• Title/Summary/Keyword: The Priority

Search Result 6,495, Processing Time 0.037 seconds

Chitosan Microspheres Containing Bordetella bronchiseptica Antigens as Novel Vaccine Against Atrophic Rhinitis in Pigs

  • Kang, Mi-Lan;Kang, Sang-Gyun;Jiang, Hu-Lin;Guo, Ding-Ding;Lee, Deog-Yong;Rayamahji, Nabin;Seo, Yeon-Soo;Cho, Chong-Su;Yoo, Han-Sang
    • Journal of Microbiology and Biotechnology
    • /
    • v.18 no.6
    • /
    • pp.1179-1185
    • /
    • 2008
  • The immune-stimulating activities of Bordetella bronchiseptica antigens containing dermonecrotoxin (BBD) loaded in chitosan microspheres (CMs) have already been reported in vitro and in vivo with a mouse alveolar macrophage cell line (RAW264.7) and mice. Therefore, this study attempted to demonstrate the successful induction of mucosal immune responses after the intranasal administration of BBD loaded in CMs (BBD-CMs) in colostrum-deprived pigs. The BBD was introduced to the CMs using an ionic gelation process involving tripolyphosphate (TPP). Colostrum-deprived pigs were then directly immunized through intranasal administration of the BBD-CMs. A challenge with a field isolate of B. bronchiseptica was performed ten days following the final immunization. The BBD-specific IgG and IgA titers, evident in the nasal wash and serum from the vaccinated pigs, increased with time (p<0.05). Following the challenge, the clinical signs of infection were about 6-fold lower in the vaccinated pigs compared with the nonvaccinated pigs. The grades for gross morphological changes in the turbinate bones from the vaccinated pigs were also significantly lower than the grades recorded for the nonvaccinated pigs (p<0.001). Therefore, the mucosal and systemic immune responses induced in the current study would seem to indicate that the intranasal administration of BBD-CMs may be an effective vaccine against atrophic rhinitis in pigs.

Priority based Image Transmission Technique with DPCM in Wireless Multimedia (무선 멀티미디어 센서 네트워크에서 예측부호화를 통한 우선순위 기반 이미지 전송 기법)

  • Lee, Joa-Hyoung;Jung, In-Bum
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.14 no.4
    • /
    • pp.1023-1031
    • /
    • 2010
  • With recent advances in hardware and wireless communication techniques, wireless multimedia sensor network which collects multimedia data through wireless sensor network has started to receive a lot of attentions from many researchers. Wireless multimedia sensor network requires a research of efficient compression and transmission to process the multimedia data which has large size, in the wireless sensor network that has very low network bandwidth. In this paper, we propose PIT protocol for the transmission based on the priority that classified by the DPCM compression. The PIT protocol sets different priority to the each subbands which are divided by the wavelet transform. The PIT protocol transmits the data with higher priority to guarantee the high image quality. The PIT protocol uses the characteristic of wavelet transform that the transformed image is very insensible to the data loss. In PIT protocol, each subbands of wavelet transformed image has fair weight in the compressed image to utilize the prioriy based transmission. The experiment results show that the PIT protocol improves the quality of image in spite of data loss.

Case Study of Investment Adequacy Analysis After Implementing Master Plan on Sewerage Rehabilitation (하수도정비기본계획 시행 후의 투자적정성 분석에 관한 사례 연구)

  • Park, Kyoo-Hong;Kang, Byong-Jun;Lym, Byeong-In;Knag, Man-Ok;Park, Joo-Yang;Kim, Sung-Tae;Park, Wan-Kyu
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.29 no.4
    • /
    • pp.503-510
    • /
    • 2015
  • The objective of this study is to analyze the investment adequacy of the projects implemented according to the master plan on sewerage rehabilitation at Seoul. The planned and actually implemented ratio of invested money on sewage treatment plants (STPs) to sewers were compared in two temporal periods. Though the planned ratio of investment on STPs to sewers was 50:50 (in 2009-2020), the actual implemented ratio in 2009-2013 was 34:66. Until 2020, the greater investment ratio on STPs to sewers should be made considering the necessity of coping with stricter legal compliance on advanced treatment, stormwater treatment and so on. The priority of the planned and partially implemented projects among four STPs and at each STP was evaluated. Considering only the performance indicator of reduced load of BOD, T-N, T-P per the capacity of each STP facility, the performance among four STPs was shown as Jung-Rang>Tan-Cheon>Seo-Nam>Nan-Ji. The reverse order of the performance results in the past may be considered for future investment priority, but the efficiency of operation implemented at each STP, deteriorated status of each STP, investment in the past and so forth should also be considered. As for the priority of projects conducted within each STP, projects related to legal compliance (such as advanced tertiary treatment, stormwater treatment, etc.) have highest priority. Odor-related project and inhabitant-friendly facility related projects (such as building park on STPs, etc.) has lower priority than water quality related projects but interactivity with end-users of sewerage should also be important.

