• 제목/요약/키워드: Temporary wall

검색결과 140건 처리시간 0.03초

층고절감형 거더를 이용한 영구 스트러트 공법 (Strut as a Permanent System using Composite Beams)

  • 홍원기;박선치;김진민;이호찬
    • KIEAE Journal
    • /
    • 제8권1호
    • /
    • pp.87-92
    • /
    • 2008
  • Sheathing work used for excavation in a crowded downtown is generally a temporary strut method using H-piles and sheathing wall includes lagging, CIP, SCW or slurry wall. A temporary strut serving the support for sheathing wall acts to resist the earth pressure, but it shall be removed when installing the underground structure members. A traditional temporary strut might cause the stress imbalance of the sheathing wall when it is demolished, resulting in time extension and the risk of collapse. A traditional temporary strut method thus needs to be improved for schedule and cost reduction, risk mitigation and for preparation for potential civic complaint. A permanent strut method doesn't require installing and demolishing the temporary structure that will lead to reducing the time and cost and the structural risk during the demolition process. And given the girder, the part of the underground structure, serves the role of strut, it can secure the wider interval compared to the traditional method, which enables to secure the wider space for the convenience of excavation as well as enhance the constructability and efficient site management. The thesis was intended to study the composite girder designed to use the strut as permanent structure so as to reduce the excavation and floor height.

가설흙막이의 버팀대 선행하중량과 흙막이 벽체 변형등에 대한 분석

  • 김학청;정광렬
    • 기술발표회
    • /
    • 통권2006호
    • /
    • pp.35-44
    • /
    • 2006
  • Supporting method of a Temporary retaining wall for underground excavation project are adopted by systems of strut, anchor, nail, raker, etc. Strut system and Raker system of these methods are mostly used preloading jack to minimize deformations of retaining wall. We determinate efficient preloading to analysis these strut-preloadings, deformations of retaining wall, axial forces, and etc.. This study is analysed that preloading applied 0%, 10%, 20%, 30%, ...., 100% for strut and raker installed by CIP temporary retaining wall. This study results that adequate preloadings were determined to analysis correlations of preloading, deformations of wall, maximum bending moment, axial force of strut, and displacement of surrounding.

  • PDF

임시교실용 모듈러 건축물의 품질기준 마련을 위한 특성비교 (Comparison of Characteristics for Establishing Quality Standards of Modular Buildings for Temporary Classrooms)

  • 이종성;박재웅;임군수;김종;한민철;한천구
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.83-84
    • /
    • 2023
  • Wall structure smart modular is a building construction method where modules are manufactured in a factory and assembled on-site. This method is gaining popularity in the construction industry as it reduces construction time and mitigates risks such as material supply and labor costs. Wall structure smart modular is necessary as it provides comfortable temporary classroom space during renovation and remodeling of aging school buildings. The structure and characteristics of each type of temporary classroom modular were compared, and wall structure modular showed superior performance in terms of height and weight competitiveness compared to mixed structures. With these advantages, wall structure modular can ensure economic efficiency and recyclability as a temporary classroom. In the future, we aim to compare and analyze the standards such as inter-floor noise and heat transfer coefficient for wall structure and mixed structures.

  • PDF

현장계측과 수치해석을 이용한 가설 흙막이 구조물의 변형특성 연구 (Deformation Behaviors of Temporary Tieback Wall during Excavation Works)

  • 김종우
    • 터널과지하공간
    • /
    • 제5권3호
    • /
    • pp.223-229
    • /
    • 1995
  • During excavation works for underground facilities, temporary tieback wall with earth anchor system was investigated for safety's sake. An excavation 9.7 meter deep was monitored by slope inclinometer in twelve measuring points. Instrumented lateral displacements of the wall during 177 days are represented. Especially, lateral displacements of the two positions under completely different condition are compared to investigate the effect of backfilling between soldier pile and the soil behind wall. The deformation behaviors of the wall according to both depth and elasped time are discussed. Finally, a numerical analysis by the program FLAC was performed, and calculated displacements are compared to measured ones.

