• Title/Summary/Keyword: TP+GG Coupled Test

Search Result 10, Processing Time 0.02 seconds

Prediction of Startup Characteristic for 30 tonf Liquid Rocket Engine TP-GG-CC Coupled Test (30톤급 액체엔진 TP-GG-CC 연계시험에서 시동특성예측)

  • Moon, Yoon-Wan;Kim, Seung-Han;Kim, Chul-Woong;Seol, Woo-Seok
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2009.11a
    • /
    • pp.62-65
    • /
    • 2009
  • This study for prediction of startup characteristics for 30 tonf liquid rocket engine TP-GG-CC coupled test was performed on the basis of the previous TP-GG test and prediction results. For determining the valve sequence the startup analysis was performed by the specified program for several main valve time and the adequate valve sequence for startup could be obtained.

  • PDF

Study on Turbopump and Gas Generator Coupled Tests (터보펌프+가스발생기 연계시험 연구)

  • Kim, Seung-Han;Nam, Chang-Ho;Seol, Woo-Seok
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2007.11a
    • /
    • pp.155-158
    • /
    • 2007
  • As a secondary stage of the liquid rocket engine development test, turbopump-gas generator powerpack tests are being performed. The schematics of the test hardware and the test facility for the TP+GG coupled test are presented. The results of a preliminary test results for the verification of the propellant supply system of the test facility are also presented. Based on the preliminary tests results, the verification of the propellants supply systems of the facility system was performed.

  • PDF

Improvement of the Startup Transient Analysis on the Liquid Rocket Engine Using the TP+GG Coupled Test Result (터보펌프+가스발생기 연계시험 결과를 이용한 액체로켓엔진 시동 과정에 대한 해석 방법의 개선)

  • Park, Soon-Young;Cho, Won-Kook;Moon, Yoon-Wan
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2011.11a
    • /
    • pp.821-826
    • /
    • 2011
  • The turbopump+gas generator (TP+GG) coupled test for the liquid rocket engine development was performed. By comparing the results of a engine startup transient analysis with this test results, the verification of the analysis model was performed. From this, as to the analysis of the engine startup, the method calculating the pressure ratio of the turbine during the initial stage of startup was improved. And a fact that the transient heat transfer phenomenon between the working fluid and the solid parts of turbine effects to the calculation of turbine pressure ratio and consequentially to the startup analysis was revealed.

  • PDF

Turbopump+Gas generator Startup Simulation Cold Flow Test (터보펌프+가스발생기 연계시험기 시동모사 수류시험)

  • Kim, Seung-Han;Nam, Chang-Ho;Kim, Cheul-Woong;Moon, Yoon-Wan;Seol, Woo-Seok
    • Aerospace Engineering and Technology
    • /
    • v.8 no.2
    • /
    • pp.19-25
    • /
    • 2009
  • This paper includes test results of 30tonf-level TP+GG startup simulation cold flow test using liquid oxygen and kerosene. Test objectives, coupled test plant configuration, test condition, test procedure of performed tests, and test results are presented.

  • PDF

Design of Turbopump+Gas Generator Coupled Test (터보펌프+가스발생기 연계시험 설계)

  • Kim, Seung-Han;Nam, Chang-Ho;Kim, Cheol-Woong;Seol, Woo-Seok
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2006.11a
    • /
    • pp.196-200
    • /
    • 2006
  • This paper describes the current development status of the major subsystems, turbopump and gas generator, for a turbopump-fed liquid oxygen-kerosene rocket engine system. As a secondary stage of the liquid rocket engine development test, turbopump-gas generator powerpack tests are planned. The schematics of the test hardware and the test facility for the TP+GG coupled test are presented. The results of a preliminary analysis for operating regimes of the TP+GG coupled test are also presented.