Review of the Priority Index for Selection between Repair and Reinforcement Methods of Dam Facilities (댐 시설물 보수·보강공법 선정을 위한 우선순위지수에 대한 고찰 )

  • Dong Hyun Kim;Hyung Jun Park;Hee Jung Youn;Seung Oh Lee
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.27 no.3
    • /
    • pp.1-11
    • /
    • 2023
  • After the collapse of the Seongsu Bridge in the 1990s in Korea, attention was focused on the maintenance of facilities. The government has established various policies since the enactment of the Act in 1995 until recently. In general, safety inspections are performed to evaluate the safety grade of facilities, and facilities are maintained and managed by performing repairs and reinforcements for defects. However, since the budget is limited, it is impossible to carry out repair and reinforcement projects for all defects. It is necessary to prioritize repair and reinforcement measures. Then, the priority index (PI) is presented considering the importance of members, the seriousness of defects, and economic feasibility. In this index, the degree of influence can be adjusted within the range of 50 to 100% according to the expert's subjective judgment, and the same weight is set for some specific members. Also, the effect through repair and reinforcement is not taken into account decisively, and most of them have a limit in which priority is determined by economic feasibility. Therefore, in this study, through several case studies, problems with the priority index were reviewed and an equation was presented to improve them.

A Priority and Impact Factor Analysis of Construction Management Tasks for Decreasing Change Orders and Defect Repairs in Cancer Treatment Center Projects (암센터 의료시설의 설계변경과 하자보수의 감소를 위한 중점 관리공사 분석)

  • Lee, Chijoo;Lee, Ghang;Sim, Jaekyang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.55-64
    • /
    • 2013
  • The complexity of constructing medical institutions is higher than that of general buildings, and many change orders in the design and defect repairs in the construction phase are required due to strict government regulations. The priority control of constructions and impact factors of medical institutions were analyzed in this study, and difficulties in the control in the design and construction phase were identified. First, the priority management factors that were identified were as follows: architecture, facilities, and electricity. Second, 1) priority management in constructions and factors resulting in change orders and 2) priority management in constructions involving defect repair were analyzed. Third, the importance recognized by the construction managers were analyzed. The priority management in constructions and factors that were recognized by the construction manager were deducted as having low importance, although there were many change orders and defects. The work of finishing, wall building, joining, office automation and communication function, and lighting were analyzed in the design phase, and waste, the office automation and communication function, ceilings, contamination control, and plumbing were analyzed in the construction phase. The results showed that there will be a decrease in change orders and defects if the concentration of the manager was elevated and priorities were managed.

Comparison and discussion of MODSIM and K-WEAP model considering water supply priority (공급 우선순위를 고려한 MODSIM과 K-WEAP 모형의 비교 및 고찰)

  • Oh, Ji-Hwan;Kim, Yeon-Su;Ryu, Kyong Sik;Jo, Young Sik
    • Journal of Korea Water Resources Association
    • /
    • v.52 no.7
    • /
    • pp.463-473
    • /
    • 2019
  • This study compared the characteristics of the optimization technique and the water supply and demand forecast using K-WEAP (Korea-Water Evaluation and Planning System) model and MODSIM (Modified SIMYLD) model considering wtaer supply priority. Currently, The national water resources plan applied same priority for municipal, industrial and agricultural demand. the K-WEAP model performs the ratio allocation to satisfy the maximum satisfaction rate, whereas the MODSIM model should be applied to the water supply priority of demands. As a result of applying the priority, water shortage decreased by an average of $1,035,000m^3$ than same prioritized results. It is due to the increase of the return flow rate as the distribution of Municipal and industrial water increases. Comparing the analysis results of K-WEAP and MODSIM applying the priorities, the relative error was within 5.3% and the coefficient of determination ($R^2$) was 0.9999. In addition, if both models provide reasonable water balance analysis results, K-WEAP is superior to GUI convenience for model construction and data processing. However, MODSIM is more effective in simulation time efficiency. It is expected that it will be able to carry out analysis according to various scenarios using the model.

Analysis of Education Needs for Instructional Competency of Lifelong Education Instructor (평생교육 교수자의 교수 역량에 대한 교육 요구 분석)

  • Kim, Mi-jeong;Ahn, Young-Sik
    • Journal of vocational education research
    • /
    • v.36 no.4
    • /
    • pp.41-56
    • /
    • 2017
  • The purpose of this study is to analyze the level of current difference of education needs for instructional competency of lifelong education instructor and the level of importance of lifelong education for drawing priority. Through the literature review, this is divided the lifelong education instructor's competencies such as planning, implementation, management and support and analyzed the current level and importance with 35 items through t-test analysis. The priority for education needs is applied to Borich and the Locus for Focus model simultaneously. According to result for study, the largest item of competency for lifelong education instructor is verified with the current level and importance for building of social networking and managing competency. The top priority item of education needs for instructional competency of lifelong education instructor is located in the first quadrant of model and the Locus for Focus model, according to priority in needs for Borich and was showed in program competency. The second items in priority were derived by learning resources, information gathering, competency for focus development, equitable evaluation for student, competency for building team work. Therefore, these competencies are considered as factors for priority of lifelong instructor and will be developed in personal and organizational development.

