• Title/Summary/Keyword: Temporary Work

Search Result 305, Processing Time 0.023 seconds

EFFECT OF WORK CRUSHING SUGARCANE ON PREGNANCY AND LACTATION IN CATTLE AND BUFFALOES

  • van Thu, N.;Pearson, R.A.;Preston, T.R.;Fajersson, P.
    • Asian-Australasian Journal of Animal Sciences
    • /
    • v.9 no.4
    • /
    • pp.427-438
    • /
    • 1996
  • The suitability of female cattle ($Brahman{\times}Holstein$) and buffaloes (Murrah / Jafarabadi) for work on a sugarcane crusher was tested. The animals were fed chopped sugarcane tops and elephant grass supplemented with rice bran and urea-molasses blocks. In experiment 1, six cattle and six buffaloes, (with three animals seven to eight months pregnant at the start of the experiment in each group), worked individually, alternate weeks for 90 minutes a day for 6 d/week. Within the 90 min, cattle did more work than buffaloes (p < 0.05), and non-pregnant animals did more than pregnant animals, but cattle crushed significantly (p < 0.05) more cane per day than buffaloes. During work animals lost weight, but gained the weight back during resting weeks, when fodder intakes were higher. There were no significant differences in live weight change and fodder intakes between pregnant and non-pregnant animals during the six weeks. In experiment 2, four pairs of lactating cows and buffaloes crushed sugarcane for 3 h/d, 6 d/week for three weeks. Work done was higher in cattle than buffaloes, but cane crushed was marginally lower. All animals lost weight during work, particularly in the first week, but gained weight during the week after work. Daily milk yield was lower during the working weeks ($-0.55{\pm}0.15kg$) than in the week before work. Butter fat yield showed no significant change. One buffalo showed ovarian activity and oestrus behaviour during the work. Two cows showed ovarian activity within one month after the work. It was concluded that pregnant and lactating cows and buffaloes can effectively operate a cane crusher, however a temporary reduction in milk yield can be expected in the working period, and ovarian activity may be suppressed.

A Study on Interim Measures of Arbitration - the Korea domestic perspective - (중재에서의 임시적처분에 대한 연구 - 국내 중재를 중심으로 -)

  • Choi, An-Sik
    • Journal of Arbitration Studies
    • /
    • v.30 no.2
    • /
    • pp.121-144
    • /
    • 2020
  • If the interim disposition of the Arbitration Tribunal is not immediately enforceable, it will only give pressure to the other party concerned and the arbitration could work against him if the other party fails to implement it. If enforcement is impossible, the disposition will have no practical effect or practical benefit. In addition, if a system is contrary to its unique characteristics or nature, it will not function as a system or it will become an unnecessary decoration. There is no room for argument that the above provisions are wrong or misinterpreted if the temporary disposition in arbitration cannot be characterized by its characteristics, such as its provisionality, urgency, incidentality, or invasibility. As attracting international arbitration cases can create enormous added value for the national economy, countries are scrambling to create a mediating-friendly legal environment in their countries, and Korea has been more active in arbitration than in the past. Despite various efforts, however, attracting international arbitration cases is still a long way off. Therefore, Korea should create a mediating-friendly, legal environment to attract arbitration cases. There are many reasons why arbitration is activated internationally, but the most important of them is that it is easier to approve and execute. The use of the approval and execution of heavy court is, in turn, the most important requirement of a mediating-friendly environment. It is natural that temporary dispositions made in arbitration should be as easy to approve and enforce as in the case of arbitration. In addition, it is natural for the parties to consider the use of approval and execution when deciding where to mediate or when applying for arbitration; thus, the degree of ease of execution, along with the procedural use of arbitration or provisional disposition, will be a measure of the likelihood of hosting international arbitration cases, as well as the activation of arbitration.

