• Title/Summary/Keyword: Target Reliability

Search Result 821, Processing Time 0.032 seconds

The Study on the Demonstration Test of Quantitative Reliability Requirements for Rolling Stocks (철도차량 정량적 신뢰성 요구사항의 입증 시험에 관한 연구)

  • Chung, In-Soo;Kim, Jong-Woon;Lee, Kang-Won
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.3
    • /
    • pp.233-239
    • /
    • 2008
  • It is very important to set a reliability target and verify the requirement when procuring the rolling stock in the aspect of safety, availability and LCC. While there are a few different methods to verify the reliability target, it is required that the most appropriate method should be used considering the characteristics of rolling stock itself and the operation environment. Even though recently the quantitative reliability requirements are widely adopted in domestic market, there is no substantial contents in the various standards and guidelines. In this study we investigate the various reliability demonstration test plans and evaluate them for rolling stock application. And three test plans among them were applied to the real operation data.

Determination of Resistance Factors for Drilled Shaft Based on Load Test (현장타설말뚝의 주면지지력 저항계수 산정)

  • Kim, Seok-Jung;Jung, Sung-Jun;Kwon, Oh-Sung;Kim, Myoung-Mo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.427-434
    • /
    • 2010
  • Load Resistance Factor Design method is used increasingly in geotechnical design world widely and resistance factors for drilled shafts are suggested by AASHTO. However, these resistance factors are determined for intact rock conditions, by comparison most of bedrocks in Korea are weathered condition, so that applying the AASHTO resistance factors is not reasonable. Thus, this study suggests the proper resistance factors for design of drilled shaft in Korea. The 22 cases of pile load test data from 8 sites were chosen and reliability-based approach is used to analyze the data. Reliability analysis was performed by First Order Second Moment Method (FOSM) applying 4 bearing capacity equations. As a result, when the Factor of Safety(FOS) were selected as 3.0, the target reliability index($\beta_c$) were evaluated about 2.01~2.30. Resistance factors and load factors are determined from optimization based on above results. The resistance factors ranged between 0.48 and 0.56 and load factor for dead load and live load are evaluated approximately 1.25 and 1.75 respectively. However, when the target reliability are considered as 3.0, the resistance factors are evaluated as approximately 50% of results when the target reliability index were 2.0.

  • PDF

The Designs for Prediction of Future Reliability Using the Stochastic Reliabilit

  • Oh, Chung-Hwan;Kim, Bok-Mahn
    • Journal of Korean Society for Quality Management
    • /
    • v.21 no.2
    • /
    • pp.131-139
    • /
    • 1993
  • The newly proposed model of the future reliability results in earlier fault-fixes having a greater effect than the fault which make the greatest contribution to the overall failure rate tend to show themselves earlier, and so are fixed earlier. The suggested model allows a variety of reliability measures to be calculated. Predictions of total execution time(debugging time) is to achieve a target reliability. This model could also apply to computer-hardware reliability growth resulting from the elimination of design error and fault.

  • PDF

Reliability Modeling and Analysis Mettled of EMU (전동차 신뢰성 모델 및 분석 방법)

  • 신무승;김필환;구병춘
    • Proceedings of the KSR Conference
    • /
    • 2001.10a
    • /
    • pp.370-375
    • /
    • 2001
  • This paper is to suggest reliability modeling and analysis method of Electric Multiple Unit (EMU). It is necessary to identify subsystem/equipments of EMU and functional interfaces between subsystems in order to carry out reliability modeling of EMU properly. After identifying subsystem/equipments and functional interface, reliability allocation is performed using ARINC method. Reliability target of system/subsystems is verified in revenue service during the proper periods.

  • PDF

A Study on Reliability Based Design Criteria for Erection Members (가설부재의 신속성 설계기준에 관한 연구)

  • 민경주
    • Journal of the Korean Society of Safety
    • /
    • v.6 no.3
    • /
    • pp.56-63
    • /
    • 1991
  • This study investigates reliability based design criteria for the erection members, and proposes practical algorithm which is based on Ellingwood's algorithm for the reliability analysis and the derivation of reliability based criteria. The magnitude of the uncertainties associated with load effects are chosen primarily by considering our level of practice. And thus the uncertainties so obtained are applied for the reliability analysis and the derivation of reliability based design criteria. A target reliability($\beta$$_{o}$=2.0) is selected as an appropriate value by analyzing the reliability levels of our current USD and WSD design standards. Them a set of load and resistance factors corresponding to the target reliability is proposed as a reliability based design provision, and furthermore a set of allowable stresses for steel having same level of reliability with the corresponding LRFD criteria is also prepared for the current WSD design provision. It may be concluded that the proposed LRFD reliability based design provisions and the corresponding allowable stresses give more rational design than the current code for erection membars.s.s.

