in the VMS control. VMS itself has several limitations in its nature. It is generally known that VMS causes overreaction and concentration problems, which may be more serious in urban network than highway network because diversion should be more easily made in urban network. A feedback control algorithm is proposed in this paper to address the above-mentioned issues. It is generally true that feedback control approach requires low computational effort and is less sensitive to models inaccuracy and disturbance uncertainties. Major features of the proposed algorithm are as follows: Firstly, a regulator is designed to attain system optimal traffic allocation among alternative routes for each VMS in the network. Secondly, strategic messages should be prepared to realize the desirable traffic allocation, that is, output of the above regulator. VMS display strategy module is designed in this context. To evaluate Probable control benefit and to detect logical errors of the Proposed feedback algorithm, a offline simulation test is performed using real network in Daejon, Korea.

Research on the Function and Economic Effect of Technology Opportunity Development System (기술기회발굴시스템의 기능 및 경제적 효과에 관한 연구)

  • Lee, Woo-Sung;Kim, Kang-Hoe;Coh, Byoung-Youl
    • Journal of Korea Technology Innovation Society
    • /
    • v.14 no.spc
    • /
    • pp.1096-1127
    • /
    • 2011
  • This research focus on estimating the economic effects of TOD system development from the perspective of new market creation, R&D planning cost reduction and increase of R&D projects' commercialization success rates. The research is conducted through simulation and scenario analysis with assumptions about economic effect parameters. Scenario analysis shows that scenario 1 (the application ratio of the new TOD system to total Korean R&D programs' planning is 1.4%) results in total economic effects, 921.3 billion won in 2011 price with B/C ratio 6.15, that scenario 2 (the application ratio is 1.9%) results in total economic effects, 1,250.3 billion won in 2011 price with B/C ratio 8.34, and that scenario 3 (the application ratio is 0.9%) results in total economic effects, 592.2 billion won in 2011 price with B/C ratio 3.95. The research contributed to the prior evaluation of economic validity of "R&D on Technology Opportunity Development (TOD) system" and to cultivating the new methodology of economic benefit estimation in the area of R&D on system development.

  • PDF

Estimation of the Shadow Price of Carbon Dioxide Emissions, the Potential Reduction, and Substitution Possibility for fuels in the Chinese Fossil-fueled Power Generation Sector (중국 화력발전산업의 CO2 암묵가격 및 잠재감축량, 연료에 대한 대체가능성 분석)

  • Jin, Yingmei;Lee, Myunghun
    • Environmental and Resource Economics Review
    • /
    • v.22 no.1
    • /
    • pp.77-98
    • /
    • 2013
  • China, the world's largest $CO_2$ producer, is likely to be obligated to reduce greenhouse gas emissions under the post-Kyoto protocol. This paper estimates a Shephard input distance function for the Chinese fossil-fueled power generation sector to measure the shadow price of $CO_2$ emissions, technical efficiency, and indirect Morishima elasticities of substitution between inputs. Empirical results show that, on average, it costs approximately 3.2 US dollars per year to reduce $CO_2$ emissions by one ton over the period 1981-2009. This finding indicates that Chinese power sector is expected to benefit from selling emission permits to other countries such as Korea and Japan, given that our estimate for China is lower than the ones previous literatures estimated for the power sector in these countries. The maximum attainable average $CO_2$ reduction potential amounts to approximately 25 million tons per year by improving technical efficiency. Capital is substitutable with both coal and oil and capital is relatively more readily substituted for these fuels.

2018 Current Health Expenditures and National Health Accounts in Korea (2018년 경상의료비 및 국민보건계정)

  • Jeong, Hyoung-Sun;Shin, Jeong-Woo;Moon, Sung-Woong;Choi, Ji-Sook;Kim, Heenyun
    • Health Policy and Management
    • /
    • v.29 no.2
    • /
    • pp.206-219
    • /
    • 2019
  • This paper aims to demonstrate current health expenditure (CHE) and National Health Accounts of the years 2018 constructed according to the SHA2011, which is a manual for System of Health Accounts (SHA) that was published jointly by the Organization for Economic Cooperation and Development (OECD), Eurostat, and World Health Organization in 2011. Comparison is made with international trends by collecting and analyzing health accounts of OECD member countries. Particularly, scale and trends of the total CHE financing as well as public-private mix are parsed in depth. In the case of private financing, estimation of total expenditures for (revenues by) provider groups (HP) is made from both survey on the benefit coverage rate of National Health Insurance (by National Health Insurance Service) and Economic Census and Service Industry Census (by National Statistical Office); and other pieces of information from Korean Health Panel Study, etc. are supplementarily used to allocate those totals into functional classifications. CHE was 144.4 trillion won in 2018, which accounts for 8.1% of Korea's gross domestic product (GDP). It was a big increase of 12.8 trillion won, or 9.7%, from the previous year. GDP share of Korean CHE has already been close to the average of OECD member countries. Government and compulsory schemes' share (or public share), 59.8% of the CHE in 2018, is much lower than the OECD average of 73.6%. 'Transfers from government domestic revenue' share of total revenue of health financing was 16.9% in Korea, lower than the other social insurance countries. When it comes to 'compulsory contributory health financing schemes,' 'transfers from government domestic revenue' share of 13.5% was again much lower compared to Japan (43.0%) and Belgium (30.1%) with social insurance scheme.