  • PDF

역해석을 통한 소단굴착에 따른 흙막이 벽체변위의 매개변수 연구 (Parametric Study on Displacement of Earth Retaining Wall by the Bermed Excavation Using Back Analysis)

  • 이명한;김태형
    • 한국지반신소재학회논문집
    • /
    • 제14권4호
    • /
    • pp.23-33
    • /
    • 2015
  • 소단은 굴착 후 지지구조물이 설치되기 전 벽체의 강성과 더불어 가설벽체의 안정성을 좌우하는 역할을 한다. 특히 굴착지반이 느슨하거나 연약한 경우 소단의 역할은 매우 중요하다. 본 연구에서는 소단을 이용한 도심지 버팀굴착현장의 계측결과와 수치해석을 사용하여 가설벽체의 최대수평변위에 미치는 소단의 규모(폭과 경사) 및 굴착깊이, 지반물성의 영향을 분석하였다. 계측결과 소단 폭이 짧아질수록 벽체의 수평변위는 증가하는 경향을 보였다. 수치해석 결과 소단의 경사가 급해질수록, 소단폭이 짧아질수록 최대수평변위량은 크게 나타나 소단이 벽체의 변위를 억제하는데 효과가 있음을 알 수 있었다. 또한 굴착심도가 깊어질수록 소단폭과 경사의 영향을 크게 받는 것으로 나타났다. 동일한 소단 조건에서 지반물성이 높을수록 벽체의 최대수평변위를 억제하는 것으로 나타났다.

Experimental Study on the Effect of Temporary Clipping on the Histological Changes of the Arterial Walls of Rats

  • 고현송
    • 대한의생명과학회지
    • /
    • 제13권2호
    • /
    • pp.111-117
    • /
    • 2007
  • Temporary occlusion of the parent artery or feeding artery is an useful method in microsurgery for cerebrovascular diseases. The advantages of the temporary clipping for intracranial aneurysm surgery have already been proven by many experimental and clinical reports. Currently, there are two methods of temporary clipping: 1) intermittent clipping, 2) continuous clipping. In many previous studies, the intermittent, repeated clipping technique was reported to reduce ischemic damage to the brain, but it is still debated. On the other hand, a comparison of the histological changes on the arterial wall between each clipping method has not been sufficiently reported yet. So the authors performed experimental temporary clipping on the common carotid and femoral arteries of about 25 rats using the Sugita temporary mini-clip. The specimens were divided into two major groups and seven subgroups: Group I (I-1, I-2, I-3, I-4, intermittent clippings for 5 minutes were done once, twice, three times, and few times), and Group C (C-10, C-15, C-20, continuous clippings for 10, 15, 20 minutes, respectively). The reperfusion time after the temporary clipping was the same as the clipping duration. Under light microscope, the histological findings by Hematoxylin-Eosin staining were examined in all specimens, which were obtained at each time interval after temporary clipping. Then the histological changes of the arterial walls by two different methods were compared with the normal specimen. The results suggest that intermittent temporary clipping is less damaging on the arterial wall than single continuous clipping.

  • PDF

지하철 9호선 흙막이 구조물의 설계 사례 분석 (Case Studies for Temporary Soil Support Walls of Subway No.9)

  • 주재건;김영진;김경태
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2002년도 가을 학술발표회 논문집
    • /
    • pp.96-103
    • /
    • 2002
  • In this study, design concepts of Seoul Subway Construction (901∼914) are reviewed in relation to the cases for temporary soil support wall systems which are revealed in highly developed design competitions such as Turnkey and Alternative based on. Especially soil and rock properties, various design schemes for dealing with soil and water pressures, new technology adopted etc are discussed very profoundly and broadly for the better understanding and additional clues for constructing new design technologies.

