• Title/Summary/Keyword: Take off

Search Result 909, Processing Time 0.03 seconds

Basic Research on BIM-Based Quantity Take-off Guidelines

  • Yun, Seokheon;Kim, Sangchul
    • Architectural research
    • /
    • v.15 no.2
    • /
    • pp.103-109
    • /
    • 2013
  • Various types of building information should be linked to 3D model objects for their effective use by stakeholders. Because Building Information Modeling (BIM) based on 3D is used by different stakeholders, the created BIM need standard guidelines for each purpose, as, for example, for quantity take-off. Thus, this study was conducted to propose guidelines for BIM modeling for quantity take-off in the framework, especially, in the concrete and form. The proposed guidelines adopted each element of the BIM model based on an analysis of the problem of the general BIM model. Moreover, the usability and accuracy of the reinforced structure modeling guidelines were verified by comparing the quantity of the commercial estimation software and the modeling quantity using the proposed modeling guidelines.

The Late Take-off Phenomenon in the Diffusion of Telecommunication Services : Focused on the Fax Markets (통신서비스의 늦은 수요 확산 현상에 관한 연구 : Fax 서비스를 중심으로)

  • 임병락;최문기;박명철
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.27 no.2
    • /
    • pp.81-96
    • /
    • 2002
  • Telecommunication services are distinctive in that their adoptions are influenced by network effect resulting in 'the late take-off phenomenon' and the 'critical mass' problem. In this paper we examined, so called, 'the late take-off phenomenon' in the diffusion process of telecommunication services. We compared the parameters of the diffusion process of consumer durables with those of fax services in the US and Korea. By analyzing the parameters of a new diffusion model based on the threshold model proposed by Markus, we found that 'the late take-off phenomenon' resulted from the low heterogeneity of the threshold distribution for the potential adopters. A simulation approach was proposed for the theoretical implication of the 'critical mass' problem in the start-up telecommunications services.

The 3D Numerical Analysis on the Predictions of Flight Stability at Take-off and Landing (Crosswind 60°) (이.착륙 비행 안정성 예측을 위한 3차원 수치해석(측풍 60° 방향))

  • Sheen, Dong-Jin
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.20 no.1
    • /
    • pp.94-102
    • /
    • 2012
  • The aim of this paper is to research the change in the turbulent flow and the AOA occurred by $60^{\circ}$ crosswind to the direction of runway through the three-dimensional numerical analysis and to predict the take-off and landing flight stability. As a result, the maximum amplitude of AOA variation on runway reached $4.88^{\circ}$ within 7 second because of the wake formed by the constructions in the vicinity of the airport, and the overall effects appeared as an irregular aperiodic forms. Additionally, it was observed that the layout and shape of the buildings effected on the strength of turbulence directly, and the rapid flow generated between the buildings changed into stronger wake and eventually expected that the flow raises serious take-off and landing flight instability.

Quantity Takeoff for Non-Selection Work Items based on BIM (BIM 기반 비선정 작업항목 물량산출 방법에 관한 연구)

  • Park, Sang-Hun;Yoon, Sun-Jae;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.92-93
    • /
    • 2019
  • Estimates based on BIM makes it possible to perform from quantity take-off to construction cost estimates by using model, which is made in the phase of design and construction. As the BIM models are made up of the units of element, there an advantage of the automative quantity take-off, if the correction or change of element occurs. Work items, not included in the elements of the BIM model, are excepted from bill of quantity. Level of detail(LoD) of the BIM model can be improved for detailed estimates, but an excessive modeling for estimates is inefficient. This study presents the measure for selection and quantity take-off of work items, those are not expressed in the BIM model. The proposed method avoids the creation of excessive BIM Models and enables quantity take-off in conjunction with the element.

  • PDF

Biomechanical Analysis of Take-Off Techniques of Women's High Jump Winners at IAAF World Championships, Daegu 2011 (세계일류여자높이뛰기선수의 발구름 기술에 대한 바이오메카닉스적 분석)

  • Bae, Young-Sang;Kim, Eui-Hwan;KIm, Ki-Man;Lee, Jeong-Min;Kim, Sung-Sup;Kwon, Moon-Seok;Wi, Ung-Ryang
    • Korean Journal of Applied Biomechanics
    • /
    • v.21 no.5
    • /
    • pp.585-593
    • /
    • 2011
  • The purpose of this study was to analyze, from a kinematical point of view, the high jump techniques of three women's high jump winners at the IAAF World Championships, Daegu 2011. The trends for the techniques of the world's top high jumpers were examined, with a view toward adapting these techniques to the physical characteristics of Korean women's high jumpers. It was valuable that Di Martino, who was the shortest in height, was able to win a medal by using a single arm swing take-off technique, along with a half flexed leading leg swing to attain a deep arch and clear the bar. This showed that the world's top athletes used jumping techniques with no decrease in the run-up velocity at the take-off. Furthermore, It appeared that the knee joint angle at take-off had a direct effect on the body position at take-off (H1).

