• Title/Summary/Keyword: Temporary Construction

Search Result 498, Processing Time 0.025 seconds

A Study on Development of BIM-based Engineering Management System for Temporary Work (BIM기반 가설공사 업무지원시스템 개발에 관한 연구)

  • Choi, Changhoon;Han, Choonghee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.1
    • /
    • pp.61-69
    • /
    • 2020
  • As the amount of information generated in the construction project increases exponentially, design and construction review have a serious impact on the success of the site. For this reason, academic and business circles have been expanding the use of BIM at the whole life, and BIM is now accepted as one of the standards used in the construction industry. However, the BIM-based design for the temporary work is used as an aid to the 2D design because there is no specialized software and there is absolutely lack of a professional engineer. The objective of this research is to develop BIM-based temporary work support system. This system minimizes human errors in BIM-based design, quantity takeoff and inspection and shortens working hours.

Investigations of Vulnerable Members and Collapse Risk for System Support Based on Damage Scenarios (손상시나리오 기반 시스템 동바리 취약부재 도출 및 붕괴 위험성 분석)

  • Park, Sae In;Park, Ju-Hyun;An, Hyojoon;Lee, Jong-Han
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.25 no.1
    • /
    • pp.33-40
    • /
    • 2021
  • In recent years, many construction projects become large and complicated, and construction accidents also steadily increase, which grows interest in the safety and maintenance during construction. Many of the construction accidents are related to temporary construction and structures, but the safety evaluation and management during construction are unclear and indefinite due to the short operating period and continuous change in the formation of the temporary structure. The system support, which is one of the temporary structures to support the pouring load of concrete, was proposed to easily install and dismantle members with connection parts pre-manufactured. The use of the system support is increasing to improve the safety of the temporary structure during construction. However, the system support, which consists of multiple members, still has uncertainties in connectivity between members and supports of vertical members. Therefore, this study analyzed the structure, load, and accident cases of the system support to define the damage scenarios for member connection, support condition, and lateral displacement. The decrease rate of the critical load was analyzed according to the damage scenarios based on the defined unit structure of the system support. In addition, this study provided vulnerable members for each damage scenario, which could induce instability of the temporary structures during design, construction, and operation of the structure.

Application Range of "Temporary Alteration" in the Article 10 of Ship Safety Act (항만건설작업선의 선박안전법 제10조제3항(임시변경) 적용범위에 관한 연구)

  • Yeong-Tae Son
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.29 no.2
    • /
    • pp.177-187
    • /
    • 2023
  • The Ship Safety Act prescribes matters necessary for the maintenance of seaworthiness and safe navigation of ships. In this regard, Article 10 of this Act requires shipowner to undergo occasional survey if he/she wants to temporarily change intends to modify the details entered in a ship survey certificate. Such measures are in accordance with the maintenance of the state of the ship after the ship inspection under Article 15 of this Act, and this Act includes "harbor construction work ship" under Article 39 Paragraph (1) of the Harbor Act. However, although the harbor construction work ship originally showed the same operating system as the barge, it was not applied to the Ship Safety Act and was registered and surveyed under the Construction Machinery Management Act. Then "Seokjeong No. 36" sinking accident in Ulsan on December 14, 2012, led to the amendment of the Harbor Act in 2016, and considering the fact that it was added to the Ship Safety Act and applied, there is a realistic limit to applying all the regulations stipulated in the Ship Safety Act to the harbor construction work ship. Accordingly, this study discusses the work characteristics through concept, registration, work area, survey regulations, application case of temporary alteration etc. of harbor construction work ships and controversial issues related to the scope of application of the Ship Safety Act of actual harbor construction work ships, and also the appropriate scope of "temporary alteration" among temporary inspections prescribed in Article 10 of the Ship Safety Act in consideration of the legislative purpose of incorporating harbor construction work ships into the survey subject to the Ship Safety Act in accordance with the revision of the Harbor Act.

