최근 국내 건설 산업에서 생산성과 건설공기 측면에서 문제점이 드러나고 있으며 또한, 국내 건설 산업의 생산성과 공기 경쟁력이 선진국에 비해 매우 낮은 것으로 분석되었다. 여기에 주5일 근무제가 시행된다면 문제는 더 심각해진다. 또한, 현재 입법 예고된 후분양제도가 실행된다면 건설사 입장에서는 공기 단축을 위한 생산성 향상이 건설업의 생사가 달린 일이다. 이에 본 연구에서는 생산성 향상을 위한 방안으로 PC의 한 종류인 건축 외관용 PC를 제시하고, 건축 외관용 PC를 사용하는 방안을 기존의 공법과 비교를 통해 생산성이 향상 되는가를 분석하고자 한다.
Learning effect is an observation that the more times a task is performed, the less time is required to produce the same amount of outcomes. The construction industry heavily relies on repeated tasks where the learning effect is an important measure to be used. However, most construction durations are calculated and applied in real projects without considering the learning effects in each of the repeated activities. This paper applied the learning effect to the repeated activities in a small sized apartment construction project. The result showed that there was about 10 percent of difference in duration (one approach of the total duration with learning effects in 41 days while the other without learning effect in 36.5 days). To make the comparison between the two approaches, a large number of BIM based computer simulations were generated and useful patterns were recognized using machine learning algorithm named Decision Tree (See5). Machine learning is a data-driven approach for pattern recognition based on observational evidence.
The finish works of construction projects comprises approximately 40% of the total construction duration. Thus, the management of finish works have as big as impacts on total project duration as the earthworks, foundation and structure works. Process interference management is considered one of the most important issues dealt during finish works. However, it was investigated that effective management systems have yet not been applied for practical use. Accordingly, this paper suggests a mobile technology based finish works management system that mainly focuses on preventing process interference occurred due to ineffective communication between general and sub-contractors.
The constructability of formwork has a significantly influence on the duration and cost in tall building construction. However, current installation and dismantling process are conducted with heuristic approaches due to the absence of reasonable constructability review method. This study proposes a new method to review the constructability of formwork by utilizing 3D printing technology. It is expected that the suggested review method could reduce formwork duration and cost with subjective, but rational manner.
Santoso, Try P.;Trigunarsyah, Bambang;Hassanain, Mohammad A.;Tuffaha, Firas
국제학술발표논문집
/
The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
/
pp.73-79
/
2017
Rapidly expanding population in the Kingdom of Saudi Arabia has a massive impact to put pressure on the shortage of housing and existing infrastructure. With average population growth rate of 1,9% yearly, the population in Saudi Arabia is projected to increase from 31 million in 2015 to 37 million in 2025. According to the housing ministry, Saudi Arabia needs to provide 3.3 million units to meet the demand in 2025, which is about 300,000 unit a year. In the past 40 years, using the conventional construction method, the Saudi construction industry was only able to build about 150,000 units per year. To meet the demand gap for the housing shortage, a new approach and innovation in construction methods are needed. Industrialized construction as an approach in construction methods has been studied and implemented in some countries that experienced similar corncerns. Industrialized construction can be defined as the implementation of manufacturing methods to construction-related activities to improve quality, reduce cost and project duration. Compared to the conventional construction method, prefabrication as industrialized construction methods has reduced construction labor on-site by 9.5%, construction project duration by 20%, and construction waste by 56%. It improves the quality, durability and cost saving not only for construction project owners, but also construction contractors. This paper discusses the possibility of 'industrialization' of building system in the Kingdom of Saudi Arabia as a solution for the housing shortage. It is an initial part of a study aims to develop a framework to develop industrialized building system in the Kingdom of Saudi Arabia. The is paper based on extensive literature review and case studies.