Therapeutic Results of Concurrent Chemoradiation in Locally Advanced Uterine Cervical Cancer (국소적으로 진행된 자궁경부암에서 방사선과 Cisplatin의 동시병합요법의 치료결과)

  • Kang, Seung-Hee;Suh, Hyun-Suk;Yang, Kwang-Mo;Lee, Eung-Soo;Park, Sung-Kwon
    • Radiation Oncology Journal
    • /
    • v.13 no.1
    • /
    • pp.55-61
    • /
    • 1995
  • Purpose : Despite a development of therapeutic machines and advance in modern radiation therapy techniques, locally advanced cervical carcinoma has shown high rate of local failure and poor survival rate, Combination of chemotherapy and radiotherapy demonstrated benefit in improving local control and possibly the overall survival. Our study was performed to evaluate effect of concurrent chemoradiation on locally advanced uterine cervical cancer. Methods and Materials : Twenty six patients with locally advanced stage(FIGO stage IIB with ${\geq}5cm$ in diameter, III, IVA) were treated with combination of radiation therapy and concurrent cisplatinum between May of 1988 and September of 1993 at our hospital. Radiation therapy consisted of external irradiaton and 1-2 sessions of intracavitary irradiation. Cisplatinum was administered in bolus injection of 25mg/$m^2$ at weekly intervals during the course of external radiation therapy. Results : Of the 26 Patients, twenty-five patients were evaluable for estimation of response. Median follow-up period was 25 months with ranges from 3 to 73 months. Stage IIB, III, and IVA were 16, 5, 4 patients, respectively, Twenty patients were squamous cell carcinoma. Response was noted in all 25 patients: complete response(CR) in 17/25($68\%$), Partial response(PR) in 8/25($32\%$). Of the 24 patients except one who died of sepsis at 3 months follow-up, seventeen patients($70.8\%$) maintained local control in the pelvis: 16/17($94.1\%$) in CR, 1/17($14.3\%$) in PR. Fourteen of the 17 patients with CR are alive disease free on the completion of follow-up. Median survival is 28 months for CR and 15 months for PR. Analysis of 5-year survival by stage shows 11/16($59.8\%$) in IIB, 3/5($60.0\%$) in III, and 1/4($25.0\%$) in IVA. Overall 5-year survival rate was $55.2\%$. Ten patients recurred: 4 at locoregional, 3 in distant metastasis and 3 with locoregional and distant site. Toxicity by addition of cisplatinum was not excessive. Conclusion : Although the result of this study was obtained from small number of patients, it is rather encouraging in view of markedly improved response rate compared with the results of historical group.

  • PDF

Estimation of the Expected Socio-economic Benefits of the Largescale Comprehensive Agricultural Development Project and Jointcost Allocation -In the Case of Kumgang Project Area- (대단위 농업종합개발사업의 사회경제적 기대편익 추정과 결합비용의 배분 -금강지구를 중심으로-)