  • PDF

System Structure and Reliability Optimization of VVVF Urban Transit Brake System Through Cost Function Construction (비용함수를 이용한 VVVF 전동차 제동장치의 시스템 구조 및 신뢰도 최적화)

  • Kim, Se-Hoon;Kim, Hyun-Jung;Bae, Chul-Ho;Lee, Jung-Hwan;Lee, Ho-Yong;Suh, Myung-Won
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.15 no.3
    • /
    • pp.63-71
    • /
    • 2007
  • During the design phase of a product, reliability and design engineers are called upon to evaluate the reliability of the system, The question of how to meet target reliability for the system arises when estimated reliability or cost is inadequate. This then becomes a problem of reliability allocation and system structure design. This study proposes the optimization methodology to achieve target reliability with minimum cost through construction of the cost function of system. In cost function, total cost means the sum of initial cost, repair cost and maintenance cost. This study constructs optimization problem about system structure design and reliability allocation using cost function. This problem constructed is solved by Multi-island Genetic Algorithm(MIGA), and applies to urban transit brake system. Current brake system of the urban transit is series system. Series system is the simplest and perhaps one of the most common system, but it demands high reliability and maintenance cost because all components must be operating to ensure system operation. Thus this study makes a comparative study by applying k-out-of-n system to brake system. This methodology presented can be a great tool for aiding reliability and design engineers in their decision-makings.

Reliability Evaluation of ATC for High-Speed Line Center (고속 Line Center의 ATC 신뢰성 평가)

  • Lee Seung-Woo;Lee Hwa-Ki;Shin Dong-Hwan
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.23 no.6 s.183
    • /
    • pp.111-118
    • /
    • 2006
  • Recently, the reliability evaluation and analysis are applied far many industrial products which are required to guarantee in quality and efficiency. The purpose of this paper is to present some of reliability evaluation methodologies that are applicable to machine tools. Especially ATC (Automatic Tool Changer), which is a core component of line center, was chosen as the target of the reliability evaluation and analysis. The scope of research is reliability prediction, reliability test and evaluates their results. The results of reliability evaluation have shown the failure rates, MTBF (Mean Time Between Failure), reliability for those components of ATC and real tests reliability through the constructed reliability test-bed. It is expected that proposed methodologies would increase reliability for a high-speed line center.

Reliability Prediction & Design Review for Core Units of Machine Tools (공작기계 핵심 Units의 신뢰성 예측 및 Design Review)

  • 이승우;송준엽;이현용;박화영
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2003.06a
    • /
    • pp.133-136
    • /
    • 2003
  • In these days, the reliability analysis and prediction are applied for many industrial products and many products require guaranteeing the quality and efficiency of their products. In this study reliability prediction for core units of machine tools has been performed in order to improve and analyze its reliability. ATC(Automatic Tool Changer) and interface Card of PC-NC that are core component of the machine tools were chosen as the target of the reliability prediction. A reliability analysis tool was used to obtain the reliability data(failure rate database) for reliability prediction. It is expected that the results of reliability prediction be applied to improve and evaluate its reliability. Failure rate, MTBF (Mean Time Between Failure) and reliability for core units of machine tools were evaluated and analyzed in this study.

  • PDF

Reliability Evaluation of ATC for High Speed Line Center (고속 Line Center의 ATC 신뢰성 평가)

  • Lee S.W.;Kim D.H.;Lee H.K.;Shin D.H.
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2005.06a
    • /
    • pp.1914-1917
    • /
    • 2005
  • Recently, the reliability evaluation and analysis are applied for many industrial products, and many products are required to guarantee in quality and in efficiency. The purpose of this paper is to present some of reliability evaluation methodologies that are applicable to machine tools. Especially ATC(Automatic Too Changer), which is core component of line center, was chosen as the target of the reliability evaluation and analysis. The scope of research is reliability prediction, reliability test and evaluates their results. The results of this research has shown the failure rate, MTBF(Mean Time Between Failure), reliability for those components and real tests reliability through constructed reliability test-bed. It is expected that proposed methodologies will increase reliability for high speed line center.

  • PDF

A Study on the Target Coverage of the ICM (개량고폭탄의 표적제압에 관한 연구)

  • Choe Gwang-Muk;Min Gye-Ryo
    • Journal of the military operations research society of Korea
    • /
    • v.12 no.1
    • /
    • pp.50-70
    • /
    • 1986
  • When the ICM is fired in the artillery weapon, it is necessary to determine rounds of munitions for sufficient damage to targets of different sizes and shapes. This paper analyzes all kinds of delivery errors involved in ICM firing, and then develops the target coverage model appropriate for ICM salvos. This model is evaluated through computer simulation. The expected target coverage is measured according to number of salvos, range and probable error, velocity error, battery arrangement, target size, and shell reliability respectively.

  • PDF