Proposal of a mobility management scheme for sensor nodes in IoT(Internet of Things) (사물인터넷(IoT)환경에서 센서 노드들의 이동성 관리 방안에 관한 제안)

  • Park, Seung-Kyun
    • Journal of Convergence Society for SMB
    • /
    • v.6 no.4
    • /
    • pp.59-64
    • /
    • 2016
  • 6LoWPAN (IPv6 over Low Power Wireless Sensor Network) standardized by IETF does not support the mobility of wireless sensor nodes. Since the wireless sensor node, subject to a lot of constraints in the CPU, memory, a battery is not easy to apply to existing protocols such as Mobile IPv6. In this paper, we propose a novel mobility management architecture and methods to work with 6LoWPAN based on the analysis on FPMIPv6 (Fast PMIPv6) the host is not a handover procedure performed in order to support the mobility of such sensor nodes. It was suggested the use of a dispatch code pattern that is not currently used in 6LoWPAN for inter-working, MAG and MAC, MAC in order to reduce packet loss caused as the authentication delay in the handover process to minimize the power consumption of a sensor node that is caused by the re-transmission the new concept of temporary guarantee (temporary guarantee) and trust relationships (trust relationship) between AAA and introduced.

An Experimental Study on Compressive Loading Capacity of PCT System (PCT System의 압축내하력에 관한 실험적 연구)

  • Han, Man-Yup;Kim, Jae-Hong;Kang, Sang-Hun;Jin, Kyung-Seok;Jeon, Yong-Sik;Cho, Byung-Ku
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.11a
    • /
    • pp.41-44
    • /
    • 2008
  • The PCT that supports the walls of long span temporary shoring facility is previously manufactured in the way of prestressing, and it which is composed of concrete is improved precast structure to satisfy enough stiffness. The components of PCT are manufactured as a fixed form, and they are close to the inner side of the wall of temporary shoring facility by fixed means in PCT. PCT system as support structure is that the ends of concrete filled segment members are united by the means of connection and also they have connection hole. In this study, PCT has enough bearing power for the long span temporary shoring facility, and also make the term of work reduce due to that the time of curing reduce through the method of precast.

  • PDF

Comparison of Aerodynamic Responses for Cable-Stayed Bridges during Construction with Temporary Stabilizing Measures (내풍케이블 배치에 따른 가설 중 사장교의 공기역학적 거동 비교)

  • Cho, Jae Young;Kim, Young Min;Lee, Hak Eun
    • Journal of Korean Society of Steel Construction
    • /
    • v.19 no.2
    • /
    • pp.147-160
    • /
    • 2007
  • In this paper, we described the aeroelastic full-bridge model tests that were conducted to investigate the effect of alternative temporary stabilizing measures for thecable-stayed bridge during construction to ensure aerodynamic stability in the event of a typhoon or similar disasters. The effect of alternative temporary stabilizing measures was investigated through various configurations on two cable-stayed bridges with a main span of 475 m and 230 m, respectively. To investigate the bridge's aerodynamic behaviour and dynamic wind force during construction, the deflections at the end of the cantilever, the accelerations atthe top of the pylon and the moments at the lower part of the pylon were measured. As the result, the system with two sets of vertical cables per cantilever seemed to be the overall most effective solution, but the system with single vertical cable may also work. The combined system using the caisson support and vertical cables and the system with two sets of inclined cables per cantilever on the same anchor block may also be a solution. The inclined cables from the caisson to the girder were effective for some early stages of erecting the deck.

The Pattern of Labor Migration in Ansan and Their Local-Social Relationship (안산지역 이주노동자의 노동이주 유형과 지역-사회관계)

  • Lee, Taejeong
    • Korean Journal of Labor Studies
    • /
    • v.24 no.3
    • /
    • pp.73-107
    • /
    • 2018
  • The purpose of this study is to shed light on the characteristics of the social relations of migrant workers in the Ansan area and the factors for the construction of those characteristics. The social relations of migrant workers in the Ansan area are affected by the Korean government's policy of EPS, a short-term rotation policy and its ban on the settlement of migrant workers. These workers are likely to form a temporary and bounded social relationship. The bounded social relationship of migrant workers to society is one of the major factors that put them in social poverty. Ethnic communities, support organizations for migrant workers, and local government agencies have assumed the task of helping build the network among migrant workers of various ethnic backgrounds as well as aiding their participation in local social activities. The status of a temporary resident is the prime reason for spatial exclusion and social poverty among migrant workers. To prevent the exacerbation of these phenomena, this study suggests that the government reconsider its short-term work permit policy for less skilled workers.