  • Lim, Jae Hwan
    • Korean Journal of Agricultural Science
    • /
    • v.23 no.1
    • /
    • pp.159-176
    • /
    • 1996
  • This study is aimed at reviewing the methods of joint cost allocation and allocating the joint cost of estuary dam with specially repect to Kumgang Large-scale Agricultural Comprehensive Development Project. Apart from the water resource development project propelled by Water Resource Development Corporation in connection with Law of Multipurpose Dam Development, the Largescale Comprehensive Agricultural Development Projects couldn't ins-titutionally be carried out cost allocation of common facilities, even though it were concerned with irrigation, municipal and industrical water supply, flood control, sightseeing and industrial zone development components. To decrease farmer's burden of the project costs and, operation and maintenance costs, the joint costs of common facilities like estuary dam included in agricultural development projects have to be allocated by suitable method as alternative cost-remaining benefit method and the analytical activity should be supported by revising the concerned laws as Rural Development and Promotion and, Rural Rearrangement conpatible with the law for multipurpose dam development. Kumgang Agricultural Comprehensive Development Project was selected as a case study for the estimation of socio-economic benefits by project components and joint cost allocation of the estuary dam. The main results of the study are as follows; Joint cost allocation and unit charges by components 1. The project area will be 25,554ha with total project cost of 624,860 million won including the estuary dam cost of 120,843 million won. The project costs were ex-pressed by 1994 constant price. 2. Total quantity of water was estimated 365 million tons which were consisted of 245 million tons for irrigation, 73 million tons for municipal water and 47 million tons for industrial water. 3. The rates of joint cost allocation were amounted to 34.2% for agriculture, 2.5% for sightseeing, 45.7% for transportation, 11.8% for M & I water supply and 5.8% for flood control respectively. 4. The unit financial charges by project components were estimated at 7.88 won per ton for irrigation, 16.11won for M & I water, 1,686won per vehicle one pass, 977won per Pyeong according to the capital recovery method. The financial charges using straitline method for depreciation were estimated at 7.88won per ton for irrigation, 9.12won per ton for M & I water, 624won per vehicle one pass for transportation and 331won per Pyeong for sightseeing area. 5. The unit economic charges by project components were estimated at 21.1 won per ton for irrigation, 15.2won for M & I water, 977won per vehicle one pass, 977won per Pyeong according to the capital recovery method. The economic charges using straitline method for depreciation were estimated at 11.72won per ton for irrigation, 8.61won per ton for M & I water, 331won per vehicle one pass for transportation. Policy recommendation 1. The unit operation and maintenance costs for irrigation water in the paddy field couldn't be imposed as the water resource cost untreated. 2. The dam costs including investment cost and O & M cost, as a joint cost, had to be allocated by each benefited components as transportation, M & I water supply, flood control, irrigation and drainage, and sightseeing. But the agricultural comprehensive project have been dealt as an irrigation project without any appraisal socio-economic benefits and any allocating the joint cost of estuary dam. 3. All the associated project benefits and costs must be evaluated based on accounting principle and rent recovery rate of the project costs and O & M costs should be regulated by the laws concerned. 4. The rural development and promotion law and rural rearrangement law have to be revised comprising joint cost allocation considering free rider problems. 5. The government subsidy for the agricultural base development project has to be covered all the project costs. In case of common facilities representing joint cost allocation problems, all the allocated casts for other purposes like transportation and M & I water supply etc. should be recovered for formation in investment fund for agricultural base development and to procure O & M costs for irrigation facilities.

  • PDF

Development of the Model for Total Quality Management and Cost of Quality using Activity Based Costing in the Hospital (병원의 활동기준원가를 이용한 총체적 질관리 모형 및 질비용 산출 모형 개발)

  • 조우현;전기홍;이해종;박은철;김병조;김보경;이상규
    • Health Policy and Management
    • /
    • v.11 no.2
    • /
    • pp.141-168
    • /
    • 2001
  • Healthcare service organizations can apply the cost of quality(COQ) model as a method to evaluate a service quality improvement project such as Total Quality Management (TQM). COQ model has been used to quantify and evaluate the efficiency and effectiveness of TQM project through estimation between cost and benefit in intervention for a quality Improvement to provide satisfied services for a customer, and to identify a non value added process. For estimating cost of quality, We used activities and activity costs based on Activity Based Costing(ABC) system. These procedures let the researchers know whether the process is value-added by each activity, and identify a process to require improvement in TQM project. Through the series of procedures, health care organizations are service organizations can identify a problem in their quality improvement programs, solve the problem, and improve their quality of care for their costumers with optimized cost. The study subject was a quality improvement program of the department of radiology department in a hospital with n bed sizes in Metropolitan Statistical Area (MSA). The principal source of data for developing the COQ model was total cases of retaking shots for diagnoses during five months period from December of the 1998 to April of the 1999 in the department. First of the procedures, for estimating activity based cost of the department of diagnostic radiology, the researchers analyzed total department health insurance claims to identify activities and activity costs using one year period health insurance claims from September of the 1998 to August of the 1999. COQ model in this study applied Simpson & Multher's COQ(SM's COQ) model, and SM's COQ model divided cost of quality into failure cost with external and internal failure cost, and evaluation/prevention cost. The researchers identified contents for cost of quality, defined activities and activity costs for each content with the SM's COQ model, and finally made the formula for estimating activity costs relating to implementing service quality improvement program. The results from the formula for estimating cost of quality were following: 1. The reasons for retaking shots were largely classified into technique, appliances, patients, quality management, non-appliances, doctors, and unclassified. These classifications by reasons were allocated into each office doing re-taking shots. Therefore, total retaking shots categorized by reasons and offices, the researchers identified internal and external failure costs based on these categories. 2. The researchers have developed cost of quality (COQ) model, identified activities by content for cost of quality, assessed activity driving factors and activity contribution rate, and calculated total cost by each content for cost for quality, except for activity cost. 3. According to estimation of cost of quality for retaking shots in department of diagnostic radiology, the failure cost was ₩35,880, evaluation/preventive cost was ₩72,521, two times as much as failure cost. The proportion between internal failure cost and external failure cost in failure cost is similar. The study cannot identify trends on input cost and quality improving in cost of qualify over the time, because the study employs cross-sectional design. Even with this limitation, results of this study are much meaningful. This study shows possibility to evaluate value on the process of TQM subjects using activities and activity costs by ABC system, and this study can objectively evaluate quality improvement program through quantitative comparing input costs with marginal benefits in quality improvement.