A Study on Automated Quantity Take-off Methods of Earth Works in Road Design using 3D Design Concept (3차원 설계를 통한 도로설계단계의 토공 자동물량 산정 방안에 관한 연구)

  • Cho, Myunhwan;Kim, Nakseok;Chae, Jae-Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.2
    • /
    • pp.277-283
    • /
    • 2016
  • Recently, the interests in three-dimensional design and BIM(Building Information Modeling) are increasing in civil engineering sector and the researches about three-dimensional design and quantity take-off methods for civil engineering structures have been conducted. However, these studies are just carried out the 3D design and quantity calculation of civil structures on the road or railway such as bridges and tunnels. The study on the quantity take-off methods and the evaluation of calculated results on the earth works should be performed in more detail. Based on these backgrounds in mind, the study was conducted the three-dimensional road design and evaluated the quantity take-off results on the earth works using 3D calculation method(average end area method, prismoidal method and composit method). The calculated quantity from composit method showed about 5% error of measuring efficiency than the average end area method, and when reporting the quantity calculation of earth works, it is necessary to specify the calculation method using quantity take-off of earth works.

The kinematic analysis of the Hurdling of Men's 110m Hurdle (남자 국가대표 110m허들선수의 허들동작에 관한 운동학적 분석)

  • Lee, Jung-Ho
    • Korean Journal of Applied Biomechanics
    • /
    • v.14 no.1
    • /
    • pp.83-98
    • /
    • 2004
  • The purpose of this study was to determine the kinematic variables of the hurdling for a korea record holder (A) and a national hurdle representative (B). after the kinematic variables such the distance and the distance and height of C.G, the velocity and the angle were analyzed about the hurdling. The results were summarized as follows; 1. In terms of the distance and the height of C.G, subject A showed long in horizontal distance from C.G to the take-off phase, but showed short in the landing phase. Subject B showed short in horizontal distance from C.G to the take-off phase, and showed long in the landing phase. 2. In terms of the velocity of C.G, Subject A showed fast C.G velocity in horizontal direction to the braking phase, Subject A and B showed slower C.G velority in the landing phase, but Subject A showed height C.G velocity in vertical direction to the to the take-off, the landing, and propulsion phase 3. In terms of the angle of C.G and lean of C.G to front at the braking and the take-off phase. Subject A kept the less angle in the maximum trunk lean to front at the flight phase as comparison with Subject B. 4. In terms of the velocity of the knee and the ankle joint. Subject A showed fast in the resultant velocity of the left ankle joint the take-off phase, but showed slow in the left knee joint. Subject B showed fast in the resultant velocity of the left knee joint the take-off phase, but showed slow in the right knee and the right ankle joint.

A Study on the Optimal Cut-off Point in the Cut-off Sampling Method (절사표본에서 최적 절사점에 관한 연구)

  • Lee, Sang Eun;Cho, Min Ji;Shin, Key-Il
    • The Korean Journal of Applied Statistics
    • /
    • v.27 no.3
    • /
    • pp.501-512
    • /
    • 2014
  • Modified cut-off sampling is widely used for highly skewed data. A serious drawback of modified cut-off sampling is the difficulty of adjustment of non-response in take-all stratum. Therefore, solutions of the problems of non-response in take-all stratum have been studied in various ways such as substitute of samples, imputation or re-weight method. In this paper, a new cut-off point based on minimizing MSE being used in exponential and power functions is suggested and it can be reduced the number of take-all stratum. We also investigate another cut-off point determination method with underlying distributions such as truncated log-normal and truncated gamma distributions. Finally we suggest the optimal cut-off point which has a minimum of take-all stratum size among suggested methods. Simulation studies are performed and Labor Survey data and simulated data are used for the case study.

Algorithm for the Reinforced Concrete Framework Materials Take-off (철근콘크리트조의 골조물량산출 알고리즘)

  • Kim Tae-Hui;Hong Chae-Gon;Kim Sun-Kuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.1 s.13
    • /
    • pp.114-121
    • /
    • 2003
  • The precise quantity of materials is not yet taken off by the CAD system although it has Influenced in design productivity and automatic estimate. And various estimate systems developed so far deal with the quantity take-off of building members separately, which caused to over-estimate the part of each member. Therefore, the purpose of this paper is to develop algorithms of more precise estimate than that of current estimate by solving boundary conditions of the connection parts of building members, such as column, girder, beam, wall and slab. The algorithms are proposed to take off the quantity of concrete and form work and they will be used for the estimate of building structure more precisely and automatically than ever.

A Take-off Clearance Prediction Model for Mixed Mode Runway Operations (출·도착 혼합 사용 활주로에서의 관제사 이륙 허가 예측 모형 개발)

  • Hong, Sungkwon;Jeon, Daekeun;Kim, Hyounkyoung
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.24 no.3
    • /
    • pp.48-54
    • /
    • 2016
  • This paper proposes a prediction model of air traffic controller's take-off clearance under mixed mode runway operations. The proposed model has its purpose on the better prediction of the air traffic controller's clearance on take-offs of departure aircraft by considering various factors. For this purpose, support vector machine classification algorithm is used for the proposed model. The proposed model is applied to real air traffic operations to demonstrate its performances.