• Title/Summary/Keyword: Technical Performance

Search Result 2,943, Processing Time 0.035 seconds

Integrated Planning Process Implementation Method Based on the Cost, Schedule, and Technical Performance (비용, 일정 및 기술적 성과를 고려한 통합 계획수립 프로세스 구현 방안)

  • You, Yi-Ju;Park, Young-Won
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.10 no.3
    • /
    • pp.100-108
    • /
    • 2007
  • The purpose of the research is to propose an integrated project planning process and its implementation method. Although there is increasing interest in the application of the Earned Value Management(EVM) method in the project management area, the progress and maturity of the technical performance have not been included in assessing the Earned Value. The main concept of the planning process is to use cost, schedule, as well as the technical performance in the assessment of the Earned Value Management for Military R&D project management practices. The resulting process can enhance the efficiency of the project work by eliminating the currently duplicated activities between traditional project planning process and the newly implemented Earned Value Management process and by shortening the early planning process duration of projects adopting EVM practices.

Zero forcing based sphere decoder for generalized spatial modulation systems

  • Jafarpoor, Sara;Fouladian, Majid;Neinavaie, Mohammad
    • ETRI Journal
    • /
    • v.41 no.2
    • /
    • pp.145-159
    • /
    • 2019
  • To reduce the number of radio frequency (RF) chains in multiple input multiple output (MIMO) systems, generalized spatial modulation (GSM) techniques have been proposed in the literature. In this paper, we propose a zero-forcing (ZF)-based detector, which performs an initial pruning of the search tree that will be considered as the initial condition in a sphere decoding (SD) algorithm. The proposed method significantly reduces the computational complexity of GSM systems while achieving a near maximum likelihood (ML) performance. We analyze the performance of the proposed method and provide an analytic performance difference between the proposed method and the ML detector. Simulation results show that the performance of the proposed method is very close to that of the ML detector, while achieving a significant computational complexity reduction in comparison with the conventional SD method, in terms of the number of visited nodes. We also present some simulations to assess the accuracy of our theoretical results.

Comparison of Educational Effects of Difficult Endotracheal Intubation in the 119 Rescue Service (119구급대의 어려운 기관내삽관 교육 전·후 비교)

  • Yun, Hyeong-Wan;Yu, Eun-Yeong;Yun, Young-Hyun
    • The Journal of the Korea Contents Association
    • /
    • v.11 no.1
    • /
    • pp.254-265
    • /
    • 2011
  • The purpose of this study was to examine the effect of difficult endotracheal intubation education in the 119 rescue services. The subjects in this study were 60 members of the 119 rescue services that was under the umbrella of the Fire Service Headquarters of J province. A SPSS 14.0 program was utilized to find out the effect of tough tracheal intubation education on their relevant knowledge, self-confidence, academic self-efficacy and technical Performance in consideration of general characteristics. The findings of the study were as follows: 1. They showed a significant improvement in all the knowledge, self-confidence, academic self-efficacy and technical Performance after they received that education. 2. As for connections between general characteristics and knowledge before and after that education, there were significant differences in their knowledge according to gender and career of working in the hospital, and their rank and career of working in the hospital made a significant differences to their self-confidence. Their academic self-efficacy significantly differed with rank, career of working in the hospital and academic credential. There were significant gaps among them technical Performance Case 1 according to career of working in the 119 rescue services, and technical Performance Case 2 significantly varied with age and academic credential. There were significant gaps in technical Performance Case 3 according to career of working in the 119 rescue services and career of working in the hospital after that education was provided, and technical Performance Case 4 significantly varied with age and rank before and after the education was conducted. In conclusion, the kind of education programs that aim at stirring up the interest of the 119 rescue services in advanced airway and helping the members learn about tracheal intubation accurately with confidence is urgently required.

A Study on the Management Plan through Performance Maintenance Analysis of Explosion-proof Facilities (방폭설비 성능유지 실태분석을 통한 관리방안 연구)

  • Kwon, Yong Jun;Byeon, Junghwan
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.2
    • /
    • pp.8-16
    • /
    • 2020
  • In Article 311 of the Regulation on Occupational Safety and Health Standards requires the use of Korean Industrial Standards Act in accordance with the Industrial Standardization Act. However, the classification, inspection, maintenance, design, selection, and installation of explosion hazard locations for explosion and explosion prevention and internalization of 'safety' in the performance maintenance phase of electrical machinery and equipment There is no technical and institutional management plan for remodeling and alteration. Analysis of actual conditions and problems related to the installation, use, and maintenance of explosion-proof equipment, comparative analysis of domestic and international technical standards and systems, technical, institutional and administrative systems and systems related to installation, use, and maintenance of explosion-proof equipment, technical personnel and qualifications, etc. It is to propose legislation, system improvement, and technical standard establishment related to the maintenance of explosion-proof facility performance through improvement of the necessity and feasibility study for establishment of the legal status of the management site and management plan. As technical measures, KS standard revision (draft), KOSHA guide (draft) and explosion-proof facility performance maintenance manual were presented. In addition, the institutional management plan proposed the revised rule on occupational safety and health standards, the revised rule on the restriction of employment of hazardous work, and the manpower training program related to the maintenance of explosion-proof facilities and the qualification plan. Enhance safety at the installation, use, and maintenance stage of explosion-proof structured electrical machinery. It is expected to be used to classify explosion hazards, select related equipment, and to update and standardize standards related to installation, use and maintenance.

The Board Size and Board Composition Impact on Financial Performance: An Evidence from the Pakistani and Chinese's Listed Banking Sector

  • MAJEED, Muhammad Kashif;JUN, Ji Cheng;ZIA-UR-REHMAN, Muhammad;MOHSIN, Muhammad;RAFIQ, Muhammad Zeeshan
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.7 no.4
    • /
    • pp.81-95
    • /
    • 2020
  • The main objective of this research is to investigate the impact of board size and board composition on financial performance of banks. The sample of this study consists on two countries listed bank sector Pakistan and China. The annul data is used from 2009-2018 to find the objective of this study. The Panel regression model is used to check the relationship between dependent and independent variables. Return on Asset and Return on Equity is used as performance checker dependent variables. The results of this study confirm board size coefficient value positive for ROA and negative for ROE but shows insignificant behavior for Pakistani banking sector while in Chinese banking sector the coefficient value of board size positively for ROA and ROE at 10% level. The board composition coefficient shows the negatively significant with ROA but insignificantly related to ROE for Pakistani banking sector. However, in Chinese banking sector the coefficient value of board composition is insignificant for both ROA and ROE. This study is helpful for banks, management of banks, policy makers, researcher as well as Government.

The Reformation of Gas Technical Standards System

  • Hur, Young-Taeg;Lim, Ha-Kyung;Lee, Su-Kyung
    • Journal of the Korean Institute of Gas
    • /
    • v.12 no.3
    • /
    • pp.20-23
    • /
    • 2008
  • The current gas regulations have been reformed into a new technical standards system called as "KGS (Korea Gas Safety) Code" system. Korea Gas Safety Corporation has developed a new framework of technical standards classification method and will manage the new technical standards system in compliance with the mandatory requirements of gas regulations. This study will cover an overall view of the reformation and show "KGS Code" in detail.

  • PDF