• Title/Summary/Keyword: Temporary structure

Search Result 303, Processing Time 0.027 seconds

A Feasibility Study of Safety Cetification for Finished Product of Febricated Temporary (조립식 가설기자재의 완성품에 대한 안전인증 타당성 연구)

  • Lee, Jeong-Seok;Choe, Jin-U
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2013.11a
    • /
    • pp.39-48
    • /
    • 2013
  • Recently, the using of prefabricated temporary equipments is increasing in the industrial field because it can reduce the installation and dismantling period. The various types of prefabricated temporary equipments are manufacturing with various materials in domestic and overseas countries. However, those equipments should win the safety certificate according to the "Governmental Notification about Safety Certification" which regulate the member-based safety certification. It tends to cause over performance of temporary equipments because it couldn't consider structural benefit of the prefabricated products. As the result of this study, it is concluded that the establishment of new safety certification standard for the prefabricated temporary equipments is resonable and the movable scaffold is appropriate for those prefabricated temporary equipment. The movable scaffolds are using as single structure and cannot be expands horizontally. Other types of temporary equipments are using as complex structure which can freely expand horizontally according to the main structure. From the results of the study, the standard of vertical compression performance of prefabricated movable scaffolds should be more than double the performance of single main frame. Other test items of safety certification standard should be fixed when the Notification is amended. The prefabricated temporary equipments which are adopted for the safety standard on assembled structure should be used, moved and kept in assembled state and not separated discretionally. The establishment of new standard for the assembled structure based on this study leads to the development of various types of temporary equipments using structural efficiency of prefabricated structure.

  • PDF

Development of Technical Breakdown Structure Standard in Temporary Works (건설가설공사의 표준기술분류체계 구축)

  • Park, Jun-Mo;Kim, Ok-Kyue;Park, Gil-Bum
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.162-163
    • /
    • 2013
  • A temporary work are lifting equipment that tower crane or lift, and temporary architectures that office building and storage in construction site. And it is main construction work that built and used temporarily like to a scaffolding, a walk plate, and a formwork. This study is to adjust breakdown structure of temporary work to introduce technical tendency. With a site manager, it is collected a detailed statement and compared. As a result to break down a tendency that temporary equipment, additional function, and direct work of temporary technique, first, existing detail technical indexes that group I, group J, group K, and group L are classified. Second, due to set up and manage to main agents in case of existing detail technical indexes that B1, B2, it is not wrong to classify. But, it is somewhat different, and therefore adjust it to same level. Finally, as a technical tendency that temporary equipment, additional function, and direct work of temporary technique, it is adjusted the others.

  • PDF

Analysis on the Problems of Construction Temporary Work through Review on Technology System

  • Park, Junmo;Kim, Okkyue;Kim, Jinlee;Lim, NamGi
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.716-717
    • /
    • 2015
  • A construction temporary work is main process and importance trade section. A technology system of construction temporary has very low availability of field works and needs improvements in Korea as construction site has a quick response about new requirements. This study reviews literature researches and can verify that changes to a comprehensive technology system for construction site. In addition, it suggests a breakdown structure of new standards for temporary construction technology based on views of construction site managers. Meanwhile, temporary construction technology in Korea has changed with a specification of construction temporary work which had been revised in 2014. However, the revision is merely dividing the design and building off of construction temporary technology. It is lacking in many ways to change this in a new standard system for temporary construction technology. Henceforth, it needs to develop a standard system for temporary construction technology and a professional system that is appropriate for different purposes by detail trade sections.

  • PDF

The Application of KOESWall System as a Temporary Structure (임시구조물로서 분리형 보강토 옹벽의 적용사레)

  • 김영윤
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.09a
    • /
    • pp.53-58
    • /
    • 2000
  • The KOESWall system that minimizes the horizontal deformation of reinforced wall effectively was developed bt E&S Eng. Co., Ltd. in 1999. Due to its systematical feature i.e. isolated construction method. KOESWall system is able to use as temporary structures more economically without the facing block. In this report, it is shown that the case history of KOESWall as a temporary soil retaining structure and the field measuremnets.

  • PDF

Discrete Optimum Design of the Strut Supported Temporary Structures (버팀보지지 가시설구조물의 이산화 최적설계)

  • Park, Soon-Eung;Park, Moon-Ho;Kim, Jin-Kyu
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.11 no.3
    • /
    • pp.127-134
    • /
    • 2008
  • This study is to develop the structure analysis and optimization algorithm of the strut supported temporary structure for underground constructions. Developed algorithm performs the analysis and the optimization of each strut, wale, and H pile of temporary structures separately. The design variables of nonlinear optimization consist of the cross-sections of temporary structures such as strut, wale, and H pile and the solution of the nonlinear programming is searched using for the method of successive unconstranint minimization technique. The weight of the structure is used for the object function of nonlinear programming. the constraints are derived from the specification of the temporary structures as compressive axial, bending, shear, composite stress and serviceability. The structural analysis is performed based on the elastoplastic beam theory. This developed program can be used to evaluate the applicability, convergence, and effectiveness of the temporary structures.