The Development and Application of KOESWall System (분리형 보강토 옹벽의 개발 및 적용사례)

  • 김영윤
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2001.10a
    • /
    • pp.323-328
    • /
    • 2001
  • In the ordinary reinforced earth wall, which was constructed by incremental construction method, the horizontal deformation of the facing due to the compaction induced horizontal earth pressure was unavoidable. Thus the KOESWall system which are adopted the isolated construction method was developed by I&S Eng. Co., Ltd. in 1999. Due to its systematical feature, KOESWall system is able to minimizes the horizontal deformation of reinforced wall effectively and it can be used as temporary structures more economically without the lacing block. In this report, it is shown that the concept and case histories of KOESWall system as a retaining structures.

  • PDF

AN AUTOMATED FORMWORK MODELING SYSTEM DEVELOPMENT FOR QUANTITY TAKE-OFF BASED ON BIM

  • Seong-Ah Kim;Sangyoon Chin;Su-Won Yoon;Tae-Hong Shin;Yea-Sang Kim;Cheolho Choi
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1113-1116
    • /
    • 2009
  • The attempt to use a 3D model each field such as design, structure, construction, facilities, and estimation in the construction project has recently increased more and more while BIM (Building Information Modeling) that manages the process of generating and managing building data has risen during life cycle of a construction project. While the 2D Drawing based work of each field is achieved in the already existing construction project, the BIM based construction project aims at accomplishing 3D model based work of each field efficiently. Accordingly, the solution that fits 3D model based work of each field and supports plans in order to efficiently accomplish the relevant work is demanded. The estimation, one of the fields of the construction project, has applied BIM to calculate quantity and cost of the building materials used to construction works after taking off building quantity information from the 3D model by a item for a Quantity Take-off grouping the materials relevant to a 3D object. A 3D based estimation program has been commonly used in abroad advanced countries using BIM. The program can only calculate quantity related to one 3D object. In other words, it doesn't support the take-off process considering quantity of a contiguous object. In case of temporary materials used in the frame construction, there are instances where quantity is different by the contiguous object. For example, the formwork of the temporary materials quantity is changed by dimensions of the contiguous object because formwork of temporary materials goes through the quantity take-off process that deduces quantity of the connected object when different objects are connected. A worker can compulsorily adjust quantity so as to recognize the different object connected to the contiguous object and deduces quantity, but it mainly causes the confusion of work because it must complexly consider quantity of other materials related to the object besides. Therefore, this study is to propose the solution that automates the formwork 3D modeling to efficiently accomplish the quantity take-off of formwork by preventing the confusion of the work which is caused by the quantity deduction process between the contiguous object and the connected object.

  • PDF

A Study on the Buckling Characteristics of Steel Pipe Scaffold (강관비계의 좌굴특성에 관한 연구)

  • Paik, Shin-Won;Song, In-Yong
    • Journal of the Korean Society of Safety
    • /
    • v.25 no.1
    • /
    • pp.57-61
    • /
    • 2010
  • Formwork is a temporary structure that supports its weight and that of fresh concrete as well as construction live loads. Scaffoling is a temporary frame used to support people and material in the construction or repair of buildings and other large structures. It is usually a modular system of metal pipes, although it can be made out of other materials. Bamboo is still used in some Asian countries like China. The purpose of a working scaffold is to provide a safe place of work with safe access suitable for the work being done. In construction site, steel pipes are usually used as scaffolds. In this study, scaffolding systems which is changed according to sleeper and joist space were measured by buckling test. Buckling load of respective scaffolding system was analyzed by structural analysis program(MIDAS). Buckling load of scaffold with/without wall connection and footboard was got by test and structural analysis. According to these results,we know that scaffolding system of case 3 is suitable. Buckling load of scaffold with wall connection is higher than without wall connection. So wall connection is important in scaffoling systems. Footboard in the scaffolding systems is not effective against promotion of buckling load. Finally, the present study results will be used to design scaffolding systems safely in the construction sites.