  • PDF

Turbopump+Gas generator Open-loop coupled test (터보펌프+가스발생기 개회로 연계시험)

  • Kim, Seung-Han;Nam, Chang-Ho;Kim, Cheul-Woong;Moon, Yoon-Wan;Seol, Woo-Seok
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2008.11a
    • /
    • pp.125-128
    • /
    • 2008
  • As a interstage of the 30tonf level LOx/kerosene liquid rocket engine development, turbopump-gas generator open-loop coupled tests are performed. Test schematic and test results of open-loop coupled tests are presented. In engine system operation environment simulating combustion chamber by flow control orifice, chill-down procedure, startup characteristics, nominal operability of turbopump+gas generator open-loop coupled Test Plant are confirmed The results of open-loop coupled test were used for the preparation on turbopump+gas generator closed-loop test.

  • PDF

Analysis for Operation Point Change in Mode Transition at the Turbopump-Gas Generator Coupled Test (터보펌프-가스발생기 연계시험의 모드 변환 중간 작동점 분석)

  • Nam, Chang-Ho;Kim, Seung-Han;Park, Soon-Young;Kim, Cheul-Woong
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.13 no.1
    • /
    • pp.43-50
    • /
    • 2009
  • The characteristics at the intermediate operation point of the turbopump-gas generator(TP-GG) coupled test were investigated by analytical method. The pump outlet pressure, gas generator mixture ratio, gas generator pressure, and temperature were examined considering risk minimization of test. The engine system shows different behavior from the TP-GG coupled test at the intermediate operation point since the combustion pressure feeds back to the flow rate in the lines. The advanced valve changes in the combustor line helps less risky mode transition.

Turbopump+Gas generator Closed-loop coupled test (터보펌프+가스발생기 폐회로 연계시험)

  • Kim, Seung-Han;Nam, Chang-Ho;Kim, Cheul-Woong;Moon, Yoon-Wan;Seol, Woo-Seok
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2008.11a
    • /
    • pp.129-132
    • /
    • 2008
  • For the development of the 30tonf level LOx/kerosene liquid rocket engine, turbopump-gas generator closed-loop coupled tests are performed. To simulate engine operation conditions, combustion chamber was substituted by flow control orifices. In simulated engine system operation environment, chill-down procedure, startup characteristics, nominal operability of turbopump+gas generator coupled Test Plant are confirmed. Turbopump and gas generator are confirmed to operate well in simulated engine environment. The control system for regulating power and mixture ratio of Test Plant are also successfully confirmed.

  • PDF

Study on the Characteristics of Turbopump+Gas generator Closed-loop coupled test (터보펌프+가스발생기 폐회로 연계시험 특성 연구)

  • Kim, Seung-Han;Nam, Chang-Ho;Kim, Cheul-Woong;Seol, Woo-Seok
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2009.11a
    • /
    • pp.38-41
    • /
    • 2009
  • For the technology development of LOx/kerosene liquid rocket engine, turbopump-gas generator closed-loop coupled tests using 30tonf main engine components such as turbopump and gas generator except combustion chamber are performed. In the engine system operation environment, simulating combustion chamber by flow control units, the chill-down procedure, startup characteristics, nominal operability and smooth shutdown of turbopump+gas generator closed-loop coupled Test Plant are successfully confirmed. The serviceability of the turbopump and gas generator are evaluated. The feed-back control system for the turbopump rotational speed and gas generator mixture ratio are also verified. The results of closed-loop coupled test will be used as the technology development for the liquid rocket engine.

  • PDF

A Study of Chill-down Process in 30 tonf Turbopump-Gas Generator Coupled Tests (30톤급 터보펌프-가스발생기 연계시험에서 예냉 절차 연구)

  • Moon, Yoon-Wan;Nam, Chang-Ho;Kim, Seung-Han
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2012.05a
    • /
    • pp.447-450
    • /
    • 2012
  • An analysis of chill-down process was performed for 30 tonf Turbopump-Gas generator coupled tests. The chill-down process must be fulfilled before liquid rocket engine test using cryogenic propellant. Cavitation, damage and/or combustion instability due to bubble of propellant must be eliminated by chill-down process in a test specimen, especially cryogenic pump. The analysis of test data obtained by 30 tonf TP-GG coupled tests was performed in order to be based on the test process of KSLV-II liquid propellant rocket engine which will be developed. To macroscopically understand the process of chill-down from the viewpoint of test procedure the temperatures of important part and total time of chill-down process were analyzed.

  • PDF