A Process of the Technical Performance Management for A Space Launch Vehicle R&D Project (우주발사체 개발사업을 위한 기술성능관리 프로세스)

  • Yoo, Il Sang;Cho, Dong Hyun;Kim, Keun Taek
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.10 no.2
    • /
    • pp.71-79
    • /
    • 2014
  • To enhance success probability of a system development project, its overall risk level should be minimized through systematically managing schedules, costs, and technical performances. However, Attempts to manage technical performance compared to numerous efforts to control costs and schedules in such projects are deficient. Particularly, a space launch vehicle, a large complex system, development project is much less likely to meet its technical performance objectives due to its technological difficulty, along with schedule delay and cost overrun. The technical performance management (TPM) is a method for tracking and managing technical progress in order to achieve technical performance targets within schedule and budget. In this paper, we investigate applications of the TPM in several space launch vehicle development projects. Then we propose and validate the TPM process to achieve a successful mission in such projects.

A Study on Economical Efficiency Evaluation of Semiforcing under Structure Watermelon Cultivators (반촉성 시설수박 재배농가의 경제적 효율성 분석)

  • Kim, Woong;Kim, Jai Hong
    • Korean Journal of Agricultural Science
    • /
    • v.33 no.2
    • /
    • pp.179-193
    • /
    • 2006
  • Technical efficiency of semiforcing watermelon growers is 0.8248 on average, and distributed between 0.6744 and 0.9268. The result showed that semiforcing watermelon growers had by 18% of technical inefficiency and could be assumed that increasing technical efficiency could induce watermelon production more increase. Consequently, if growers' technical efficiency were improved while other environments were constant, watermelon production could be increased. Following the results from the inefficiency effect model, all assumption coefficient such as growers age etc, are significant at 10% level. Estimate of dispersion parameter ${\gamma}$ is 0.89, which confirms those differences between practical output and frontier output were derived from the technical efficiencies among growers. Differences of production system between high and low level growers in production efficiency were showed at side altitude, ventilation and heat-retaining in section of facilities and automation, soil test and calcium application in section of environment management, transplant preparation and duration of pollination in section of crop management and shipment place, sorting degree and management record analysis in section of business management respectively. As a result of analyzing consulting data by using standard diagnosis table of watermelon cultivation under structure which cultivated on semi-forced watermelon growers, gap between high and low level growers was 7.0 points in facility automation section, 7.1 points in environment section, 8.8 points in crop management section and 13.6 points in business management section, respectively, which were the biggest one among them. In case of excluding information-related items from the evaluation index of business management section, changes of business achievement are to occur. Therefore, it is recommended for us to review the standard diagnostic table of watermelon cultivation under structure by dividing evaluation index of management section into management and information.

  • PDF

An Argument-based Approach to Manage Collaborative Negotiations in Software Systems Design

  • Lu, Stephen C-Y.;Jing, Nan
    • Industrial Engineering and Management Systems
    • /
    • v.7 no.3
    • /
    • pp.266-287
    • /
    • 2008
  • To manage collaborative negotiation in software system design, we have built a socio-technical argument-based negotiation management approach by integrating a Socio-technical Co-construction Process (STCP) with an Argument-based Negotiation Process (ABNP). This paper reviews relevant research work and presents each step of this approach. The STCP provides rich contextual information of technical decisions and social interactions in a system design process. The ABNP provides STCP with a negotiation management and conflict resolution strategy by guiding software engineers to generate, exchange and evaluate their argument claims in negotiation activities. In addition, this paper describes a prototype system which implements this new approach using the advanced Web-based software technologies with the goal of demonstrating how to systematically enhance the negotiation management capabilities in a dynamic socio-technical framework.

Study of Configuration Management Using Se Tool (SE 전산지원도구를 이용한 형상관리 방안 연구)

  • Park, Jong-Sun
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.7 no.1
    • /
    • pp.53-56
    • /
    • 2011
  • Configuration management plays a key role in systems engineering process for any project from earlier stage of development. It consists of five major activities, ie., configuration management planing, configuration identification, configuration control, configuration status accounting and configuration verification and audit, and is essential to control system design, development and operation throughout entire life cycle of the system development. And it is directly associated with other part of systems engineering management process, ie., technical data management which provides traceability of important decisions and changes during development. In this paper, we describe how to apply CASE(Computer-aided Systems Engineering) tool-Cradle for the configuration management to achieve effectiveness of Technical Management process.

A Study on the Systems Engineering Management Plan for the Railway Safety Project (철도안전프로젝트에 적용한 시스템엔지니어링 관리계획서 작성에 관한 연구)

  • Choi Yo-Chul;Cho Yun-Ok
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.4 s.35
    • /
    • pp.482-486
    • /
    • 2006
  • The Systems Engineering Management Plan (SEMP) is the primary, top level technical management document for the integration of all engineering activities at the project plan phase. This document defined the activities to plan, control, and perform overall engineering integration. To develop the SEMP for Railway Safety System, several standards are reviewed and analyzed. And then a common requirement for SEMP preparation is derived from the results of analysis. Also, the SEMP example available practically applies to Railway Safety System. In particular, The SEMP focused on controling technical program management has been organized so far, but in this study the detailed contents of SEMP put stress on project management is derived. And it is related to each other between project management and technical engineering management. At the end, to continuously manage the items and contents of the SEMP, a database management and an automatic document generation system is presented using Computer-Aided Systems Engineering (CASE) tool.

