1 |
Hyangjeon Kim, Shinwon Paik, "A Study on the Cause Analysis of Fall Accidents at Temporary Construction Sites", Journal of the Korean Society of Safety, Vol.25, No.1 pp. 62-64, 2010.
|
2 |
T.K. Oh, Y.G .Kim, M.G. Lee, S.W. Paik, I.S. Woo, C.G. Song, "A Study on the Design Change of High-Risk TemPorary Structures", Journal of the Korean Society of Safety, Vol.29, No.1 pp. 37-40, 2014. DOI: http://dx.doi.org/10.14346/JKOSOS.2014.29.1.037
DOI
|
3 |
Jin Seop Lee, Myeong Gu Lee, Dong Yul Lee, Tae Keun Oh, "A study on the Improvement of Effectiveness of KOSHA 19001 in Construction Industry", Journal of the Korean Society of Safety, Vol.30, No.3 pp. 80-84, 2015. DOI: http://dx.doi.org/10.14346/JKOSOS.2015.30.3.80
DOI
|
4 |
Korea Occupational Safety & Health Agency, "Fatal Accident Cases and Measures in Construction Sites", Report 129 p., 2016.
|
5 |
Y.S. Lee, M.G. Lee, Y.G. Kim, S.W. Paik, C.G. Song, D.H. Han, T.K. Oh, "The Analysis of the Current Situation in Design Change of Temporary Structures", Journal of the Korean Society of Safety, Vol.29, No.2 pp. 45-52, 2014. DOI: http://dx.doi.org/10.12812/ksms.2014.16.1.45
DOI
|
6 |
Sang-Wook Park, Jun-Mo Park, Ok-Kyue Kim, "The Classification Plan on Safety Certification System of Temporary Equipment", Korea Journal of Construction Engineering and Management conference, pp. 799-804, 2008.
|
7 |
Lee, Jeong-Seok, Choe, Jin-U, "A Feasibility Study of Safety Cetification for Finished Product of Febricated Temporary", Proceedings of the Safety Management and Science 2013 fall Conference, pp. 39-48, 2013.
|
8 |
Beop-Su Kim, Jun-Mo Park, Ok-Kyue Kim, Soon-Seop Kwak, Byeong-Ju Choi, Gil-Ho Song, "Improvement of Safety Certification System related on Construction Temporary Equipment", The Regional Association of Architectural Institute of Korea, pp. 319-322, 2011.
|
9 |
NEWSIS, Sequential Safety Accident, Questionab-le job performance Lotte Construction Co. [cited Mar. 26, 2015] Available from http://www.newsis.com/ar_detail/view.html?ar_id=NISX20150326_0013560530&cID=10401&pID=10400 (accessed Jul. 2, 2015)
|
10 |
NEWSIS, Police "Possibility of inappropriate ins-tallment of temporary Sadang Complex Gymnasium" search and confiscation of four companies [cited Feb. 13, 2015] Available from http://www.newsis.com/ar_detail/view.html?ar_id=NISX20150213_0013478528&cID=10201&pID=10200 (accessed Jul. 2, 2015)
|
11 |
Daejeonilbo, Causes of three deaths at a construction site of an university in Cheonan city[cited Jul. 6, 2015] Available from http://www.daejonilbo.com/news/newsitem.asp?pk_no=1176862 (accessed Jul. 7, 2015)
|
12 |
Kyungbookmaeil, Scaffolding collapse of newly constructed science and technology high school in Pohang city [cited Jun. 11, 2014] Available from http://m.kbmaeil.com/news/articleView.html?idxno=322550 (accessed Jun. 3, 2015)
|
13 |
A.S. Yassin, J.F. Martonik, "The effectiveness of the revised scaffold safety standard in the construction industry", Safety Science, Vol. 42, No. 10, pp. 921-931, 2004. DOI: http://dx.doi.org/10.1016/j.ssci.2004.05.001
DOI
|
14 |
OSHA "Scaffold use in the construction industry", Report, 25 p., 2002.
|
15 |
WORKSAFE "Scaffolding best practice guideline for scaffolding in new zealand", Report, 105 p., 2009.
|
16 |
CISRS "General information booklet", Report, 60 p., 2013.
|