  • PDF

A Study on the Estimation Measure of Delay Cost on Work Zone Using the Traffic Flow Model (교통류 모형을 이용한 도로 점용공사 구간의 지체비용 산정방안)

  • Kim, Yunsik;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.120-129
    • /
    • 2016
  • The user cost is an important analysis item which should be considered together with life-cycle of facility, administrator cost and discount rate in LCCA for efficient asset management of SOC facilities. Especially, a significant delay cost occurs often for users in the road field due to a work zone for cleaning and maintenance, and in such case, the administrator should consider the administrator cost as well as the user cost for more rational decision making. However, the user cost has not been considered in most decision making steps until recently and relevant studies also have not been carried out actively. In this study, the methodology to estimate the user cost and delay cost required in the decision making step using the traffic flow model and the direct benefit estimation model in the traffic facility investment evaluation guideline is suggested. And, the traffic flow model was estimated on 4 national highway sections where maintenance was actually carried out in 2014 using VISSIM and, the user cost and the delay cost were estimated based on the suggested methodology. The analysis result showed that the average user cost of $17,569,000KRW/km{\times}day$ occurred on Section A with approximately 30,000 AADT before a work zone occurred, and in case the first lane was blocked for maintenance, the delay cost of $10,193,000KRW/km{\times}day$ (158%) on average occurred additionally. The delay cost of $1,507,000KRW/km{\times}day$ (115%) and $1,985,000KRW/km{\times}day$ (119%) occurred on Sections B and D with approximately 20,000 AADT respectively and the delay cost of $262,000KRW/km{\times}day$ (105%) occurred on Section C with approximately 10,000 AADT. This result of this study was estimated based on the simulation of traffic flow model so that there is a limitation in its actual application. A study ot develop a highly appropriate model using actual observation data and improve the possibility to apply it through the verification using the simulation will be necessary in future.

Estimation on Optimum Fishing Effort of Walleye Pollock Fishery in the East Coast of Korea : Based on the Economic Analysis between Danish Seine Fishery and Trawl Fishery for Walleye Pollock (한국 동해 명태 어업의 적정어획노력량 추정 -동해구기선저인망어업과 동해구트롤어업의 경제성분석을 근거로-)