A Study of Modular Architecture's Design to Dwelling Environment in Antarctica (극한지 모듈러 건축물의 설계, 시공 및 거주환경에 대한 연구)

  • Lee, Won-Hak;Song, Young-Hak;Lim, Seok-Ho
    • Journal of the Korean housing association
    • /
    • v.25 no.2
    • /
    • pp.11-18
    • /
    • 2014
  • This study looked at designing, building and operating temporary camp, the first structures that South Korea built in the Antarctica. While there may be differences in accordance with the topography, ground surfaces in the Antarctica are covered broken stones, glaciers and snow. Hence, such topographical characteristics should be taken into account when conducting any construction work. To ensure successful assembly construction in the Antarctica using modules, prior trial assembly work should be done in Korea to identify any possible trouble in the actual construction process. Assuming that the workers will have to spend at least one winter in the temporary camp, the work will be more severely affected by adverse weather conditions and snow drift, resulting in the need to clear snow. This can be by designing roofs with curved surfaces. Also, quantitative effects will need to be verified through simulation and actual measurement. It will also be necessary to assess the camp's thermal environment and examine its air-conditioning methods. To identify the temporary camp's thermal system, the temperatures and humidities were measured, and the heating system was designed not to offer automatic control or desired value selection functions.

Analysis on Constructability Information and Design Elements by Construction Engineering Task at the Design Phase - Concentrated on Temporary Work in High-rise Building Projects - (설계단계 시공엔지니어링 업무별 주요 시공성 정보 및 설계요인 분석 - 고층 건축 프로젝트의 가설공사를 중심으로 -)

  • Lee, Jin Woong;Kim, Taehoon;Cho, Kyuman
    • Journal of the Regional Association of Architectural Institute of Korea
    • /
    • v.20 no.6
    • /
    • pp.97-104
    • /
    • 2018
  • Recently, as the shape and function of high-rise buildings have become more complex, engineering for reflecting the constructability in the design phase has the increasing importance. However, engineering tasks are not performed at the appropriate level and timing in most projects, which leads to inefficient work such as design changes and reworks. Hence, this study investigated the constructability knowledge, design elements, and supporting tools required to conduct engineering tasks related to temporary work at the design phase, and also analyzed the relationship between these factors using the correlation analysis. As a result, when the engineering tasks are applied in the design phase, constructability knowledge related to 'construction method and process' is the most important and the design factor related to 'layout/arrangement' should be considered as the most important factor. Based on the results of this study, the project participants can efficiently use necessary constructability knowledge during the design phase and facilitate effective decision-making and design alternatives for enhancing constructability.

Survey and Improvement Scheme for Safety Certification System of Temporary Equipment and Materials (가설기자재 관련 안전인증제도 실태조사 및 개선방안)

  • Won, Bang-Hee;Yoon, Kyeong-Won;Jeon, Sang-Soo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.7
    • /
    • pp.92-102
    • /
    • 2016
  • In this study, the systems and standards for temporary equipment and materials established in domestic and foreign countries are examined to provide improvement schemes and to insure their safety. Statistical analyses of the data obtained from the internet and/or field visit surveys of employees working in manufacturing, leasing, and construction companies related to temporary equipment and materials and improvement schemes were conducted to evaluate the implementation of a safety certification system for currently used temporary equipment and materials. This safety certification system has been enforced since 2009, but the number of accidents at construction sites, which are reported by the 'serious accident cases and measures in construction sites' group of the Korea Occupational Safety & Health Agency (KOSHA), has increased. The respondents' answers regarding the suitability of the items, which are required for the safety certification of the equipment and materials, were 'yes (36%)', 'no (30%)', and 'unknown (35%)'. Less than half of the answers regarding the current system were positive and most of the respondents answered that the current system does not reflect the evolution of the construction environment. A system is needed to approve items certified in foreign countries and newly developed materials and items, in addition to the (automatic) registration for the reuse of temporary equipment and materials, and improvements are needed in their safety. In this study, after examining the size and practicability of the items requiring approval from the current system, the certification methods are reevaluated and improvement schemes are provided for the system.

Case Studies for Temporary Soil Support Walls of Subway No.9 (지하철 9호선 흙막이 구조물의 설계 사례 분석)

  • 주재건;김영진;김경태
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.10a
    • /
    • pp.96-103
    • /
    • 2002
  • In this study, design concepts of Seoul Subway Construction (901∼914) are reviewed in relation to the cases for temporary soil support wall systems which are revealed in highly developed design competitions such as Turnkey and Alternative based on. Especially soil and rock properties, various design schemes for dealing with soil and water pressures, new technology adopted etc are discussed very profoundly and broadly for the better understanding and additional clues for constructing new design technologies.

  • PDF