Many workers like welders are working in squat sitting postures with te object on the ground for an entire work shift. It is suspected that such prolonged squat sitting without any supporting stool would gradually cause musculoskeletal injuries to workers. This study is to quantitatively evaluate the physical stress caused by the prolonged squat sitting and to recommend a safe work/rest schedule for the task with squat sitting posture based on the lab experiment. In this study, 8 healthy student subjects participated in the experiment. They maintained a squat sitting posture for 16 minutes with 4 different stool height conditions: no stool, 10cm hight, 15cm height, 20cm height. Every 2 minutes, the discomfort was subjectively assessed using the magnitude estimation method for the whole body, lower back, upper leg and lower leg. Based on discomfort rating, we found that 10cm height stool relieved the workload most. Discomfort rating results also indicated that 20cm height stool showed the heghest workload, and that there was no difference in workload between 15cm height and no stool. We recommend to provide the workers with 10cm height stool for prolonged squat sitting tasks.
The methodology for maintenance system development should overall be considered with all of task characteristic, schedule, and the technical condition of investment sources. This research applies Waterfall model to methodology for the development and construction of maintenance system through customizing the CD (Custom Development) procedure of "HSDM (Hyundai System Development Methodology)" based on information engineering. The waterfall model called as classic life cycle paradigm is defined for the sequent development procedure, which make progress a next step after that a previous step is admitted with thorough review. This model which is popular and the oldest paradigm is used for system development by four steps; demands analysis, design, construction, and maintenance. This methodology advances higher abstract step from higher lower step using top-down approach from concept definition to construction, which notices the end of a step whenever a step is over. Therefore, each step is exactly divided, and consequently the output is clearly yielded.
Proceedings of the Korea Information Processing Society Conference
/
2017.11a
/
pp.566-568
/
2017
사람들은 자신이 해야 할 일들을 기억하기 위해 일정관리 애플리케이션을 많이 사용한다. 그러나 현재 나와 있는 일정관리 애플리케이션들은 정확한 시각에 해야 할 일을 기록하도록 되어 있다. 그래서 시각이 정해져있지 않은 일정은 따로 메모장에 기록하는 경우가 많다. 본 논문에서는 정확한 시간이 정해져 있는 일정(event)과 시간이 정해져 있지 않는 할 일(task)을 시간관리 매트릭스를 이용하여 관리할 수 있는 일정관리 애플리케이션의 개발내용에 대해 기술한다. 이 애플리케이션을 이용함으로써 할 일의 급박함과 중요도에 따라 적절한 알림을 받을 수 있게 되어 사용자의 일정관리에 도움을 줄 수 있게 될 것이다.
Astronomical outreach activities for the general public who are unfamiliar to astronomy is a challenging task. It requires creative thinking to solve the problem. The amateur astronomical clubs in a number of cities in Indonesia routinely schedule observations at public parks. The interaction between these clubs and formal education institutions is established by face to face interaction and assisted by social media. The physics teachers who took astronomy courses in university are potential resources to enlarge the outreach scope by creating astronomical clubs as an extracurricular activity. Recent progressive trends in astronomy dissemination for the disabled are also a great opportunity to assist the disabled in experiencing hands-on activities based on formal and informal education.
Journal of Construction Engineering and Project Management
/
v.7
no.4
/
pp.20-28
/
2017
In almost every construction project, delay is an inevitable yet controllable phenomenon. The Indian construction industry encounters an enormous amount of delays in projects. Delay affects both time and money in the forms of schedule and cost overruns, respectively. Due to impressive and dynamic growth in the Indian construction sector, planned efforts are essential to limit these undesirable delays. On account of the surge in the rate of residential building construction, the task of identification and analysis of the delays in residential projects in India has been attempted by the authors. A questionnaire survey was conducted involving 100 stakeholders. Further analysis included an Importance Index to rank the identified delays, Principle Component Analysis for advanced statistical analysis, and Correlation Analysis to check the extent of agreement amongst stakeholders. Conclusions drawn with reference to the analysed data eventually reflected finance-related issues, as well as labour related problems as the dominating causes of delays. The aim of the research is to provide insight to the construction stakeholders and researchers, on an international scale, with the obtained results.