  • PDF

메가스포츠시설의 사후 활용을 위한 임시주거 계획 - 2018평창동계올림픽을 중심으로 - (The Planning of Temporary Housing for Post Application of Mega Sports Facilities - Focused on the 2018 Winter Olympics -)

  • 이종찬;강윤도;김병선
    • KIEAE Journal
    • /
    • 제16권4호
    • /
    • pp.41-46
    • /
    • 2016
  • Purpose: This is a study on the planning of temporary housing for post application of Mega Sports facilities. The subject of the study is 2018 Pyeongchang Winter Olympics, which is to suggest building an alternative temporary housing using shipping containers(high cube), which solve the lack of accommodations and recycle temporary housing after Olympics, save money and be eco-friendly in Olympics. Method: This study includes this ; research on the a fact-finding survey about Mega sports facilities post application and demand survey on 2018 Pyeongchang Winter Olympics accomodations and an analysis about temporary housing plan. Furthermore we decided temporary housing building plan by analyzing residents' needs and traits of the housing etc. Through this, we made a schematic design for household units. Result: As a result, this study is a plan of making space, forms, and structure. The planned size is $38.4m^2$(L:12m, W:3.2m) except balcony, and indoor height is 2.5m. The space consists of entrance, bathroom, bedroom and living room with folding furniture system. Also there's a detailed floor plan of the ceiling, wall, and floor we drew up. The ceiling and wall consist of dampproof film, noncombustible board, fire proof urethane form, and color-designed sheet. The floor is composed of floor tile, cement mortar, light concrete(with heat coil), insulation, and dampproof film. Additionally, this study is a plan of interior dry wall with detail using modular construction method for work efficiency and quality improvement.

흙막이 벽체에 적용하는 콘크리트 충전형 엄지말뚝의 휨성능 분석 (An Analysis of Flexural Performance of Concrete Filled Soldier Pile Applied to Temporary Retaining Wall)

  • 박용현;김도범;주영규;양일승;염경수
    • 대한건축학회논문집:구조계
    • /
    • 제35권3호
    • /
    • pp.19-25
    • /
    • 2019
  • The purpose of this study was to evaluate bending performance of concrete filled soldier pile for temporary retaining wall. Structural performance tests were conducted on total number of four specimens. Each specimen had a unique characteristics with combination of the following variables, existence of reinforcing bar and locations of reinforcing steel plates. The results of this study were as follows; concrete filled steel tubes with being reinforced bar and flange rather than non-bar showed better performance. Higher yield, tensile strength and sufficient plastic strain were archived and maximum moment observed in experiments exceeded theoretical maximum moment in both allowable stress design and limit state design at all specimens.

강관비계의 좌굴특성에 관한 연구 (A Study on the Buckling Characteristics of Steel Pipe Scaffold)

  • 백신원;송인용
    • 한국안전학회지
    • /
    • 제25권1호
    • /
    • pp.57-61
    • /
    • 2010
  • Formwork is a temporary structure that supports its weight and that of fresh concrete as well as construction live loads. Scaffoling is a temporary frame used to support people and material in the construction or repair of buildings and other large structures. It is usually a modular system of metal pipes, although it can be made out of other materials. Bamboo is still used in some Asian countries like China. The purpose of a working scaffold is to provide a safe place of work with safe access suitable for the work being done. In construction site, steel pipes are usually used as scaffolds. In this study, scaffolding systems which is changed according to sleeper and joist space were measured by buckling test. Buckling load of respective scaffolding system was analyzed by structural analysis program(MIDAS). Buckling load of scaffold with/without wall connection and footboard was got by test and structural analysis. According to these results,we know that scaffolding system of case 3 is suitable. Buckling load of scaffold with wall connection is higher than without wall connection. So wall connection is important in scaffoling systems. Footboard in the scaffolding systems is not effective against promotion of buckling load. Finally, the present study results will be used to design scaffolding systems safely in the construction sites.