  • PDF

Building Information Modeling for Temporary Structure Planning and Safety Analysis (BIM을 활용한 가설물 계획 및 안전 관리)

  • Kim, Kyungki;Cho, Yong Kwon;Park, Man-Woo
    • Journal of KIBIM
    • /
    • v.6 no.2
    • /
    • pp.12-18
    • /
    • 2016
  • The entire construction safety is significantly influenced by proper uses of temporary structures. However, in current practices, temporary structures are used without sufficient planning and analysis on their impact on safety. Consequently, problems in worker safety and loss of productivity are frequently caused related to temporary structures. This paper introduces an approach that uses Building Information Modeling (BIM) to automatically create temporary structures as part of construction plans and identifies potential safety hazards related to the temporary structures. In this study, the type of temporary structure is limited to scaffolding. Automation algorithms were developed and applied to (1) analyze daily construction site conditions (2) create required scaffolding objects, and (3) identify potential safety hazards related to scaffolding. A case study using a real-world construction project demonstrated that scaffolding objects were properly created based on user-input and potential safety hazards were successfully identified without human intervention.

Development of Standard Breakdown Structure of Temporary Construction Technique in Building Construction focused on Site Manager (현장 관리자 중심의 건축공사 가설기술 표준분류체계구축)

  • Kim, Min-Jeong;Park, Jun-Mo;Kim, Ok-Kyue;Choi, Byung-Joo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.117-118
    • /
    • 2012
  • This study has been reorganizing a standard breakdown structure of temporary technique focused on construction site. For this, first of all we, the authors, reviewed features and present statuss of construction temporary technique, and could develop to the standard breakdown structure through studying a construction site and researching a delphi method. By using the standard breakdown structure obtained from this study, it is expected that the application of to information of construction business and plan to a schedule and a work.

  • PDF

Development on Breakdown Structure of Construction Site centered Construction Temporary Technology Index (현장중심의 건설가설기술요소 분류체계 구축)

  • Park, Junmo;Kim, Okkyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.4
    • /
    • pp.77-85
    • /
    • 2014
  • A construction temporary work is main process and importance trade section. It has many works and facilities such as temporary transfer equipments which tower crane, and lift, and architectural temporary facilities which temporary office, temporary warehouse, and site test laboratory, and construction temporary equipments which scaffoldings, work plates, construction supports, and forms to set and to use in under construction and to remove in the end. A technology system of construction temporary has very low availability of field works and needs improvements in Korea as construction site has a quick response about new requirements. This study is organized existing technology systems and new technologies for field works, and developed breakdown structure of construction temporary technologies to be a basic of temporary technologies as review with site managers. For this, it will improve to be a knowledge and information system as a research of a performance and an availability about a construction temporary technology index.

Ensuring safety of temporary structures through on-site real-time structural analysis Construction Sites (가설구조물 구조검토의 실시간 현장 반영을 통한 안전성 확보)

  • Mo, Seung-Un;Moon, Seong Oh
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.19-20
    • /
    • 2022
  • Based on the survey analysis of safety accidents at construction sites that occur every year, most of them are caused by temporary structures. While analyzing in detail, it is confirmed that the main factors for such accidents are the quality problem of temporary equipment, unstable construction, and arbitrary change. As temporary structure is installed only for the construction of main structure, the reality is that no attention is paid to the construction of temporary structures.

  • PDF

Comparison of Characteristics for Establishing Quality Standards of Modular Buildings for Temporary Classrooms (임시교실용 모듈러 건축물의 품질기준 마련을 위한 특성비교)

  • Lee, Jong Sung;Park, Jae-Woong;Lim, Gun-Su;Kim, Jong;Han, Min-Cheol;Han, Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.83-84
    • /
    • 2023
  • Wall structure smart modular is a building construction method where modules are manufactured in a factory and assembled on-site. This method is gaining popularity in the construction industry as it reduces construction time and mitigates risks such as material supply and labor costs. Wall structure smart modular is necessary as it provides comfortable temporary classroom space during renovation and remodeling of aging school buildings. The structure and characteristics of each type of temporary classroom modular were compared, and wall structure modular showed superior performance in terms of height and weight competitiveness compared to mixed structures. With these advantages, wall structure modular can ensure economic efficiency and recyclability as a temporary classroom. In the future, we aim to compare and analyze the standards such as inter-floor noise and heat transfer coefficient for wall structure and mixed structures.

  • PDF