Proceedings of the Korean Institute of Information and Commucation Sciences Conference
/
1998.05a
/
pp.342-347
/
1998
병렬 프로그램의 스케줄링 기법에 있어, 타스크 중복 알고리즘은 리스트 스케줄링 알고리즘에 비해 상대적으로 새로운 접근 방식이다. 타스크 중복이란 어떤 프로세서에 할당되어 있는 중요한(critical) 타스크들을 다른 프로세서에 중복시켜, 그 타스크들이 중복 실행하도록 프로그램을 스케쥴하는 것이다. 따라서, 중요한 타스크들이 같은 프로세서내에 있게 되어, 다른 타스크들의 시작 시간(start time)을 줄일 수 있게 된다. 이는 결국 전체 프로그램의 스케줄 길이(schedule length)를 줄이게 된다. 병렬 프로그램의 스케줄링 목적은 프로그램의 스케쥴 길이를 최소화하고, 스케줄의 complexity를 줄이는 것이다 그러나, 스케줄 길이와 complexity는 상호 trade-off 관계이다 본 논문에서는 기존의 중복 알고리즘과 비교하여, 스케쥴 길이를 승가 시키지 않으면서, complexity를 같거나 더 적게하는 알고리즘을 제시하여 컴파일 시간을 향상시키고자 한다.
International conference on construction engineering and project management
/
2005.10a
/
pp.1118-1123
/
2005
This paper proposes the CPM bar chart (CBC), a hybrid of the bar chart and the critical path method (CPM). The CBC overcomes shortages of the fence bar chart, while still retaining its advantages. The fence with direction is applied instead of the broken fence, which triggers considerable problems to identify and apply in the fenced bar chart. In addition, the notorious task to find dummy activities is no longer required. Upon the benefits of simplicity in the bar chart and logical work sequence in the CPM network, the CBC provides a relatively easy way to create and understand a schedule, thus improving communication quality between project participants.
Kim, Hojoong;Song, Inseong;Jeong, Yong Su;Choi, SangBang
Journal of the Institute of Electronics and Information Engineers
/
v.52
no.3
/
pp.116-126
/
2015
In a distributed heterogeneous computing system, the performance of a parallel application greatly depends on its task scheduling algorithm. Therefore, in order to improve the performance, it is essential to consider some factors that can have effect on the performance of the parallel application in a given environment. One of the most important factors that affects the total execution time is a critical path. In this paper, we propose the CLTS algorithm for a task scheduling. The CLTS sets the priorities of all nodes to improve overall performance by applying leveling method to improve parallelism of task execution and by reducing the delay caused by waiting for execution of critical nodes in priority phase. After that, it conditionally uses insertion based policy or duplication based policy in processor allocation phase to reduce total schedule time. To evaluate the performance of the CLTS, we compared the CLTS with the DCPD and the HCPFD in our simulation. The results of the simulations show that the CLTS is better than the HCPFD by 7.29% and the DCPD by 8.93%. with respect to the average SLR, and also better than the HCPFD by 9.21% and the DCPD by 7.66% with respect to the average speedup.
Soft real-time applications such as multimedia feature highly variable processor requirements and probabilistic guarantees on deadline misses, meaning that each task in the application meets its deadline with a given probability. Thus, for such soft real-time applications, a system designer may want to improve the system utilization by allocating to each task a processor time less than its worst-case requirement, as long as the imposed probabilistic timing constraint is met. In this case, however, we have to address how to schedule jobs of a task that require more than (or, overrun) the allocated processor time to the task. In this paper, to address the overrun problem, we propose an overrun control method, which probabilistically controls the execution of overrunning jobs. The proposed overrun control method probabilistically allows overrunning jobs to complete for better system utilization, and also probabilistically prevents the overrunning jobs from completing so that the required probabilistic timing constraint for each task can be met. In the paper, we show that the proposed method outperforms previous methods proposed in the literature in terms of the overall deadline miss ratio, and that it is possible to synthesize the scheduling parameters of our method so that all tasks can meet the given probabilistic timing constraints.
Lee Yoo-Seob;Cho Chang-Yon;Oh Kyu-Hoan;Kim Jung-Hun
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.123-130
/
2002
Project plan and control is a highly skilled task which is vital for business success, and Project control systems are important for successful project execution. To support construction process management effectively, an integrated cost and schedule control function is required to collect quality data in a timely manner and to provide quality historical data for future planning of new projects. In Korea construction industry, the development and implementation cases of a project control system which to efficiently support construction project planning and controlling processes, have been increased to ensure a project success and the profitability of a construction company. To contribute to improving practical effectiveness of a project control system, the paper reviewed and analyzed the current trends and functional features of current project control systems. And it also described the pending issues and their solutions faced on previous project control systems.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.