Assessment factors for the Selection of Priority Soil Contaminants based on the Comparative Analysis of Chemical Ranking and Scoring Systems (국내.외 Chemical Ranking and Scoring 체계 비교분석을 통한 우선순위 토양오염물질 선정을 위한 평가인자 도출)

  • An, Youn-Joo;Jeong, Seung-Woo;Kim, Tae-Seung;Lee, Woo-Mi;Nam, Sun-Hwa;Baek, Yong-Wook
    • Journal of Soil and Groundwater Environment
    • /
    • v.13 no.6
    • /
    • pp.62-71
    • /
    • 2008
  • Soil quality standards (SQS) are necessary to protect the human health and soil biota from the exposure to soil pollutants. The current SQS in Korea contain only sixteen substances, and it is scheduled to expand the number of substances. Chemical ranking and scoring (CRS) system is very effective to screen the priority chemicals for the future SQS in terms of their toxicity and exposure potential. In this study, several CRS systems were extensively compared to propose the assessment factors that required for the screening of soil pollutants The CRS systems considered in this study include the CHEMS-1 (Chemical Hazard Evaluation for Management Strategies), SCRAM (Scoring and Ranking Assessment Model), EURAM (European Union Risk Ranking Method), ARET (Accelerated Reduction/Elimination of Toxics), CRSKorea, and other systems. The additional assessment factors of CRS suitable for soil pollutants were suggested. We suggest soil adsorption factor as an appropriate factor of CRS system to consider chemical transport from soil to groundwater. Other factors such as soil emission rate and cases of accident of soil pollutants were included. These results were reflected to screen the priority chemicals in Korea, as a part of the project entitled ‘Setting the Priority of Soil Contaminants'.

A Passive Traffic Signal Priority Control Algorithm for Emergency Vehicles (긴급차량 우선신호 센터제어 알고리즘 개발)

  • Lee, Jongwoo;Lee, Soong-bong;Lee, Jinsoo;Um, Ki Hun;Lee, Young-Ihn
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.16 no.3
    • /
    • pp.110-119
    • /
    • 2017
  • This study develops a passive traffic signal priority control algorithm for emergency vehicles. The passive priority control estimates and applies signal times for each signalized intersection on the emergency vehicle's route when an emergency call is received. As signals are controlled before the emergency vehicle leaves for its destination, it is possible to clear the queues at each intersection more effectively. Most of the previous studies applied preemption, which ends green time of cross streets when the emergency vehicle arrives at each intersection. This study applies green extension and early green in order not to shift the order of phases, and guarantees minimum green time for each phase. Simulation results show that the delay of emergency vehicles decreases when the signals are controlled. It is expected that delays can be decreased further by integrating the active priority control with the passive priority control algorithm presented in this study.

Risk Identification and Priority method for Overseas LNG Plant Projects - Focusing on Design Phase - (해외 LNG 플랜트 리스크요인 도출 및 우선순위 평가 - 설계단계를 중심으로 -)

  • Jang, Woo-Sik;Hong, Hwa-Uk;Han, Seung-Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.146-154
    • /
    • 2011
  • Korean contractors have been maintained sustainable growth since entering into overseas construction market for the first time in 1960' s. In 2010, Korean contractors ordered 761 billion (USD) from overseas markets. Especially, billion (USD) were earned by Korean contractors in overseas plant construction market which account for more than 80% of the total amount by Korean contractors. Nevertheless, many Korean contractors are suffering from lack of technological competitiveness and construction management skills in the design phase compared with global leading contractors. These conditions have directly effect on the success of projects in terms of cost, duration, and quality. So, this study focused on identifying the risk factors and developing risk priority method for the design phase of LNG plant projects whose market is expanding. Research procedures were conducted by the following three steps. First, total 57 risk factors were identified in design phase through extensive literature reviews and experts survey. Second, the authors developed risk priority method which are more suitable for design phase of LNG plant projects by using three criteria, Probability(P), Impact(I), and Coordination Index(CI). Finally, the suitability of risk priority method and practical applicability were verified through expert survey and interview. Consequently, if korean contractors use the suggested risk factors and priority method based on their own know-how and experiences, then more reasonable and rational risk management will be conducted in the design phase of LNG plant projects.