The 1th International Conference on Construction Engineering and Project Management
/
pp.913-916
/
2005
This paper presents the development of Artificial Neural Network models for forecasting the cost and contract duration of school reconstruction projects to assist the planners' decision-making in the early stage of the projects. 132 schools reconstruction projects in central Taiwan, which received the most serious damage from the Chi-Chi Earthquake, were collected. The developed Artificial Neural Network prediction models demonstrate good prediction abilities with average error rates under 10% for school reconstruction projects. The analytical results indicate that the Artificial Neural Network model with back-propagation learning is a feasible method to produce accurate prediction results to assist planners' decision-making process.
In this paper, I have approached the problem of scheduling that can be reasonably cost down and duration down in the tenement house by using PERT/CPM technics. The tenement house of 'M' construction company consistute 78 element workings in total. I made out the net-work scheduling through 78 element workings, after calculating by computer, G-COS 101, I reduced the duration and cost by MCX, and then enforced from the least cost slope to six times. Resulty, I attained PERT/CPM scheduling for construction scheduling ; a) Make Possible the effectiveness budgeting control b) How the scientific materials c) Make possible the reasonably decision making d) Strengthen the material control by relevance of element workings e) Make possible the duration down through the least cost.
The nuclear power plant(NPP) construction is a mammoth project, which requires a huge construction budget and the long construction duration of about 7 years. Recently there is a trend to shorten the construction period, to save the construction cost and to ensure the competitiveness through adopting the open top construction method. In this method, the major equipment are moved into the building through its top, and the internal works of the reactor building are being in process without installation of a dome roof.
공간의 분할이 많은 건축공사에서는 반복적 특성으로 인해 공정계획상에 다수의 대안이 존재한다. 공사기간은 각 액티비티의 기간뿐 아니라 반복되는 액티비티의 배열방법에 의해서도 많은 영향을 받는다. 본 연구는 각 액티비티에 적정한 선행 액티비티를 할당함으로써 여유시간을 최소화하는 공정계획기법을 제시하는 것을 목적으로 진행되었다. Line of Balance 기법을 기본으로 하는 기존연구와는 달리 본 연구에서는 AON방식의 네트워크 기법을 기본으로 하여 공간과 자원의 두 축 사이에 액티비티를 배열하였다. 각 액티비티별로 자원과 공간의 양방향으로 가장 적절한 선행 액티비티를 검색하여 여유시간을 최소화한다. 본 연구에서 제시한 액티비티 배열방법을 공동주택공사 건설공사를 대상으로 적용한 결과, 액티비티 배열을 달리함에 따라서 다수의 대안이 존재함을 확인할 수 있었으며 그중 적정대안을 찾아낼 수 있었다. 본 기법은 공동주택공사와 같은 다수의 유사공간으로 구성된 건설공사의 공정 계획에 도움을 줄 수 있을 것으로 판단된다.
본 연구에서는 강우의 수문학적 특성을 고려하여 단시간강우의 시간분포를 분석하고, Huff의 무차원 누가곡선을 제시하였으며, 강우의 수문학적 특성은 지속기간, 강우의 발생원인(장마, 태풍, 집중호우, 전선형강우), 구간변화 등으로 분류하였다. 본 연구의 수행으로 인해 얻어진 결과를 요약하면 다음과 같다. 첫째, 국내 도시지역의 단시간 강우의 최대강우강도는 전방위구간에서 발생할 확률이 가장 높게 나타났으며, 둘째, 강우발생원인별 분류에서도 전반적으로 전방위구간에서 최대강우강도가 발생하였으나 태풍의 경우에는 후방위구간에서 최대강우강도가 발생하였다. 셋째, Huff의 6구간 분석에서는 동일한 위치에 해당되는 제2구간에서 우세하였다. 넷째, 전기간 강우자료를 이용한 기존 연구들의 무차원 누가곡선 및 특성변수와의 비교를 실시하여, 수문학적 특성에 따라 무차원 누가곡선의 위치 및 특성변수의 값에서 차이가 발생한다는 것을 알 수 있었다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.