기술협력과 정보관리정책의 상관관계에 관한 고찰 -한.러 및 한.중 과학기술협력을 중심으로-

  • 곽동철
    • Journal of Korean Library and Information Science Society
    • /
    • v.27
    • /
    • pp.97-136
    • /
    • 1997
  • Korea has good mutual relations with Russia and China in many fields, not just in science and technology, but also in trade. That is, it stands on a point of time in which an epoch-making turning point for mutual interests could be realized depending on how to join Russia's high technology with Korea's industrial technology with capital, or how to connect Korean -Chinese mutual concern and each other's advanced technology. The purpose of this study is to present scientific and technical information management policy for efficient su n.0, pport for technical cooperation with Russia and China. Bearing this purpose in mind, the concept of technical cooperation along with scientific and technical information management policy was closely examined. The correlation between the progress of technology and the type of scientific and technical information was examined, while the flow of scientific and technical information accompanying technical cooperation was studied. The methodology adopted for this study includes document research, empirical analysis and fact-finding survey. For document research, the writer analyzed the contents of scientific and technical information managing operations and the types of information to be utilized in the course of technical cooperation by examining domestic and foreign documents on international technical cooperation. For empirical analysis, the contents of actual results of scientific and technical information managing operations for technical cooperation with Russia and China were put in order and analyzed, while contents of survey conducted by organizations related to these countries for technical cooperation were synthesized and examined for fact -finding survey.

  • PDF

A Study on The situation of Disasters and Characters of Technical Construction Firms (전문건설업종별 재해현황 및 특성에 관한 연구)

  • Jung, Sung-Hoon;Lee, Gil-Hwan;An, Kyui-In;Lim, Seong-Il;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.11 no.4
    • /
    • pp.93-109
    • /
    • 2009
  • The study focuses on analysing situation of disasters and characteristics in construction process which the technical construction firms accomplish. Besides, the study aims at the role and responsibilities of technical construction firms in construction safety. It is found out by a questionnaire and interviews in this study that safety control and management have a key role to prevent accidents in construction projects. Based on the result of the research, it is concluded that institutional improvement and support strategies are suggested and that additional to the support of the government and institutions in charge of the field of construction safety the effort of the first contractor, the second contractor and the laborer it is also important.

A Study on Management Performance and Efficiency of New Domestic Kiwi Fruit 'Gold' Growers (국산 참다래 골드 신품종 도입농가의 경영성과 및 경영효율성 분석)

  • Park, Jae-Hyoung;Chae, Yong-Woo;Park, Joo-Sub
    • Journal of Agricultural Extension & Community Development
    • /
    • v.23 no.2
    • /
    • pp.145-156
    • /
    • 2016
  • The purpose of this study is to analyze the farms growing domestic kiwi fruit 'Gold' on their management performance and efficiency in order to reduce the risks involved with introducing new kind of crops for growing, and suggest improvements. First, the result of analysis showed that domestic kiwi fruit 'Gold' growers' income were higher than the average growers due to the fruit's high unit price and productivity. Second, the analysis of management efficiency resulted in scale efficiency having greater impact on inefficiency rather than pure technical efficiency. As for the analysis of technical efficiency, the depreciation costs of agricultural facilities had the greatest influence on its inefficiency. Third, inefficient farms put in excessive inputs across the board, while labor costs(self labor cost + hired labor cost) were the largest factor of optimal inputs according to the models of technical efficiency and pure technical efficiency. Fourth, because of greater reliance on mechanical tools from rising labor costs, there's a need for individual farms to avoid buying farming equipments and instead share the equipments of nearby farms and agricultural cooperatives, or start renting agricultural machines from companies.

Technical Management Processes for Large National R&D Projects : Focused on Pyro Project (대형 국가 R&D 프로젝트의 기술관리 프로세스 : 파이로 프로젝트를 중심으로)

  • Kim, Jeong-Guk;Ko, Won-Il;Ku, Jeong-Hoe;Nam, Hyo-On
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.13 no.2
    • /
    • pp.34-41
    • /
    • 2017
  • The Pyro project, one of the large national R&D project to construct Korea Advanced Pyroprocessing Facility (KAPF), which has many goals such as development of pyro technology and process equipment, design of equipment and facility, construction, and test operation, is now under research and development. To reduce uncertainty and risk of such complex project, the technical management processes in systems engineering standards and NASA handbook were reviewed, and then the ten common technical management processes were selected for the large national R&D project to meet its goal successfully. And the essential technical management processes were finally suggested for Pyro project in consideration of current situation of the project.

Application of Project Management on Pyro Project (파이로 프로젝트에 프로젝트 관리 적용 방안)

  • Kim, Jeong-Guk;Kim, Hyuck-Jong;Ko, Won-Il;Ku, Jeong-Hoe;Nam, Hyo-On
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.13 no.2
    • /
    • pp.26-33
    • /
    • 2017
  • Pyro project, one of complex project, is now under research and development. To manage this kind project successfully, it is essential to apply the processes of technical management (TM) based on systems engineering (SE) and project management (PM). In this paper, the project management processes from ISO-21500 standard, PMBOK guide, and PRINCE2 guide were reviewed, and then some common PM for the large national R&D project were selected. An integrated technical management and project management frame work was finally established and suggested for Pyro project.