  • 이장욱
    • The Journal of Fisheries Business Administration
    • /
    • v.22 no.2
    • /
    • pp.75-99
    • /
    • 1991
  • A quantitative analysis was carried out to monitor the commercial yield level of walleye pollock Theragra chalcogramma in the east coast of Korea, based on available data on catch and fishing effort, catch per unit of effort including fish prices from 1911 to 1988, using a traditional yield model. The results from the quantitative assessment were based to estimate maximum economic yield (MEY) and optimal fishing effort (E-opt) at MEY. On the other hand, interaction aspects between danish seine fishery and trawl fishery mainly targeting walleye pollock in the east coast of Korea were studied to predict optimal situation in fishing effort level from economic point of view which gives the most benefits to the two fisheries. Total production of walleye pollock in 1911 when its catch record was begun for the first time was about 12, 000 metric tons(M/T), and then the catch trend maintained nearly at the level of 50, 000 M/T per annum, showing a decreasing trend until 1930. The highest production from historical data base on walleye pollock fishery statistics was from the years in 1939 and 1940, about 270, 000 M/T and 26, 000 M/T, respectively. No production of the fish species was recorded during the years from 1943 to 1947, and from 1949 to 1951. From 1952 onwards annual production was only available from the southern part of 38$^{\circ}$N in the east coast. During two decades from 1952 to 1970, the production had sustained about less than 30, 000 M/T every year. Annual production showed an increasing trend from 1971, reaching a maximum level of approximately 162, 000 M/T in 1981. Afterwards, it has deceased sharply year after year and amounted to 180, 000 M/T in 1988. The catch composition of walleye pollock for different fishery segments during 1970~1988 showed that more than 70% of the total catch was from danish seine fishery until 1977 but from 1978 onwards, the catch proportion did not differ from one another, accounting for the nearly same proportion. Catch per unit of effort (CPUE) for both danish seine fishery and trawl fishery maintained a decline tendency after 1977 when the values of CPUE were at level of 800 kg/haul for the former fishery and 1, 300 kg/haul for the latter fishery, respectively. CPUEs of gillnet fishery during 1980~1983 increased to about 3.5 times as high value as in the years, 1970~1979 and during 1987~1988 it decreased again to the level of the years, 1970~1978. The bottom longline fishery's CPUE wa at a very low level (20 kg/basket) through the whole study years, with exception of the value (60 kg/basket) in 1980. Fishing grounds of walleye pollock in the east coast of Korea showed a very limited distribution range. Danish seine fishery concentrated fishing around the coastal areas of Sokcho and Jumunjin during January~February and October~December. Distributions of fishing grounds of trawl fishery were the areas along the coastal regions in the central part of the east coast. Gillnet and bottom longline fisheries fished walleye pollock mainly in the areas of around Sokcho and Jumunjin during January~February and December. Relationship between CPUEs' values from danish seine fishery and trawl fishery was used to standardize fishing effort to apply to surplus production model for estimating maximum sustainable yield (MSY) and optimum fish effort (F-opt) at MSY. The results suggested a MSY of 114, 000 M/T with an estimated F-opt of 173, 000 hauls per year. Based on the estimates of MSY and F-opt, MEY was estimated to be about 94, 000 M/T with a range of 81, 000 to 103, 000 M/T and E-opt 100, 000 hauls per year with a range of 80, 000 to 120, 000 hauls. The estimated values of MEY and E-opt corresponded to 82% of MSY and 58% of F-opt, respectively. An optimal situation in the fishing effort level, which can envisage either simultaneously maximum yield or maximum benefit for both danish seine fishery and trawl fishery, was determined from relationship between revenue and cost of running the fleet : the optimal fishing effort of danish seine fishery was about 52, 000 hauls per year, corresponding to 50 danish seiners and 27, 000 hauls per year which is equal nearly to 36 trawlers, respectively. It was anticipated that the net income from sustainable yield estimated from the respective optimal fishing effort of the two fisheries will be about 3, 800 million won for danish seine fishery and 1, 000 million won for trawl fishery.

  • PDF

Estimation of the Value of Road Traffic Noise within Apartment Housing Prices (아파트가격에 내재된 도로교통소음가치 추정)

  • 임영태;손의영
    • Journal of Korean Society of Transportation
    • /
    • v.19 no.4
    • /
    • pp.19-33
    • /
    • 2001
  • In the developed countries, traffic noise is one of most serious problems faced by people's lives. So the importance of the traffic noise is quite well recognized by the infrastructure planners as well as the people. The traffic noise is valued in monetary terms in some countries and it is reflected in estimating the net present value or benefit/cost ratio. On the contrary, the effects of traffic noise are not reflected in the assessment of infrastructure in most cases in Korea. However, as the income level has been increasing, more people have been becoming to put more importance on their living conditions. The purpose of this paper is to estimate the value of traffic noise in the Seoul metropolitan area. The housing price were surveyed to use the quasi-hedonic price technique. By this way, two housing prices at the same floor level in different 128 complexes in the Seoul metropolitan area were surveyed. the actual traffic noise level was also measured. The differences of housing prices and noise levels were analyzed using the various types of regression models. The value is quite different by size of house. The value of large house is higher than that of small house. Since the income level of people in large house is higher than that in small house. it might be said that value of traffic noise for high income people is higher than that for low income people. Moreover, the increase of 1dB(A) noise affects the house price by about 0.3% in Seoul metropolitan area.

  • PDF