A Study on Temporary Installation Art in Public Place (공공공간에서의 일시적 설치미술에 대한 연구 및 제언)

  • Zheng, zheng;Chen, juan;Ro, Hae-sin;Kim, Won-seok
    • Journal of Digital Convergence
    • /
    • v.17 no.1
    • /
    • pp.313-317
    • /
    • 2019
  • Installation art is another methodology of modern art appeared in 1970's. Installation art does not seek for a particular ideology or specific form to express, but rather it endeavors to produce a work produced by mutiful media convergence and integration. Therefore, this leads to inspire new cognition on ordinary places. Installaton art is strongly related with public art in terms of most works are to be exhibited. Thus from this point of view, installation art contains public art which aims to better communication among people, nature and artificial things. Eventually, temporary installation art contains communication and convergence of people and object in public places.

Risk Factor Selaction and Safety Management Plan in the Underground Excavation Construction (지반굴착공사에서의 위험요인 선정과 안전관리방안 연구)

  • Won, Yu-Jin;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.21 no.4
    • /
    • pp.31-37
    • /
    • 2019
  • When the foundation work of the underground part of the building structure or the excavation work of the civil engineering structure is carried out, there is the earthwork work by the inevitable process. As the economic situation continues to develop, construction in urban areas is becoming bigger and higher in scale due to the expansion of infrastructure and the rescue of urban dwellings in urban areas, and excavation of underground roads is inevitable. Excavation of the underground part may cause problems in the process difficulty and safety of the earthworks due to the complexity and various characteristics of the ground selected without consideration of the ground characteristics and site conditions. In order to complete the required facilities, it is necessary to secure the design and construction of the retaining walls. In order to complete the required construction, It is an important factor satisfying construction period and economical efficiency.

An Evaluative Study of Health Education Programs for Community-based Hypertension Control in Public Health Centers (보건소 고혈압관리 교육사업의 평가적 연구)

  • Lee, In-Sook
    • Research in Community and Public Health Nursing
    • /
    • v.15 no.4
    • /
    • pp.517-527
    • /
    • 2004
  • Purpose: This research is to find a solution for educational work on high blood pressure control in public health centers by analyzing their current status. Method: It analyzed data from 133 public health centers that had been doing educational work on high blood pressure, through a questionnaire. Also, it developed recommendations by converging opinions from an expert group made of 25 people with nominal group technique. Result: The educational methods of public health centers did not make any approach to get to the goal of the work. The mass media education and campaign activities for the general public had just temporary and passive propensities. In education for patients, it did not use appropriate methods to present management techniques for diagnosis process of patients, medication management, self monitoring BP, and risk factors. Pocket book for monitoring high blood pressure was not focused on self-recording for self-management. The expert group recommended that educational materials for adults should be developed focusing on treatments and observance of risk factors through daily living, and those for children should be focused on basic understanding about diseases, and life style. Conclusion: Presenting direction and strategy of fundamental education work is needed for public health centers by giving them standard educational guidelines of managing high blood pressure nationally, and it is desirable that fundamental frameworks of educational materials should be developed and distributed by professional groups nationally.

  • PDF

A Case Study on Value Improvement through applying VE Method in Stage of Railway Construction (시공 VE기법을 적용한 철도구조물의 가치향상 사례 연구)

  • Cho, Ki-Yon;Park, Mi-Yun;Kim, Sung-Hun;Seo, Jong-Won
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.23-29
    • /
    • 2008
  • Most VE operation related to construction project is progressed in stage of planing or design phase, especially in case of domestic. It is encouraging fact and if you have VE process in stage of planning and design, you'll have experience a reduction of about 70% of total saving cost in which total construction process may occurred. However, recently the work of construction in overseas increase and almost is only construction-work, except planning and design process. As this reason, VE process for construction-work phase only is demanded in high necessity. VE in construction phase comes to accomplish intensively in the part which the design change does not follow, through know-how, equipment operating method and method of temporary-structure erection at the established construction-site learned, builders will be the possibility of reduction from 3% to 10% in constructive expense. This paper describes VE performing example in OO company's construction-work phase, and propose the methodology of VE performance in the phase of construction. And also it is aimed to extending VE applications into the overseas construction enterprise.

  • PDF